Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Requests Documents Containing Info Needed for Fuel Cost Study". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19308A686  + (Requests Documentation Identified in Items 1-6 of 790822 Memo Committing to Extensive QA & QC of Mdhr Sys.Also Requests Notification When Welds Have Been Finished & Hydrostatic & Startup Test Procedures Have Been Submitted)
  • ML19326C544  + (Requests Documentation Identified on NRC 780711 Facility Visit Re PWR Cold Leg Integrity.Info Required to Evaluate Postulated Large Cold Leg Breaks)
  • ML20052E450  + (Requests Documentation Needed for State Historic Preservation Officer to Make Determination of Eligibility of May House)
  • ML20115A888  + (Requests Documentation Re Encl R Sugarman FOIA-83-783 Request for Three Categories of Documents on Plant.Response Requested by 830110)
  • ML20117N866  + (Requests Documentation Re SER 850409 Conclusions Concerning Environ Qualification of Equipment.Review Warranted Based on Util Poor History Re Claims of Environ Qualification)
  • ML20010C031  + (Requests Documentation Used in Formulating 810722 Order to Show Cause,Especially Documentation Re Surface Condition or Finish of Package,In Order to Respond)
  • ML20091J840  + (Requests Documentation for Listed Const Implementation Overview Items)
  • ML20091B463  + (Requests Documentation for Listed Drawings Re Module 120D Const Implementation Overview)
  • ML20141M400  + (Requests Documentation of Changes to Plant Emergency Plan Proposed at 920724 Meeting & Submittal of Schedule for Developing & Implementing Proposed Changes within 30 Days of Receipt of Ltr)
  • ML20003H844  + (Requests Documentation of Comments on Proposed Rules 10CFR30,32,70 & 150 Re Exemption of Tc-99 & Low Enriched U as Residual Contaminant of Smelted Alloys)
  • ML14188B706  + (Requests Documentation of Commitments & Actions Responsive Under 10CFR50.54(f) Re Single Failure Criterion,Electrical Sys,Per 900419 Meeting.Util Should Commit to Demonstrate That Plant Can Meet Equivalent Degree of Safety in GDC)
  • ML19339A027  + (Requests Documentation of Compliance W/Nrc Regulations by 801114 Per Discussions During 800910 Meeting)
  • ML20041C256  + (Requests Documentation of Extent of Compliance w/10CFR20,50 & 100.Response Due by 820221)
  • ML18033A229  + (Requests Documentation of Fuel Assembly Characteristics, Including Key for Location of Fuel Rods & Tables Describing Reconstituted Bundle Rods & Doner Bundle Rods.Response to Encl Questions Re Accountability of SNM Also Requested)
  • ML19341B304  + (Requests Documentation of Maint Records Re Preservice Insp & Testing of Snubbers Due to Problems W/Inoperable & Incorrectly Installed Snubbers.Preservice Exam Should Be Made of Snubbers Listed in STS Tables 3.7-4a & 3.7-4b)
  • ML20217L875  + (Requests Documentation of Reassessment That Was Made Last Dec & Any Further Staff Evaluations of GSI 150 Issue,Per 970801 Telcon)
  • ML18057B309  + (Requests Documentation of Receipt of Encl Change Notice for Rev 3 to EI-13)
  • ML19273B394  + (Requests Documentation of Seismic Conditions & Max Environ Conditions During Postulated Accidents to Complete Review of Mod Re Cooling safety-related Electrical Equipment Rooms. Info Requested within 30 Days)
  • ML20032E783  + (Requests Documentation of Snubber Maint for Unit 2.Cites Areas to Be Verified in Preservice Exam & During Preoperational Testing.Test Program Should Be Specified in Fsar,Chapter 14)
  • ML20214A239  + (Requests Documentation of Training & Experience for Each Physician User as Outlined in 10CFR35.910,Subpart J,In Response to 870331 Application for License.W/O Stated Encl)
  • ML20211K724  + (Requests Documentation on Final Disposition of Eight Pacemakers Implanted in Patients During 1974-1976,per 810421 Insp,Within 30 Days)
  • ML19242A793  + (Requests Documentation on Purging of Containment Vessel, KR-85, & Radioactive Waste Water.Expresses Concern Re 790725 Release of Radioactive Water Into Susquehanna River & Requests Notification of Public Hearings)
  • ML20073Q319  + (Requests Documented Acceptance of General Motors Electro-Motive Div (EMD) Mi 9644 Mod as Acceptable Alternative to Diesel Generator Prelube Oil Pump.Emd Clarification of Prelube Requirements Encl)
  • ML20153G926  + (Requests Documented Responses to Encl Questions Re Decommissioning Plan,In Support of Application to Decommission L-77 Research Reactor,Per 860113 Telcon W/ Rocketdyne.Response Requested within 30 Days of Ltr Date)
  • ML20102B607  + (Requests Documents 7-11-7-13 Referenced by W Lawless for Insp & Copying.Addl 30 Days Provided to File Depositions. Depositions Scheduled for 850306-15.Related Correspondence)
  • ML19320C814  + (Requests Documents Containing Info Needed for Fuel Cost Study)
  • ML19249A321  + (Requests Documents Developed Since 740101 Re Uncertainty in Calculation of Event Probabilities & Consequences & Resulting Risks,Utilizing Probabilistic Risk Assessment Methodologies)
  • ML20090A543  + (Requests Documents Identified in 800313 Corps of Engineers Ltr to NRC Containing Results of Soil Investigations Completed After Discovery of Aug 1978 Settlement Problem & Covering Soil Explorations)
  • ML19294B132  + (Requests Documents Identified in CA Energy Commission 800117 Interrogatory Responses,Copy of Contract Between CA Energy Commission & H Lewis & H Lewis & F Finlayson Statements of Qualification.W/Certificate of Svc)
  • ML20004B299  + (Requests Documents Leading to Formation of NRC Decisions & Proposals Impacting Radiation Protection Stds,Regulations & Legislation.Info Is Needed for Use in Development of Chronology of Radiation Protection Events)
  • ML19261B963  + (Requests Documents Pertaining to Recent Geological Investigation in Order to Determine Facility Compliance W/ County Ordinance Code & Use Permits)
  • ML19330A023  + (Requests Documents Produced for Opposing Intervenors Insp Re Dow Chemical Co Processes & Methods for Which AEC Claim of Privilege Was Overruled)
  • ML20128G567  + (Requests Documents Re 960726 Announcement That NRC Staff Proposed Fine Against Syncor for Deliberate Misuse of Radioactive Matl at Nuclear Pharmacy & All Info Re Syncor)
  • ML20082E420  + (Requests Documents Re Emergency Planning for Schuykill River,Delaware River & City & County of Philadelphia)
  • ML20064D225  + (Requests Documents Re Facility Be Sent to Listed Address in Nararve,Mn.Also Requests That N Hatlie Be Placed on Distribution List)
  • ML19249B725  + (Requests Documents Re Insp Rept 50-244/74-01)
  • ML19261C624  + (Requests Documents Re Licenses,License Applications,Insp Repts & Waste Disposal Records of Nuclear Radiation Corp, Theodore Schwalm & Co,Us Radium Corp & Self Powered Lighting)
  • ML19263D130  + (Requests Documents Re NRC 750625 Site Insp,Analyses of Relay Failures That Occurred During 750607 Seismic Event, Seismic Qualification of safety-related Equipment & SRP)
  • ML20210K174  + (Requests Documents Re Radiochemical Issues for Industrial Excess Landfill Superfund Site Located in Uniontown,Oh in Order to Prepare for Public Info Session)
  • ML19247B615  + (Requests Documents Re Radiological Emergency Response Plans for Nuclear Power Plants,Including Info Re 10CFR50,App E NUREG-0396 & NUREG-75/111)
  • ML20212H271  + (Requests Documents Re Releases Affecting Public Health & Safety That Might Occur Should Steam Tube Fail or Any Primary to Secondary Leak of Substantial Size Occur.Related Info Encl,Including Two Excerpts from Util/B&W Trial Record)
  • ML20035B692  + (Requests Documents Re Review of Beco Operability Determination & Agreement W/Conclusion Under FOIA Act)
  • ML19330C465  + (Requests Documents Re TMI & Listing of Repts Issued by NRC)
  • ML20150E064  + (Requests Documents Relating to Constr of Pwr Plants in the Next 15 Years in VA or Wv)
  • ML20205M644  + (Requests Documents Resulting from Required Analysis of Misalignment of Annulus Embedded Plate Discussed in Section 4.3, Design of Structural Elements of Integrated Design Insp Rept Issued in Apr 1984)
  • ML20091F296  + (Requests Documents Subj to Encl FOIA Request 84-158 Re Novak Visits to Site or Region During Sept-Dec 1982.Related Info Encl,Including Tera Corp Agenda for 840313 Meeting Re Idcvp)
  • ML19249C179  + (Requests Documents for Period 760101-790801 Re Westinghouse License Applications XR-120,XCOM-0013 & XSNM-1471,procedures for Export Licenses & Philippine Reactor Project)
  • ML20059L962  + (Requests Documents for Regulatory History Package Re Final Rule That Amends NRC Regulations to Reflect Administrative Change Concerning Increase in Fee Charged for Processing Nuclear Power Plant Fingerprint Cards)
  • ML19283B648  + (Requests Documents from NRC IE Manual & Interpretations Re ANSI)
  • ML19270E830  + (Requests Documents of Insp of Facility Const,Including Correspondence on Alleged Records Falsification)
  • ML20040F746  + (Requests Doe,Oak Ridge Operations Ofc & Union Carbide Corp, Oak Ridge Natl Lab Be Registered as Users of Model 6272)