ML20149L819

From kanterella
Jump to navigation Jump to search
Provides Errata Related to AP600 Scaling & PIRT Closure Rept,Requested During 961112 Meeting Between NRC & W
ML20149L819
Person / Time
Site: 05200003
Issue date: 11/14/1996
From: Huffman W
NRC (Affiliation Not Assigned)
To: Liparulo N
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 9611180260
Download: ML20149L819 (3)


Text

_

__.._m._

w November 14, 1996 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Analysis Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230-

SUBJECT:

ERRATA IN AP600 SCALING AND PIRT CLOSURE REPORT, WCAP-14727 f

Dear Mr. Liparulo:

In a meeting between the Nuclear Regulatory Commission staff and Westinghouse on November 12, 1996, Westinghouse requested feedback as soon as possible on any editorial, typographical, or other errata that may be noted in the review of the AP600 scaling and PIRT Closure Report.

Per this request, the staff has provided errata that it has found in the review to date. This information is included in Enclosure 1 to this letter.

If you have any questions regarding this matter, you may contact me at (301) 415-1141.

Sincerely, I

original signed by:

William C. Huffman, Project Manager Standardization Project Directorate i

Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No.52-003

Enclosure:

As stated 1

cc w/ enclosure:

See next page i

DISTRIBUTION:

!DocketLFile' PDST R/F TMartin PUBLIC DMatthews TQuay TKenyon BHuffman JSebrosky

)

DJackson JMoore, 0-15 B18 WDean, 0-17 G21 ACRS (11)

FEltawila, T-10 G6 Alevin, 0-8 E23 TCollins, 0-8 E23 GHolahan, 0-8 E2 k

9611180260 961114 PDR ADOCK 05200003

\\

A PDR DOCUMENT NAME: A: ERRATA.PRT n

.e m.

we m m. m.: c cm.nhoui.ii.ce ii.aci.

r - c.,,

iih.ii. chm.nt/.ncio.ur.

"N* = No copy 0FFICE PM:PDST:DRPM SC:SRXB_:DS$A D:PDST:DRPM l l

NAME WCHuffman e AlevisfrJf7%

TRQuay 1 EQ DATE 11/M/96 ly/t/199 -)

11/#4/96 0FFICIAL RECORD COPY

-o l

Mr. Nicholas J. Liparulo Docket No.52-003 Westinghouse Electric Corporation AP600 1

cc: Mr. B. A. McIntyre Mr. Ronald Simard, Director Advanced Plant Safety & Licensing Advanced Reactor Programs Westinghouse Electric Corporation Nuclear Energy Institute Energy Systems Business Unit 1776 Eye Street, N.W.

P.O. Box 355 Suite 300 Pittsburgh, PA 15230 Washington, DC 20006-3706 Mr. John C. Butler.

Ms. Lynn Connor Advanced Plant Safety & Licensing Doc-Search Associates Westinghouse Electric Corporation Post Office Box 34 Energy Systems Business Unit Cabin John, MD 20818 I

Box 355 Pittsburgh, PA 15230 Mr. James E. Quinn, Projects Manager LMR and SBWR Programs Mr. M. D. Beaumont GE Nuclear Energy I

Nuclear and Advanced Technology Division 175 Curtner Avenue, M/C 165 Westinghouse Electric Corporation San Jose, CA 95125 One Montrose Metro 11921 Rockville Pike Mr. Robert H. Buchholz Suite 350 GE Nuclear Energy Rockville, MD 20852 175 Curtner Avenue, MC-781

)

San Jose, CA 95125 Mr. Sterling Franks 1

U.S. Department of Energy Barton Z. Cowan, Esq.

NE-50 Eckert Seamans Cherin & Mellott 19901 Germantown Road 600 Grant Street 42nd Floor Germantown, MD 20874 Pittsburgh, PA 15219 Mr. S. M. Modro Mr. Ed Rodwell, Manager Nuclear Systems Analysis Technologies PWR Design Certification Lockheed Idaho Technologies Company Electric Power Research Institute Post Office Box 1625 3412 Hillview Avenue Idaho Falls, ID 83415 Palo Alto, CA 94303 Mr. Frank A. Ross Mr. Charles Thompson, Nuclear Engineer U.S. Department of Energy, NE-42.

AP600 Certification Offica of LWR Safety and Technology NE-50 19901 Germantown Road 19901 Germantown Road Germantown, MD 20874 Germantown, MD 20874

,w ERRATA AP600 SCALING AND PIRT CLOSURE REPORT, WCAP-14727 1.

Two acronym errors were noted: ANS is American National Standard (pg 10-40) and LOFT is Loss of Fluid Test.

2.

Figure 2.2-4 shows the pressurizer-to-CMT balance line. This is no longer part of the AP600 design.

3.

Page 2-32: The last paragraph uses "RCS trips."

It should be "RCPs trip."

4.

Page 2-34:

Containment pressure of 24.7 psia appears to be a typo. This probably should be 14.7 psia.

5.

Table 2.4-1:

Canned " water" should be " motor."

6.

Page 4-2 (second paragraph): Discussion on the hot fluid being below the cool fluid should be the other way around.

7.

Page 8-37 (last full paragraph):

"The magnitude of the spike was smaller than one-half of the peak flowrate in Figure 8.4-22."

The subject figure shows the spike to actually be more than 250 times greater.

i 8.

Figure 10.2-1: The last word in the caption should not be " containment."

9.

Page 10-20 (first bullet): The next to last word should be " injection",

not " inspection."

10.

Page 10-21 (last sentence of first paragraph):

" Argument" should be

" agreement." In addition, the last paragraph on this page seems out of pl ace.

Enclosure