Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LD-89-032, Provides Environ Info Supporting Startup Testing & Production Operations of Revitalized Facility,Including Encl Supplemental Environ Impact Info Re Revitalization of Nuclear Fuel Mfg Facility + (Provides Environ Info Supporting Startup Testing & Production Operations of Revitalized Facility,Including Encl Supplemental Environ Impact Info Re Revitalization of Nuclear Fuel Mfg Facility)
- ML18092A366 + (Provides Environ Qualification Justifications for Continued Operations Assuming Loss of Neutron Flux Monitors & Component Cooling Water Temp to ESF Sys,Per 841025 Commitment)
- ML19343D055 + (Provides Environ Review Supporting Proposed Amend to License SNM-1107 Re Upgrade of Dry Conversion Line)
- ML20136F009 + (Provides Environ Review of Applicant Request to Withdraw OL Application.No Significant Detrimental Environ Impact on or Offsite Provided Applicant Continues to Implement Restoration Plan as Submitted)
- ML20133D755 + (Provides Environ Survey & Site Assessment Programs (Essap) Comments Re Review of Fsv Nuclear Station Decommissioning Project Final Survey Rept)
- ML17195A186 + (Provides Equipment Environ Qualification Program Status Rept for 2-wk Period Ending 840203)
- ML19271E032 + (Provides Equipment Failure Data for Containment Rad Monitors)
- B14043, Provides Erosion/Corrosion Program Update Info as Committed in + (Provides Erosion/Corrosion Program Update Info as Committed in)
- ML20149L819 + (Provides Errata Related to AP600 Scaling & PIRT Closure Rept,Requested During 961112 Meeting Between NRC & W)
- ML19325B340 + (Provides Errata to 740123 Rept, Permanent Plant Changes to Accommodate Equilibrium Core Scram Reactivity Insertion Characteristics)
- ML20150A616 + (Provides Errata to Util 880115 Response to IE Bulletin 85-003 Re Motor Operated Valve Common Mode Failures During Transients Due to Improper Switch Settings)
- ML20217D246 + (Provides Establishment of Mgt Action Plan for Browns Ferry Unit 3 Startup)
- PY-CEI-NRR-1203, Provides Estimate Duration Schedule Re Installation of post-LOCA Neutron Monitoring Sys.Util Will Evaluate Effect of Resolution on Schedule & Confirm or Revise Installation Date as Needed,When Appeal & Criteria Questions Resolved + (Provides Estimate Duration Schedule Re Installation of post-LOCA Neutron Monitoring Sys.Util Will Evaluate Effect of Resolution on Schedule & Confirm or Revise Installation Date as Needed,When Appeal & Criteria Questions Resolved)
- ML20035E842 + (Provides Estimate of ECCS Design Margins in Response to Unresolved Item 92-03-01 Noted in Safety Insp Rept 50-155/92-03 on 920127-0429 of Engineering & Technical Support Programs)
- ML20127J747 + (Provides Estimate of Effort That Will Be Required from Parameter,Inc to Aid in Evaluation of Acceptability of Proposed Chicago Bridge & Iron Site Assembly of Plant Reactor Pressure Vessel)
- ML20076H530 + (Provides Estimate of Hearing dates.In-core Thermocouples & Steam Erosion Issue Will Be Disposed of by Summary Disposition.Standby Liquid Control Sys Initiation & Hydrogen Control Issues Should Be Resolved by Rulemaking)
- ML20248E654 + (Provides Estimate of Hydraulic Conductivity of Wasatch Formation at Old & New Rifle Processing Sites Using Slug Tests & Skibitzke (Ferris & Knowles) Method of Analysis)
- ML20066E602 + (Provides Estimate of Incremental Occupational Radiation Exposure Incurred by Operation of Low Level Waste Onsite Storage Facility.Estimate Includes Exposure Due to Routine & Special Maint & Normal Operation)
- ML18153B103 + (Provides Estimate of Needs for Operator License Exams,Util Requalification Exam Schedule for FY95-98 & Anticipated Number of Candidates for Generic Fundamentals Exam for FY95)
- NG-99-0989, Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates + (Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates)
- ML19291F700 + (Provides Estimate of Resource Requirements & Perception of Safety Benefits Re Secy 81-648,proposed Final Rule on Documentation of Differences from SRP)
- ML20235G561 + (Provides Estimate of Time & Manpower Necessary for MRS One Step Licensing Review Under 10CFR72,per 850808 Telcon. Total Manpower Estimate for Technical Evaluation Is 9.3 Person Yrs.W/O Stated Encls)
- 3F0886-16, Provides Estimated Cost for Installation of Emergency Communication Sys Components at Site & at Emergency Operations Facility,Per NRC 860513 Request + (Provides Estimated Cost for Installation of Emergency Communication Sys Components at Site & at Emergency Operations Facility,Per NRC 860513 Request)
- BSEP-92-0011, Provides Estimated Cost of Repairs to DG Bldg Masonry Walls + (Provides Estimated Cost of Repairs to DG Bldg Masonry Walls)
- ML17275A535 + (Provides Estimated Dates for OL Application,Const Completion & Fuel Load,In Response to NRC 800711 Request.Single Application Will Be Submitted 36 Months Prior to Fuel Loading Dates)
- ML20125E263 + (Provides Estimated FY92 10CFR170 Fee Collections)
- CY-98-018, Provides Estimated Final Dose of Record for Two Workers Involved in 961102,airborne Radioactivity Event,Along W/Bases for Determination,Per Insp Rept 50-213/97-10 + (Provides Estimated Final Dose of Record for Two Workers Involved in 961102,airborne Radioactivity Event,Along W/Bases for Determination,Per Insp Rept 50-213/97-10)
- RBG-44542, Provides Estimated Info Contained in Encl to Ltr Re Voluntary Response to Administrative Ltr 98-03.Current Plans Would Submit Changes in Early 1999 for Implementation During RF-9 + (Provides Estimated Info Contained in Encl to Ltr Re Voluntary Response to Administrative Ltr 98-03.Current Plans Would Submit Changes in Early 1999 for Implementation During RF-9)
- ML19351F401 + (Provides Estimated Schedule for Completing Masonry Wall re-evaluation Program Required by IE Bulletin 80-11. Completion Dates for Class I & II Walls Are 810315 & 0415, Respectively)
- ML20249B856 + (Provides Estimates of Licensing Action Requests in Response to Administrative Ltr 98-03)
- ML18152B397 + (Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02)
- ML20236J840 + (Provides Estimates of Number of New Licensing Action Requests Util Plans to Submit in Remainder of FY98 & During FY99)
- ML19345F966 + (Provides Estimates of Schedules for TMI-1 Restart Per 810128 Request.Schedule Is Reasonable for Scope of Work to Be Completed Prior to Restart.Forwards TMI-1 Restart Plan & Assumptions Used in Scheduling & Planning)
- ML19317F196 + (Provides Estimates of man-sem Doses Expected from Fuel Pool Mods)
- ML20210B005 + (Provides Estimation of Main Steam Electromatic Relief Valve Operations at Operating Conditions for Listed Facilities,Per 730718 Request.Histories of Relief Valve Operation at Pressure & Temp & Related Info Encl)
- ML20210U940 + (Provides Evaluation & Discussion of Proposed Change to Operational QAP for Review & Aproval,Iaw Requirements of 10CFR50.54(a)(3))
- ML20010H143 + (Provides Evaluation & Opinion Re IE Insps 50-269/69-01, 50-270/69-01 & 50-287/69-01.Util QC Welding Inspectors Should Be Commended for Detection of SP-25 Crack)
- ML20044F617 + (Provides Evaluation Re Licensee Requesting Relief from Certain ASME Code Requirements for Snubber Functional Testing)
- ML18081A517 + (Provides Evaluation Results & Schedule for Implementation of Required Changes Re NRC Requirements for Auxiliary Feedwater Sys,As Discussed in NRC)
- ML17325A381 + (Provides Evaluation Supporting Util 870731 Application to Amend Tech Specs Re Containment high-range Area Radiation Monitors.Proposed Monitor Locations Meet Requirements of NUREG-0737 & Generic Ltr 83-37.Sketches Encl)
- HL-5583, Provides Evaluation of 3rd 10-year Interval ISI Program & Associated Requests for Plant,Units 1 & 2 + (Provides Evaluation of 3rd 10-year Interval ISI Program & Associated Requests for Plant,Units 1 & 2)
- L-91-026, Provides Evaluation of 901203 Fire in Drywell Personnel Airlock Identified in LER 1-90-026.Assessment Covers Fire & Effect on Plant Sys/Components + (Provides Evaluation of 901203 Fire in Drywell Personnel Airlock Identified in LER 1-90-026.Assessment Covers Fire & Effect on Plant Sys/Components)
- ML20056E374 + (Provides Evaluation of 930727 Response to NRC Re Violations Noted in Insp Rept 50-293/93-10 & Presents Significant Issues Discussed During 930804 Meeting Re HP Issues Presented in Subj Insp Rept)
- ML20151H476 + (Provides Evaluation of B&W Document 47-1159091-00, Design Requirements for Diverse Scram Sys & ATWS Mitigating Sys Actuation Circuitry. Most Sections of Rept Acceptable as Guidelines for plant-specific Design Submittals)
- ML20154N796 + (Provides Evaluation of B&W Document 47-1159091-00, Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry)
- ML20154B985 + (Provides Evaluation of B&W Document 47-1159091-00, Design Requirements for Diverse Scram Sys & ATWS Mitigation Sys Actuation Circuitry. List Items Are Areas of Concern That plant-specific Submittals Must Address)
- ML17263A432 + (Provides Evaluation of Design Deficiency Discovered in AMSAC Sys.Power Level Time Delay lock-in Feature Not Incorporated Onto Design of Sys.Correspondence Prepared Using GL 91-18 as Guide,Although Condition Not within Scope of GL)
- ML20062M499 + (Provides Evaluation of Drywell to Wetwell Vacuum Breaker Valves,In Response to NRC .Matl Ordering & Mfg Schedules Expedited to Allow Mods to Vacuum Breakers Prior to Fuel Load)
- ML20198N858 + (Provides Evaluation of Effectiveness of Criteria for Funding Agreement State Training During FY98 & Rept on Actions Taken in Response of SRM SECY-97-183,)
- ML20247R387 + (Provides Evaluation of Effects of Neutron Radiation on Reactor Vessel Matls (Rvm) Using Methods in Rev 2 to Reg Guide 1.99,per Generic Ltr 88-11, NRC Position on Radiation Embrittlement of Rvms & Impact on Plant Operations)
- ML17334B216 + (Provides Evaluation of Environ Qualification of Limitorque Actuators Installed in Plant as Part of NRC Environ Qualification Insp.Limitorque Test Rept 600198 Re Qualification of Valve Actuators Encl)