Requests Extension to Submit Results of Investigation Re Possible Nonconservatism of Scram Setpoints for Transient as Compared to Setpoints Assumed in Safety Analysis.Results Will Be Submitted by 810831
ML19350E390
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/15/1981
From: Hukill H
METROPOLITAN EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
L1L-188, NUDOCS 8106220267
Download: ML19350E390 (1)


Text

s i

e Metropolitan Edison Company e

e Post Office Box 480 Middletown, Pennsylvania 17007 s

Writed Direct Dial Nurneer June 15, 1981 LlL 188 e

n

$f Office of haclear Reactor Regulation 2

7 Attn:

J. F. Stolz, Chief J U// y g 7g

{O.M,_ u,4, A.g Operating Reactors Branch No. 4 7

upross U. S. Nuclear Regulatory Commission Washington, D.C.

20555 igm

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Scram Setpoints This letter is in response to your letter of January 14, 1981, concerning the possible non-conservatism of the scram setpoints for certain transient as compared to those assumed in the safety analysis. Our previous response of April 23,1981, (LlL 098) stated an investigation into this problem was in progress and the results would be c,vailable by June 12, 1981. The in-vestigation has not been completed, therefore, we are requesting an extension to submit the results by August 31, 1981.

Since TMI-l will be in a shutdown condition during the interim period, the deferral of these ret. Its does not constitute a safety issue.

Sincerely, D. M Director, IMI-l HDH:DGM:vj f cc:

L. Barrett D. DiIanni B. H. Grier B. J. Snyder H. Silver gh