Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Provides Estimated FY92 10CFR170 Fee Collections". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20125E263  + (Provides Estimated FY92 10CFR170 Fee Collections)
  • CY-98-018, Provides Estimated Final Dose of Record for Two Workers Involved in 961102,airborne Radioactivity Event,Along W/Bases for Determination,Per Insp Rept 50-213/97-10  + (Provides Estimated Final Dose of Record for Two Workers Involved in 961102,airborne Radioactivity Event,Along W/Bases for Determination,Per Insp Rept 50-213/97-10)
  • RBG-44542, Provides Estimated Info Contained in Encl to Ltr Re Voluntary Response to Administrative Ltr 98-03.Current Plans Would Submit Changes in Early 1999 for Implementation During RF-9  + (Provides Estimated Info Contained in Encl to Ltr Re Voluntary Response to Administrative Ltr 98-03.Current Plans Would Submit Changes in Early 1999 for Implementation During RF-9)
  • ML19351F401  + (Provides Estimated Schedule for Completing Masonry Wall re-evaluation Program Required by IE Bulletin 80-11. Completion Dates for Class I & II Walls Are 810315 & 0415, Respectively)
  • ML20249B856  + (Provides Estimates of Licensing Action Requests in Response to Administrative Ltr 98-03)
  • ML18152B397  + (Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02)
  • ML20236J840  + (Provides Estimates of Number of New Licensing Action Requests Util Plans to Submit in Remainder of FY98 & During FY99)
  • ML19345F966  + (Provides Estimates of Schedules for TMI-1 Restart Per 810128 Request.Schedule Is Reasonable for Scope of Work to Be Completed Prior to Restart.Forwards TMI-1 Restart Plan & Assumptions Used in Scheduling & Planning)
  • ML19317F196  + (Provides Estimates of man-sem Doses Expected from Fuel Pool Mods)
  • ML20210B005  + (Provides Estimation of Main Steam Electromatic Relief Valve Operations at Operating Conditions for Listed Facilities,Per 730718 Request.Histories of Relief Valve Operation at Pressure & Temp & Related Info Encl)
  • ML20210U940  + (Provides Evaluation & Discussion of Proposed Change to Operational QAP for Review & Aproval,Iaw Requirements of 10CFR50.54(a)(3))
  • ML20010H143  + (Provides Evaluation & Opinion Re IE Insps 50-269/69-01, 50-270/69-01 & 50-287/69-01.Util QC Welding Inspectors Should Be Commended for Detection of SP-25 Crack)
  • ML20044F617  + (Provides Evaluation Re Licensee Requesting Relief from Certain ASME Code Requirements for Snubber Functional Testing)
  • ML18081A517  + (Provides Evaluation Results & Schedule for Implementation of Required Changes Re NRC Requirements for Auxiliary Feedwater Sys,As Discussed in NRC)
  • ML17325A381  + (Provides Evaluation Supporting Util 870731 Application to Amend Tech Specs Re Containment high-range Area Radiation Monitors.Proposed Monitor Locations Meet Requirements of NUREG-0737 & Generic Ltr 83-37.Sketches Encl)
  • HL-5583, Provides Evaluation of 3rd 10-year Interval ISI Program & Associated Requests for Plant,Units 1 & 2  + (Provides Evaluation of 3rd 10-year Interval ISI Program & Associated Requests for Plant,Units 1 & 2)
  • L-91-026, Provides Evaluation of 901203 Fire in Drywell Personnel Airlock Identified in LER 1-90-026.Assessment Covers Fire & Effect on Plant Sys/Components  + (Provides Evaluation of 901203 Fire in Drywell Personnel Airlock Identified in LER 1-90-026.Assessment Covers Fire & Effect on Plant Sys/Components)
  • ML20056E374  + (Provides Evaluation of 930727 Response to NRC Re Violations Noted in Insp Rept 50-293/93-10 & Presents Significant Issues Discussed During 930804 Meeting Re HP Issues Presented in Subj Insp Rept)
  • ML20151H476  + (Provides Evaluation of B&W Document 47-1159091-00, Design Requirements for Diverse Scram Sys & ATWS Mitigating Sys Actuation Circuitry. Most Sections of Rept Acceptable as Guidelines for plant-specific Design Submittals)
  • ML20154N796  + (Provides Evaluation of B&W Document 47-1159091-00, Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry)
  • ML20154B985  + (Provides Evaluation of B&W Document 47-1159091-00, Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry. List Items Are Areas of Concern That plant-specific Submittals Must Address)
  • ML17263A432  + (Provides Evaluation of Design Deficiency Discovered in AMSAC Sys.Power Level Time Delay lock-in Feature Not Incorporated Onto Design of Sys.Correspondence Prepared Using GL 91-18 as Guide,Although Condition Not within Scope of GL)
  • ML20062M499  + (Provides Evaluation of Drywell to Wetwell Vacuum Breaker Valves,In Response to NRC .Matl Ordering & Mfg Schedules Expedited to Allow Mods to Vacuum Breakers Prior to Fuel Load)
  • ML20198N858  + (Provides Evaluation of Effectiveness of Criteria for Funding Agreement State Training During FY98 & Rept on Actions Taken in Response of SRM SECY-97-183,)
  • ML20247R387  + (Provides Evaluation of Effects of Neutron Radiation on Reactor Vessel Matls (Rvm) Using Methods in Rev 2 to Reg Guide 1.99,per Generic Ltr 88-11, NRC Position on Radiation Embrittlement of Rvms & Impact on Plant Operations)
  • ML17334B216  + (Provides Evaluation of Environ Qualification of Limitorque Actuators Installed in Plant as Part of NRC Environ Qualification Insp.Limitorque Test Rept 600198 Re Qualification of Valve Actuators Encl)