MEMORANDUM FOR:

THRU:

FROM:

SUBJECT:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555-FEB - 7 1984 Frank J.. Miraglia, Assistant Director.

fo.r Safety* Assessment,. DL Johrt ZwoTinski, Section Leader ~

Operating Reactors Assessment~¥* DL Gary Halahan,. Chief Jl~O.

Operating Reactors Assessment Branch, DL Rudy Karsch.- Lead Project Manager for Equipment Qualification,. MPA B-60 Operatfog Reactors Assessment Branch, DL EQUIPMENT QUALIFICATION PROGRAM STATUS.REPORT, TWO: WEEK.PERIOD WEEK ENDING FEBRUARY 3,. 1984 Equipment <ruaTf.ficatton* Revtew Meetings: for Zfon 1/2,. Quad Cities 1/2,.. and Dresderr 2/3 were. compTete<f* ort January 2!i and' 26.. Oconee 1/2/3 was completed on January 31 and Brunswick 1/2 was completed on February 2, 1984. In addition ta the resolution* of* the specific equipment problems identified by the-Frankl in Research: Center TER and. compliance to' 10 CFR 50.49 (the EQ Rule*}, the

. Hcensees surveiTTance inspect.ton program and preventative maintenance program for qualified equipment was reviewed. Theo results of the four meetings are presented below.

Zion 1/2 All open items for Zion 1/2 were resolved with two exceptions. The hydraulic actuator for the MSIVs is a Zion-uniqu.e design and is presently undergoing qualification testing. If testing is not successfully completed prior to March 31, 1985,. an extension request will be submitted. The second item is the motor operator for th~ safety injection valves now undergoing testing.

If unsuccessful, Conmonwealth Edison will request an extension for them also.

One JCO requ.ired approval and was resolved* via' staff review this week.

Quad Cities 1/2 - Dresden 2/3 All remaining open items for Dresden and Quad Cities were resolved, however, these plants remain incomplete as the post accident environmental envelope inside containment (pressure and temperature) has not been approved by Containment Systems Branch (CSB).

No exceptions exist for.either Dresden or Quad Cities.

On review we have detennined that about a dozen other plants are also in this situation. Action has been initiated to enlist a more timely review by CSB.

B4b5b *.

PDR.Afi039~ 840207:;,, >.. ; :*-

P~

OCK -0500023.7., *> -.. *,j**

PDR

.. -*. *- ~----- ------=-~~-=-;-~--'--~. '

21.2/84 Enclosure l Equipment Environmental Qualification Review Meetings With the Licensees Schedule Status Plant Cook l and 2.

Three Mile !&land l Meeting Scheduled Completed Completed Point Beach land Z Completed Prairie Island land 2 Completed Peach Bottom 2 and 3 Comp 1 eted '

Oyster Creek Completed

  • Monti ce 11 o Davis-Besse l Crysta 1 River 3 San Onofre l Palisades Farley l and 2 Yankee Rowe Robinson Kewaunee Zion 1 and 2 Quad Cities l and 2 Dresden 2 and 3 Oconee 1, 2, 3 Brunswick 1 and 2 Duane Arnold St. Lucie I Turkey Pt. 3 and 4 Hatch 1 and 2 Comple.ted Completed Completed Completed.

Completed Completed.

Completed Completed Completed Completed Completed Completed Completed Completed 2/7/84 2/8/84 2/9/84 2/14/84 Expected Submittal Received Received

~i<tlVt~

1/5/84 1/9/84 1/28/84 1/13/84 1/31/84.

1/31/84 Z/13/84 2/28/84 3/1/84 3/2/84 3/1/84 2/29/84 2/29/84 2/29/84 3/9/84 3/~84 3/7/84 3/8/84 3/9/84 3/14/84 Project Manager D. Wigginton J. Van Vliet T. Colburn D. Diianni G. Gears J. Lombardo H. Nicolaras A. DeAgazio R. Hernan W. Paulson T. Wambach E. Reeves P. Erickson G. Requa D. Neighbors J. Norris R. Bevan R. Gilbert J. Suermann S. Mackay M. Thadarii

0. Se 11 s
0. McDonald G. Rivenbark Contacts:

P. Shemanski, EQB, 492-8289; R.. Karsch, ORAB, 492-8563

  • ~

e

~' \\ I

\\.

2/1/84 Equipment Env*i ronmental Qualification Review Meetings (Continued)

Meeting Expected Project Plant Scheduled Submittal

. Manager Lacrosse 2/16/84 3/16/84 R. Dudley Ft. St. Vrain Z/2.9/84 P.

W~gner Rancho* Seco 3/7/84 4/7/84

s. Miner Big Rock Point 3/1:4/84 4/16/84 R. Emch Nine Mile Point l 3/15/84 4/16/84 R. Hermann Calvert Cliffs l and 2 3/16/84 4/17/84 D. Jaffe Surry 1 and 2 3/19/84 4/19/84 D. Neighbors North Anna l and 2 3/20/84 4/20/84 L. Engle Fort Calhoun 3/23/84 4/23/84 E. Tourigny Trojan 3/27/84 4/27/84
c. Trammell Cooper 3/29/84' 4/29/84 B. Siegel Fitzpatrick 3/30/84 4/30/84 H. Abel son*

Beaver Va 11 ey l 4/5/84 5/7/84*

P. Tam Haddam Neck 4/10/84 5/10/84 J. Lyons Mi 11 stone l 4/11/84 5/11/84 J. Shea Mi 11 stone 2.

4/11/84 5/11/84 K. Heitner Arkansas 2 4/12/84 5/12/84 B. Lee Ginna 4/17/84 5/17/84 G. Dick Vermont Yankee 4/18/84 5/18/84

v. Rooney Indian Point 2 4/19/84 5/19/84 R. Pederson Arkansas 1 4/26/84 5/26/84 G. Vissing Pilgrim 5/22/84 6/22/84 P. Leech

LIST OF ATTENDEES EQ MEETING - DRESDEN/QUAD CITIES JANUARY 26, 1984 ENCLOSURE 2 NRC R. A. Gilbert R. Karsch Sargent & Lundy M. Rauckhorst P. Shemanski T. Lee R. Bevan N. Chrissotimos T. Cappucci WESTEC C. J. Crane Commonwealth Edison B. Rybak B. Viehl D. Lamken G.. Frankovich J. M. Almer INEL M. Yost Bechtel M. Nevhavser J. Wahl

LIST OF ATTENDEES ZION EQUIPMENT QUALIFICATION MEETING JANUARY*25, 1984 NRC D. Wigginton T. Le P. Shemanski R. Karsch R. A. Gilbert Conmonwealth Edison D. Lamken S *. Zunjic N.. P. Smith G *. W. Frankovich B *. Viehl J. M. Ahmer

8. Rybak
  • F. Lentine-Bechtel J *. R. Wahl M. H. Neuhauser Public Service Electric & Gas J *. M. Quather R. Patwell Westec C. J. Crane Sargent & Lundy M. Rauckhorst C. Schwarz INEL M. Yost

NAME

-- John F. Suennann Rudy Cl. Ka rs ch Paul Shemanski Max Yost James McGriff Ira Heatherly Kenneth P. Parr Albert B. Ruff Robert Fill T. P *. HarraTT R... J. Smith J *. E *. Cooper Irr G. C. Rogers W. F. Smittr R.

E~ Patterson Paul Guill OCONEE 1/2/3 MEETING WITH DUKE POWER COMPANY ON ENVIRONMENTAL QUALIFICATION OF EQUIPMENT JANUARY 31, 1984 AFFILIATION' NRC/Dl Project Manager NRC/DL/ORAB E.Q *. Lead PM NRC/DE/EQB INEL TVA (Observer)

TVA (Observer)

TVA (Observer)

Regfon II, Reactor Inspector Duke Power Duke Power Co.

Duke Power Co.

Duke Power Co *.

Duke Power Co..

Duke Power Co.

Duke Power Co.

Duke Power Co.

M. Grotenhuis J. S. Dietrich

. J *. *ftt. Waldorf*

, B.* R. Messitt P.: P.. Carier Torrmy Le-

. Max W *. Yost Paul Shemanski Rudy 0 *. Ka rs ch Doug Dtsmuks Larry Rowe-John Wheless Chris-Shiver Marty C.. Swartz Dave Jenner Sherwood Zirnnennan BRUNSWICK 1/2 FEBRUARY 2, 1984 ATTENDANCE NRC CP&L Licensing CP&L Brunswick CP&L Brunswick CP&L Licensing NRC/IE'/QASIP INEL NRC/DE'/EQB NRC/DL/ORAB Bechtel Power/Hatch Bechtel Power/Hatch SCS (Southern Company Services)

GA Power Co./Hatch Bechtel Power/Hatch Bechtel Power/Hatch Carolina P&L

~"

.\\

' FEB

  • 7 19a4 Oconee 1/2/3 All open items for Oconee 1/2/3 were resolved.

An extension of the deadline may be required to allow changeout of a sample line valve on Unit 2 if their scheduled refueling outage runs late. This will not be known for a few months.

Brunswick 1/2 All open items for Brunswick 1/2 were resolved. Baring any unforeseen purchasing delays Unit 1 will be in compliance before the deadline. Unit 2 currently has a problem in meeting the desired. schedule. The extent of their schedular problem has not been detennined at this time, due to a heavy work-load and the long duration of an upcoming outage' (30 week* outage).

Implementation of E.Q.

related fixes won't be completed until after November 1985. A request for a time extension is expected.. No new JCOs were necessary.

A list of attendees is enclosed; note that ACRS was represented* at the Dresden/

Quad Cities meeting. A status report and schedule of upcoming meetings is also enclosed. The expected submittal dates for the completed meetings represent negotiated dates.

TVA attended our EQ meeting on January 31, 1984, and should select dates shortly.

Salem 1/2 and Indian Point 2 need to corrmit to a meeting date. Project managers for these plants should encourage their licensees to corrmit to a meeting date to expedite completion of the EQ effort.. Please notify the undersigned on

  • x28563 concerning these. matters.

Enclosures:

Rudy 0. Karsch, tead Project Manager for Equipment Qualification, MPA B-60 Operating Reactors Assessment Branch Division of Licensing

1. Schedule of Upcoming Meetings
2. Meeting Attendees cc:

D. Eisenhut/R. Purple R. Mattson R. Vollmer G *.Lainas T. Novak W. Butler V. Noonan DL Branch Chiefs J. Kudrick DL Project Managers T. Le; IE

~

ORAB:D;z:

RKarsch:dm JZwolinski 02/~ /84 02/'~/84 c~toL GHrllahan 02/~ /84.

DISTRIBUTION Central File.

GHolahan JZwolinski RKarsth