Category:CORRESPONDENCE-LETTERS
MONTHYEARST-HL-AE-2394, Summarizes 871022 Telcon W/Gl Constable Requesting Extension to 871112 to Respond to Notice of Violation 50-499/87-48-01. Request Made to Facilitate Addl Executive Mgt Review of Work Being Performed as Result of Violation.Date Acceptab1987-10-23023 October 1987 Summarizes 871022 Telcon W/Gl Constable Requesting Extension to 871112 to Respond to Notice of Violation 50-499/87-48-01. Request Made to Facilitate Addl Executive Mgt Review of Work Being Performed as Result of Violation.Date Acceptable ML20235B4531987-09-22022 September 1987 Final Response to FOIA Request for Documents Re Specified Dockets.Documents in App a Already Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Documents for Listed Dockets Could Not Be Located ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20140F3691986-01-14014 January 1986 Further Response to FOIA Request for Several Categories of Documents Re Pressure Suppression Containment.Fsar & SER for Limerick Only Documentation Re 4x4 Tests.Encl Apps D-G Documents Responsive to Item 4 Also Available in PDR ML20039F8541982-01-0606 January 1982 Respectfully Declines to Pay 811214 Assessed Review Charges Pending Outcome of Litigation Re Validity for Fees.Several Utils Have Opposed NRC Proposed Collection Actions ML19347D3491981-03-12012 March 1981 Responds to NRC 810223 Request for Addl Info Re Util Plans for Facilities.Completion of Cherokee 1 & 2 Has Been Indefinitely Delayed.Commercial Operating Dates for Cherokee 3 & Perkins 1,2 & 3 Have Not Been Determined ML19318A9191980-06-17017 June 1980 Forwards PSC of MD Order 64338,closing Case 6603,PEPCO Application for Certificate of Public Convenience & Necessity for Const of Two Nuclear Power Plants,Due to Util 800602 Withdrawal of Application ML19309H8791980-05-0808 May 1980 Withdraws Application for Early Site Review for Facility. Load Growth Forecasts Continue to Indicate Little Possibility That Util Will Commence Const within Validity Period of Early Site Review Findings ML19305D8961980-03-21021 March 1980 Responds to NRC & Central & South West Corp Comments Re Consolidation.Severance Arguments Based on Belief That Util Will Rely on Study by Stagg Sys,Inc as Part of Defense.Util Will Not Rely on Stagg Study.Certificate of Svc Encl ML19253C1271979-11-0101 November 1979 Identifies Documents Not Produced in Southwestern Electric Power Co Document Production.Documents Necessary for Review. Production Date Will Be Set at Hartley Deposition. Certificate of Svc Encl ML20136C4951979-09-20020 September 1979 Forwards Info from State of MD Re site-specific Data on Selected Potential Util Development Sites in Southern MD ML20136C3111979-09-14014 September 1979 Forwards Addendum to Site Selection Study for Two 1,100 MW Nuclear Power Plants, in Response to NRC 790824 Request for Addl Info ML19207C1761979-09-0404 September 1979 Confirms That Info Requested in NRC 790824 Ltr Will Be Submitted by 790915 ML19246A7301979-06-25025 June 1979 Forwards Questions Re Ecological Monitoring Site.Requests Response by 790716 ML19246A8421979-05-0101 May 1979 Notifies That Depositions Have Been Taken from Rl Steder of Ppg Industries & Ev Sherry of Air Products & Chemicals. Central Power & Light Has Furnished NRC-requested Documents to City of Brownsville,Tx ML19274D3491979-01-17017 January 1979 Responds to 781129 Ltr Requesting Addl Info Re Site Selection Methodology.Will File Requested Info by 790315; Date Will Permit Completion of NRC Review by July ML19270E8301978-12-0404 December 1978 Requests Documents of Insp of Facility Const,Including Correspondence on Alleged Records Falsification ML20148U4381978-11-29029 November 1978 NRC Needs More Definitive Info to Support Util'S Alternative Site Analysis & a Demonstration That Site Selection Methodology Remains Valid in View of Plant Deferral ML20235D6781977-06-21021 June 1977 Discusses Util 770609 Request That 770705 Site Suitability Hearings Remain in Effect Regardless of Deferment of Plant. ASLB Requested to Postpone Site Suitability Hearings & Solicit Views of All Parties on Listed Items ML20235D6041977-06-0909 June 1977 Forwards News Release Issued Today by Util Announcing Indefinite Deferral of Unit 1,reflecting Further Revs to Load Forcasts.Site Will Be Retained for Eventual Const of Nuclear Power Plant.Related Correspondence ML20235C9141975-06-0606 June 1975 Responds to Requesting Schedule for Providing Detailed Info on Mark III Containment Sys for Plant.Plans to Submit Info During First Half of 1978.Engineering Largely Suspended Due to Deferment of Commercial Operation Dates ML20235C8341975-05-23023 May 1975 Advises of Current Status of Project & Summarizes Actions Planned for Accomplishment During Suspension Period, Irrespective of Outcome of ASLAP Proceedings.Plan Directed Toward Reactivation of Project During Fourth Quarter 1976 ML20235C7641975-03-12012 March 1975 Advises That Util Has No Current Plans to Submit New Applications Between Now & Beginning of FY78,per NRC 750307 Request Re Application Submittals ML20235C5181974-09-27027 September 1974 Ack Receipt of AEC Re Revised Safety Review Schedule for Plant.Believes Schedule Realistic.Stresses Importance That Licensing Processes Associated W/Application Proceed as Expeditiously as Possible ML20235C4661974-09-25025 September 1974 Advises of Change in Established Schedule for Environ Review of Application for CPs for Proposed Plant.Issuance of Fes Now Targeted for 741122.Environ Hearings Estimated to Commence on 750121 1987-09-22
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARST-HL-AE-2394, Summarizes 871022 Telcon W/Gl Constable Requesting Extension to 871112 to Respond to Notice of Violation 50-499/87-48-01. Request Made to Facilitate Addl Executive Mgt Review of Work Being Performed as Result of Violation.Date Acceptab1987-10-23023 October 1987 Summarizes 871022 Telcon W/Gl Constable Requesting Extension to 871112 to Respond to Notice of Violation 50-499/87-48-01. Request Made to Facilitate Addl Executive Mgt Review of Work Being Performed as Result of Violation.Date Acceptable ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20039F8541982-01-0606 January 1982 Respectfully Declines to Pay 811214 Assessed Review Charges Pending Outcome of Litigation Re Validity for Fees.Several Utils Have Opposed NRC Proposed Collection Actions ML19347D3491981-03-12012 March 1981 Responds to NRC 810223 Request for Addl Info Re Util Plans for Facilities.Completion of Cherokee 1 & 2 Has Been Indefinitely Delayed.Commercial Operating Dates for Cherokee 3 & Perkins 1,2 & 3 Have Not Been Determined ML19318A9191980-06-17017 June 1980 Forwards PSC of MD Order 64338,closing Case 6603,PEPCO Application for Certificate of Public Convenience & Necessity for Const of Two Nuclear Power Plants,Due to Util 800602 Withdrawal of Application ML19309H8791980-05-0808 May 1980 Withdraws Application for Early Site Review for Facility. Load Growth Forecasts Continue to Indicate Little Possibility That Util Will Commence Const within Validity Period of Early Site Review Findings ML19305D8961980-03-21021 March 1980 Responds to NRC & Central & South West Corp Comments Re Consolidation.Severance Arguments Based on Belief That Util Will Rely on Study by Stagg Sys,Inc as Part of Defense.Util Will Not Rely on Stagg Study.Certificate of Svc Encl ML20136C4951979-09-20020 September 1979 Forwards Info from State of MD Re site-specific Data on Selected Potential Util Development Sites in Southern MD ML20136C3111979-09-14014 September 1979 Forwards Addendum to Site Selection Study for Two 1,100 MW Nuclear Power Plants, in Response to NRC 790824 Request for Addl Info ML19207C1761979-09-0404 September 1979 Confirms That Info Requested in NRC 790824 Ltr Will Be Submitted by 790915 ML19246A7301979-06-25025 June 1979 Forwards Questions Re Ecological Monitoring Site.Requests Response by 790716 ML19246A8421979-05-0101 May 1979 Notifies That Depositions Have Been Taken from Rl Steder of Ppg Industries & Ev Sherry of Air Products & Chemicals. Central Power & Light Has Furnished NRC-requested Documents to City of Brownsville,Tx ML19274D3491979-01-17017 January 1979 Responds to 781129 Ltr Requesting Addl Info Re Site Selection Methodology.Will File Requested Info by 790315; Date Will Permit Completion of NRC Review by July ML19270E8301978-12-0404 December 1978 Requests Documents of Insp of Facility Const,Including Correspondence on Alleged Records Falsification ML20235D6041977-06-0909 June 1977 Forwards News Release Issued Today by Util Announcing Indefinite Deferral of Unit 1,reflecting Further Revs to Load Forcasts.Site Will Be Retained for Eventual Const of Nuclear Power Plant.Related Correspondence ML20235C9141975-06-0606 June 1975 Responds to Requesting Schedule for Providing Detailed Info on Mark III Containment Sys for Plant.Plans to Submit Info During First Half of 1978.Engineering Largely Suspended Due to Deferment of Commercial Operation Dates ML20235C8341975-05-23023 May 1975 Advises of Current Status of Project & Summarizes Actions Planned for Accomplishment During Suspension Period, Irrespective of Outcome of ASLAP Proceedings.Plan Directed Toward Reactivation of Project During Fourth Quarter 1976 ML20235C7641975-03-12012 March 1975 Advises That Util Has No Current Plans to Submit New Applications Between Now & Beginning of FY78,per NRC 750307 Request Re Application Submittals ML20235C5181974-09-27027 September 1974 Ack Receipt of AEC Re Revised Safety Review Schedule for Plant.Believes Schedule Realistic.Stresses Importance That Licensing Processes Associated W/Application Proceed as Expeditiously as Possible 1987-08-25
[Table view] Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
MONTHYEARML19270E8301978-12-0404 December 1978 Requests Documents of Insp of Facility Const,Including Correspondence on Alleged Records Falsification 1978-12-04
[Table view] |
Text
. .
g (713) 749-3130 Texas Public interest Research Group Box 237 U.C. - University of Houston - H ouston, Tx. 77004 12/04/78 Re f: South Texas Project, Freedom of Information Request Executive Legal Director FREEDOM OF INFORMATION U.S. Nuclear Regulatory Commiscion ACT REQUESI Washington, D.C. 20555 gg.g_
Dear Sir,
AJCic/ /)- $ -78 The South Texas Project (Houston Lighting and Power Company, et. al.)
is a nuclear generating station presently under construction in Bay City, TX. According to quarterly summaries of construc tion-related ac tivities published by the N.R.C., that project has been subject to several surprise inspections by the staff in the last eight months.
TexPIRG makes the following request under 5 U.S.C. s 552.
With regard to regulatory inspections of that facility, please mail to us the following: (1) statements of fact and observation and summary memoranda submitted by inspectors in conjunction with the July to Sept-ember, 1978 inspections; (2) correspondence between the N.R.C. 3taff and Applicant Manager Houston Lighting and Power Company regarding the need for and results of the JulyWSeptember, 1978 inspections; (3) enforce-ment documents and any correspondence between the N.R.C. staff and Applicant Manager Houston Lighting and Power Company related to the false documentation of quality assurance at the S.T.P. site, as alleged in inspections of the Spring and Summer time period of 1978.
I realize that the photocopying costs for the above may be appreciable.
If such costs are $20 or less, please bill me at the time of mailing such documents. If those costs are higher, I would appreciate a call from the staff so that I might clarify the request.
I appreciate your time and effort in responding to this request.
The mailing address is listed below.
Singerely, '
(/
%4 Clarence Johnson, Director TexPIRG Box 237 U.C.
University of Houston Houston, TX 77004 79010200c6