REGULATORY I'RMATION DISTRIBUTION SYS'R'IDS)
ACCESSION NBR;8102180296 DOC ~ DATE: 81/02/13 NOTARIZED; NO DOCKET FACIL:50"250 Turkey Point PlantP Unit 3P Florida Power and Light C
05000250 50-251 Turkey Point PlantP Unit OP Flor ida Power and Light C
05000251 AUTH BYNAME AUTHOR AFFILIATION UHRIGg R ~ E ~
F'lor,ada Power 8 Light Co, REC IP ~ NAME RECIPIFNT AFFILIATION EISENHUTPD.G.
Division of Licensing
SUBJECT:
Requests extensions in schedule for imp,lementation of fire, protection mods re water supression sysPfire doorsicurbs 8
control room combustibles.Mods will be completed by 810802
~
Class III L Clas I fees encl' DISTRIBUTION CODE:
A0060 COPIES RECEIVED:LTR Q ENCL Q SIZE:
~
TITLE: Fir e Pr otection Information (After Issuance of OP,'ic,)
NOTES: Q(Qg~~g g + f~
RECIPIENT ID CODE/NAME ACTION:
VARGAg S ~
00 COPIES LTTR ENCL RECIPIENT ID CODE/NAME COPIES LTTR ENCL INTERNAL: CHEM ENG BR"A 7 5
ICE 06 2
OE L.D 1
HAMBACHeT~
10 1
DIR P DIM OF LIC NRC 02 G
01 EXTERNAL: ACRS NSIC 09 1b 05 LPDR 03 0
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 37 ENCL
~
I
'1 il
~l
~v CCJ, ~
)1&
OQ AIJ ld Ga UJ C
~)~
r.)~()
C)~-
. BOX 629100, MIAMI,FL 33162
~)gllly~
i Pkw v4X N FLORIDA POWER 8L LIGHTCOMPANY February 13, 1981 L-81-51 Office of Nuclear Reactor Regulation Attention:
Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.
C.
20555 Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Fire Protection
Dear Mr. Eisenhut:
In accordance with 10 CFR 50.48 (d), Florida Power and Light Company will require an extension in the schedule for completing the following fire protection modifications at Turkey Point Units 3 and 4.
As discussed below, the remaining few modifications are in various stages of completion,
- however, procurement delays have extended the schedules.
Water Su ression S stem SER Item 3.1.6) entrances to protect the doorway in the south wall is in progress.
The labyrinths, curbs and roofs by February 25, 1981.
The doors are scheduled
- 981, and pending receipt are scheduled to be The existing doors have been covered with Marinite the Staff to provide acceptable protection in the Construction of the labyrinth of the 4160V switchgear rooms are scheduled to be completed to be delivered by March 20, 1
installed by March 30, 1981.
board which was considered by interim.
A revision to the original modification was proposed on October 20, 1980 (L-80-346) and accepted by the Staff on January 26, 1981.
The revised modi,fication consists of a labyrinth entrance to the 4160V switchgear rooms.
The interior of the 4160V switchgear room has an operational early warning detection system in the vicinity of the door, and HADs for the auxiliary transformer deluge system are in close proximity to the exterior of the door.
Thus detection of an off-normal condition, of the type for which the labyrinth-door modi'fication is provided,. would be annunciated in the Control Room.
Additionally, the Nuclear Turbine Operator inspects this area in the course of shift surveillances.
ff.b04 5
81021805" 0 PEOPLE... SERVING PEOPLE
Ol a
~
I Office of Nuclear Reactor Regulation Page Two Fire Protection SER Item 3.1.9)
Two of the seventeen doors have been replaced with fire doors.
Nine fire doors have been hung and are in various stages of completion.
Due to procurement problems associated with the fire doors and accessory
- hardware, the total modifi'cation will not be completed until May 4, 1981.
Pending completion of this modification, adequate protection is considered:
to, be afforded.
Early warning fire detection with annunciation in the Control Room is provided on at least one side of each of the doors.
Additionally, frequent patrols by operations and guard force personnel would detect any off-normal condition of the type for which FPL is providing the modification.
Curbs.
SER Item 3.1.13)
This item is complete with the exception of the curbs beneath the fire doors on the lower level of the switchgear rooms and in the west wall of the south diesel generator room.
This involves a total of five curbs which cannot be completed until the fire door installation (SER Item 3.1.9 above) is complete.
These curbs are scheduled to be installed by April 8, 1981.
Adequate protection is provided as discussed above in SER Item 3.1.9.
Control of Combustibles SER Item 3.1.15)
All items have been completed, except for installation of the Emergency Diesel Generator tank isolation valves.
Two of the valves for this modification are non-standard and are scheduled for delivery on June 9, 1981.
Pending receipt, this item is scheduled to be completed by August 2, 1981.
Adequate protection is provided for the reasons discussed in Section 8.5.3.13 of the evaluation transmitted by our letter of February 25, 1977 (L-77-57).,
Additi'onally, frequent patrols by guard force and operations personnel would detect any off-normal condition of the type for which FPL is
,providing the modifications.
The fire protection modifications already complete provide reasonable assurance that public 'health and safety is properly protected.
The completion schedules discussed above are reasonable estimates of the time required to complete the remaining few modifications.
Adequate alternate protection is afforded pending completi'on of these i'tems.
We have: determined that this involves a Class III and Class I request.
Accordingly, a'heck, for four thousand, four hundred dollars
($4,400) is attached.
Very truly yours, ober t E. Uhrig Vice President Advanced Systems and Technology REU/RAK/mc Attachment cc: