Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Proposed Tech Spec Table 3.3.2-1 Re Isolation Actuation Instrumentation". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20041A122  + (Proposed Tech Spec Table 3.3-10 Re Fire Detection Instruments)
  • ML17329A335  + (Proposed Tech Spec Table 3.3-10, Post-Accident Monitoring Instrumentation)
  • ML20134M717  + (Proposed Tech Spec Table 3.3-11 Re Fire Detection Instruments,Clarifying Instrument Locations Consistent W/Updated FSAR)
  • ML20073C514  + (Proposed Tech Spec Table 3.3-11 Re Total Number of Operable Channels in Reactor Vessel Level Indication Sys)
  • ML20137P429  + (Proposed Tech Spec Table 3.3-13, Radioactive Gaseous Effluent Monitoring Instrumentation)
  • ML20070U810  + (Proposed Tech Spec Table 3.3-2 Re ESFAS Instrumentation)
  • ML20054J875  + (Proposed Tech Spec Table 3.3-2 Re Reactor Protection Sys Instrumentation Response Times)
  • ML20148J299  + (Proposed Tech Spec Table 3.3-2, ESF Instrumentation & Table 4.3-2, ESF Instrumentation Surveillance Requirements, Reflecting Deleted Modes 5(1) & 5*, Respectively)
  • ML17325B185  + (Proposed Tech Spec Table 3.3-2, Reactor Trip Sys Instrumentation Response Times)
  • ML20100A812  + (Proposed Tech Spec Table 3.3-3, ESF-Actuation Sys Instrumentation, Indicating That Only One Channel of Containment radioactivity-high Isolation Signal Required to Be Operable in Modes 1-4 When Purge Supply in Use)
  • ML20153F011  + (Proposed Tech Spec Table 3.3-3, ESFAS Instrumentation)
  • ML20096B293  + (Proposed Tech Spec Table 3.3-3,Item 6.C,allowing Change from Mode 4 to Mode 3 When Level Transmitter Inoperable)
  • ML20082L824  + (Proposed Tech Spec Table 3.3-4 Re Station Blackout,Loss of Voltage,Degraded Voltage,Trip Setpoints & Allowable Values)
  • ML20086Q533  + (Proposed Tech Spec Table 3.3-4, ESFAS Instrumentation Trip Setpoints)
  • ML18092B044  + (Proposed Tech Spec Table 3.3-4,adding ESFAS Trip Setpoints for Auxiliary Feedwater Pumps)
  • ML17298C037  + (Proposed Tech Spec Table 3.3-5, ESF Response Times)
  • ML17298C038  + (Proposed Tech Spec Table 3.3-5,changing Containment Spray up-to-rated Speed Response Time)
  • ML20213F300  + (Proposed Tech Spec Table 3.3-5,changing ESF Response Times for Transferring Charging Pump Suction from Vol Control Tank to Refueling Water Storage Tank)
  • ML20091D584  + (Proposed Tech Spec Table 3.3-6 Re Radiation Monitoring Instrumentation & 4.3-3 Re Radiation Monitoring Instrumentation Surveillance Requirements)
  • ML20236J383  + (Proposed Tech Spec Table 3.3-7, Seismic Monitoring Instrumentation, Table 4.3-4, Seismic Monitoring... & Surveillance Requirement 4.3.3.3.2,relocating Seismic Accelerographs 1-SM-XR-6702,1-SM-XR-6703 & 1-SM-XR-6706)
  • ML20093L105  + (Proposed Tech Spec Table 3.3-7, Seismic Monitoring Instrumentation & Table 4.3-4, Seismic Monitoring Instrumentation Surveillance Requirements. Requested Change Relocates Triaxial Peak Accelerograph for Operability)
  • ML20247N205  + (Proposed Tech Spec Table 3.3-7, Seismic Monitoring Instrumentation & Associated Bases 3/4.3.3.3,changing Free Field Location for time-history Response Spectrum Analyzer)
  • ML20137P706  + (Proposed Tech Spec Table 3.3.10, App R Alternative Shutdown Instrumentation & Controls, Reflecting Additions for Alternative Shutdown Sys)
  • ML20054J658  + (Proposed Tech Spec Table 3.3.2 Re Reactor Protection Instrumentation Response Times)
  • ML17279A892  + (Proposed Tech Spec Table 3.3.2-1 Isolation Actuation Instrumentation, Offering Further Administrative Clarification)
  • ML20062A955  + (Proposed Tech Spec Table 3.3.2-1 Re Channel/Trip Logic)
  • ML20070G733  + (Proposed Tech Spec Table 3.3.2-1 Re Isolation Actuation Instrumentation)
  • ML20072E867  + (Proposed Tech Spec Table 3.3.2-1 Re Isolation Actuation Instrumentation)
  • ML20073K796  + (Proposed Tech Spec Table 3.3.2-2 Re Isolation Actuation Instrumentation Setpoints)
  • ML19354E791  + (Proposed Tech Spec Table 3.3.2-2, Isolation Actuation Instrumentation Setpoints)
  • ML20213G672  + (Proposed Tech Spec Table 3.3.2-3,deleting Requirement to Perform Time Testing on Various Temp Switches & Thermocouples)
  • ML20079M009  + (Proposed Tech Spec Table 3.3.3-1, ECCS Actuation Instrumentation, Table 3.3.3-2, ECCS Actuation Instrumentation Setpoints & Table 4.3.3.1-1, ECCS Actuation Instrumentation Surveillance Requirements)
  • ML20205T208  + (Proposed Tech Spec Table 3.3.3-2, ECCS Actuation Instrumentation Setpoints, Changing Setpoint Values for Div I Degraded Grid Relays)
  • ML20082T489  + (Proposed Tech Spec Table 3.3.4.1-2 Re ATWS Recirculation Pump Trip Sys Instrumentation Setpoints)
  • ML20085J405  + (Proposed Tech Spec Table 3.3.5-1 Re RCIC Sys Actuation Instrumentation)
  • ML17286B153  + (Proposed Tech Spec Table 3.3.6-1.4.a Re Rod Block intermediate-range Monitor Not Full in Signal)
  • ML20083D878  + (Proposed Tech Spec Table 3.3.6-2 Re Control Rod Block Instrumentation Setpoints)
  • ML20077R755  + (Proposed Tech Spec Table 3.3.6-2 Re Control Rod Block Instrumentation Setpoints)
  • ML17279A134  + (Proposed Tech Spec Table 3.3.7.1-1, Radiation Monitoring Instrumentation & Tech Spec Page B 3/4 3-4)
  • ML20066F988  + (Proposed Tech Spec Table 3.3.7.10-1, Radioactive Gaseous Effluent Monitoring Instrumentation)
  • ML17285A142  + (Proposed Tech Spec Table 3.3.7.12-1, Radioactive Gaseous Effluent Monitoring Instrumentation)
  • ML20091D790  + (Proposed Tech Spec Table 3.3.7.5-1, Accident Monitoring Instrumentation)
  • ML20245D814  + (Proposed Tech Spec Table 3.3.7.5-1,amending Action 82 to Avert Required Plant Shutdown in Event That Position Indication Instrumentation for Primary Containment Isolation Valve in Otherwise Isolated Penetration Declared Inoperable)
  • ML20154L112  + (Proposed Tech Spec Table 3.3.7.9-1, Fire Detection Instrumentation, Adding New Fire Detector Locations to Units 1 & 2)
  • ML20080B410  + (Proposed Tech Spec Table 3.5-2 Re Emergency Cooling.Safety Evaluation & Basis for Determining That Change Does Not Involve Significant Hazards Consideraton Encl)
  • ML17309A207  + (Proposed Tech Spec Table 3.5-5 Revising ESF Actuation Sys Instrumentation Trip Setpoints)
  • ML20063F212  + (Proposed Tech Spec Table 3.5.1-1 Re Functioning of Channels)
  • ML20093L604  + (Proposed Tech Spec Table 3.5.1-1, Other-Safety-Related Sys, Reflecting Actual Number of Instrument Channels for Detection of Pressurizer Level.Nshc Determination Encl)
  • ML13310B673  + (Proposed Tech Spec Table 3.5.10-1 Re Radiation Instrument Alarm Setpoint & Figures 6.2.1.1,5.2-1 & 6.2-1 Re Offsite Organization)
  • ML20076G380  + (Proposed Tech Spec Table 3.6-1 Clarifying Check Valve Testing Requirements)
  • ML17214A438  + (Proposed Tech Spec Table 3.6-1 Re Containment Leakage Paths. Safety Evaluation for Cessation of Penetration 25 Annulus Expansion Bellows Leak Testing Encl)
  • ML17303B110  + (Proposed Tech Spec Table 3.6-1, Containment Isolation Valves, Reducing Max Actuation Time from 12 to 1)