Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18171A290 + (RAI: Green River, Utah, Disposal Site Groundwater Compliance Action Plan Requests for Additional Information: Enclosure)
- ML023120447 + (RAI: Hatch Relief Request RR-34, Revision 1, and RR-37)
- ML102170303 + (RAI: Point Beach Nuclear Plant, Units 1 and 2 License Amendment Request (LAR-264) Dated January 27, 2010 Diesel Fuel Oil Storage Requirements)
- ML051330301 + (RAIs)
- ML24344A084 + (RAIs - TSTF-500 LAR)
- ML19114A435 + (RAIs 4-4-19 r3)
- ML13330A585 + (RAIs Associated with Review of Salem, Unit 2, 2R19 Steam Generator Tube Inspections)
- ML18345A203 + (RAIs Environmental Review and Environmental Impact Statement for Holtec CISF)
- ML13154A470 + (RAIs Following Ifib Analysis 2013 Decommissioning Funding Status Report for Prairie Island 1 and 2 and Monticello)
- ML13154A483 + (RAIs Following Ifib Analysis of APs 2013 Decommissioning Funding Status Report for Palo Verde Units 1, 2 and 3)
- ML13154A431 + (RAIs Following Ifib Analysis of Edisons 2013 Decommissioning Funding Status Report for San Onofre Units 2 and 3)
- ML13154A439 + (RAIs Following Ifib Analysis of FENOCs 2013 Decommissioning Funding Status Report for Beaver Valley 1 and 2)
- ML13154A444 + (RAIs Following Ifib Analysis of FENOCs 2013 Decommissioning Funding Status Report for Davis-Besse and Perry)
- ML13154A511 + (RAIs Following Ifib Analysis of NextEra Energys 2013 Decommissioning Funding Status Reports for Duane Arnold Energy Center and Point Beach Units 1 and 2)
- ML13154A505 + (RAIs Following Ifib Analysis of NextEra Energys 2013 Decommissioning Funding Status Reports for Seabrook)
- ML13154A495 + (RAIs Following Ifib Analysis of PSEGs 2013 Decommissioning Funding Status Report for Hope Creek Generating Station)
- ML20245E175 + (RAIs Letter 08/31/2020)
- ML20245E177 + (RAIs Public 08/31/2020)
- ML19260G207 + (RAIs Regarding Anl Request for NRC Review of the Quality Assurance Plan Program for the Sfr Metallic Fuel Data Qualification)
- ML112312318 + (RAIs Regarding Temporary Non-Code Compliant Condition)
- ML102320276 + (RAIs Regarding to Request for Enforcement Discretion for Fire Protection)
- ML19108A428 + (RAIs SLRA Set 1_ERO(Rev 1))
- ML21161A119 + (RAIs Set 1 Final Aging Management of Irradiated Concrete and Steel Reactor Vessel Supports Final)
- ML24309A216 + (RAIs TSTF-601, Extend Shield Building Completion Time After Refueling)
- ML25241A166 + (RAIs TSTF-604, Rev. 0, Revise Ventilation System Actions)
- ML23045A205 + (RAIs WEC Ash Part 1)
- ML20028D892 + (RAIs and Responses, Safety Analysis Report (Sar), Chapter 15, Materials Evaluation)
- ML080980500 + (RAIs for Braidwood Interim SG Tube ARC LAR)
- ML19128A278 + (RAIs for Braidwood Tvel LTA Application)
- ML19128A277 + (RAIs for Braidwood Tvel LTA Application)
- ML21235A022 + (RAIs for Centrus Energy Corp./American Centrifuge Operating License Amendment Application for Using Digital IROFS - Cover Letter)
- ML083560006 + (RAIs for Crystal River 3 LAR 301 - Application to Modify IST for Replacement Steam Generators (MD9547))
- ML21063A320 + (RAIs for Dresden, Units 2 and 3, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (EPID L-2020-LLA-0239) (E-mail))
- ML14238A517 + (RAIs for EPRI Reports 1022909 and 1025203 Referenced in NEI 12-16 Rev 2)
- ML22147A122 + (RAIs for GNF-A Safety Analytic Methods)
- ML13190A215 + (RAIs for Hope Creek Regarding Response to Order EA-12-051 (SFP Instrumentation))
- ML13190A221 + (RAIs for Hope Creek Regarding Response to Order EA-12-051)
- ML072330440 + (RAIs for ISI Summary Report Steam Generator- MD3158)
- ML20092G344 + (RAIs for LAR to Revise Technical Specifications 6.8.4.o, Reactor Coolant Pump Flywheel Inspection Program)
- ML23173A063 + (RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support)
- ML22292A240 + (RAIs for Master Dtf Agreement on IP1 IP2 10 18 2022)
- ML14276A013 + (RAIs for NEI 12-16)
- ML093521424 + (RAIs for Peach Bottom U2 Type a Test Extension LAR)
- ML22026A102 + (RAIs for RR 20 - Alternate Examination of Canopy Seal Weld Control Element Drive Mechanism Number 27 Housing)
- ML110550698 + (RAIs for Requested Exemption Regarding Part 26)
- ML25017A282 + (RAIs for Review: Waterford 3 - Review of Steam Generator Tube Inspection Report for the 25th Rf)
- ML13192A228 + (RAIs for Salem Regarding Response to Order EA-12-051 (SFP Instrumentation))
- ML13179A303 + (RAIs for Salem Regarding Response to Order EA-12-051 (SFP Instrumentation))
- ML13179A293 + (RAIs for Salem Regarding Response to Order EA-12-051 (SFP Instrumentation))
- ML122630012 + (RAIs for Salem U1 Relief Request S1-I3R-114 TAC No. ME8565)
- ML080780564 + (RAIs for Vogtle Interim SG Tube ARC LAR)