Requests Extension to mid-Mar 1980 to Verify Remaining Isometric Piping Drawing to Complete Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys.
ML19256F444
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/08/1979
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19256F437 List:
References
IEB-79-14, NUDOCS 7912190150
Download: ML19256F444 (2)


Text

.

"'T GENER AL OFFICE g

cp t.- y ne Nebraska Publ.ic Power District

.=_c-.-- .._....._____._ -_

P. O. DO X 499, COLUMBUS. NEllR ASKA 68601 m e m O~c o e ne u s6 November 8, 1979 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Suite 1000 Arlington, TX 76011

Subject:

IE Bulletin 79-14 " Seismic analysis for As-Built Safety-Related Piping Systems"

Reference:

1. Letter from J. M. Pilant (NPPD) to K. V. Seyfrit (NRC) dated October 30, 1979

Dear Mr. Seyfrit:

Reference 1 transmitted Nebraska Public Pover District's response to Item No. 3 of the subject bulletin. This latter is written to further clarify, at the request of the I&E Staff, two items in our response.

All safety-related systems at Ceoper Nuclear Station have been in-spected and compared to as-built isometric piping drawings, with the exception of one (1) RHR piping isometric which contains four (4) hangers. NPPD requests an extension of time for verifying this one remaining isometric until the next refueling outage commencing approximately mid-March 1980. This extension of time is necessary to preclude shutdown and drysell head removal specifically for the purpose of inspecting this one section of RHR piping. This request is not considered to represent a significant deviation from the safety goals of IE Bulletin 79-14 because these four (4) hangers represent only .27% of the approximately 1500 hangers thus f ar inspected under IE Bulletin 79-14 with satisfactory results.

Additionally, NPPD requests an extension of time f." the completion of Item No. 3 of IE Bulletin 79-14 until February 29, 1980. By this date our architect-engineer will have completed their assessment of all isometric drawings resulting f rom the inspections performed at CNS.

Based on the absence of safety-significant nonconformances discovered to date under IE Bulletin 79-14, this request is considered to involve . _ s- .

a negligible risk to the health and safety of the public. If any

  • nonconformance is found as a result of this review, uated under IE Bulletin 79-14 requirements.

it will be eval- 16 3f): 1)9 5 7 9 : 219 0 /ji~()

Mr. Karl V. Seyfrit November 8,1979 Page 2 If you have any questions, or require additional information on this matter, please do not hesitate to contact me.

Sincerely,

\M.

J. Pilant Director of Licensing and Quality Assurance JDW/cmk cc: Director of the Of fice of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Director of the Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 9