Requests Documented Acceptance of General Motors Electro-Motive Div (EMD) Mi 9644 Mod as Acceptable Alternative to Diesel Generator Prelube Oil Pump.Emd Clarification of Prelube Requirements Encl
ML20073Q319
Person / Time
Site: LaSalle  
Issue date: 04/26/1983
From: Schroeder C
COMMONWEALTH EDISON CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
6446N, NUDOCS 8304290034
Download: ML20073Q319 (3)


Text

'

f

,A 4

[

N Commonwealth Edison

) One Fust Nationa! Ptiza. Chicigo. Illinois

\\

is 7 Addr:s3 R ply to: Post Office Box 767

/ Chicago, Illinois 60690 April 26, 1983 Director of Nuclear Reactor Regulation Attention:

Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

LaSalle County Station Units 1 and 2 Diesel Generator Prelube Oil Pump Operating License NPF-11, Condition 2.C.21.b NRC Docket-Nos. 50-295 and 50-304 References (a):

LaSalle County Station Unit 1, Facility Operating License NPF-ll, Condition 2.C.21.b.

(b):

SER Section 9.6.3.4.

(c):

C. E. Sargent letter to A. Schwencer dated October 8, 1981.

(d):

C. E. Sargent letter to A. Schwencer dated November 18, 1981.

(e):

C. W. Schroeder letter to A.

Schwencer dated October 6, 1982.

(f):

C.

W.

Schroeder letter to Director of Nuclear Reactor Regulation dated February 14, 1983.

Dear Sir:

Reference (a) requires, in part, that:

"A prelube pump, powered from a reliable direct current power supply, be installed in the system to operate in parallel with the engine-driven lube oil pump, or an alternative acceptable to the NRC shall be installed to preclude dry-starting of the diesel engine."

References (b).through (f) represent various iterations in the resolution of this topic.

Reference (f) contained a copy of Mr. J. G.

Hayden's (EMD) letter dated January 24, 1983, which provided EMD's position on prelubrication.

I 8304290034 830426 I

PDR ADDCK 05000295 N..

, c;

't Director 'of NRR April 26, 1983 During a telecon between Commonwealth Edison personnel and Dr.

A. Bournia, et al, on March 1, 1983, the NRC indicated they had one

. remaining concern, namely:

In the January 24, 1983 letter from EMD, Item 4 is not clearly addressed as being non-applicable following the installation of MI 9644.

If this is the case, obtain a statement from EMD.

Subsoquently, we asked EMD. clarify their prelubrication require-

.ments.

In a letter dated March 28, 1983, Mr. Hayden stated that periodic prelubrication is not required on engines equipped with the EMD MI 9644 modification.

No engine bearings are subjected to marginal conditions that require prelubrications bocause engines with this modification are fully lubricated during first four or five revolutions at startup.

The EMD letter is attached for your information.

Because the enclosed letter fully addresses the NRC's remaining concern, Commonwealth Edison Company requests that the NRC provide us with documentation of your acceptance of the EMD MI 9644 modification as en acceptable alternative to the prelube pump.

To the best of my knowledge and belief the statements contained herein and in the attachment are true and correct.

In some respects these statements are not based on my personal knowledge but upon infor-mation furnished by other Commonwealth Edison and contractor employees.

Such information has been reviewed in accordance with Company practice and I believe it to be~ reliable.

If there are any further questions in this matter, please contact this office.

One (1) signed original and forty (40) copies of this letter and the attachment are provided for your use.

Very truly yours, tl2ds3 C. W. Schroeder Nuclear Licensing Administrator 1m cc:

NRC Resident Inspector - LSCS 6446N L.

S

,s

', tuo 1020 e

i e

inter-organization To:

Memorandum Oste: March 28, 1983 FILE: 164-0 From:

J. G. Hayden sutgect:

ENGINE pRELUBRICATION REQUIREMENTS Consistent with the facts presented in my letter of January 24, 1983, engines equipped with MI 9644 immersion heater systems are fully lubricated during the first four or five revolutions at startup.

Because of this rapid response, no engine bearings are subjected to marginal conditions that require prelubrication. Based on extensive experience, we strongly recommend that periodic prelubrication not be attempted on engines equipped with HI 9644 immersion heater systems.

John G. Hayden, Assistant General Service Manager Marine & Industrial JGH/jr cc:

M. Arbuckle (S&S)

T. Boyce (S&S)

D. W. Chirikos H. W. Falter (PSD)

M. J. Fleckenstein G. A. Klippel D. L. Schroder K. J. Williams T. G. Winfield o

Dectro-Motive DMslon General Motors Corporation LaGrange, tilincts 60525 l