6 ENCLOSURE 1 TO NLS-86-081 PROPOSED TECHNICAL SPECIFICATION PAGES BRUNSWICK-1 TEMPERATURE SENSOR RESPONSE TIME TESTING (85TSB22) 6611180257 861113 DR ADOCK OSOu 4
(1852NLU/pgp)
SUMMARY
LIST OF REVISIONS Brunswick-1 Page No.
Description 3/4 3-22 Item 1.d - Change Response Time to "NA" 3/4 3-23 Item 3.b - Change Response Time to "NA" Item 3.c - Change Response Time to "NA" 3/4 3-24 Item 4.a.4 - Change Response Time to "NA" (1852NLU/rtJ)
(BSEP-1-76)
TABLE 3.3.2-3 ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME TRIP FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#
PRIMARY CONTAINMENT ISOLATION
.1.
1.
Low, Level 1
~<13 (321-LT-5017A-1.B-1.C-1,D-1)
(321-LTM-N017A-1.B-1 C-1.D-1) 2.
Low, Levei 2 51.0*
(B21-LT-N024A-1,B-1 and B21-LT-N025A-1,B-1)
(B21-LTM-N024A-1.B-1 and B21-LTM-N025A-1,3-1) c.
Drywell Pressure - High
$13 (C71-PT-N002A.B,C,D)
(C71-PTM-N002A-1,B-1,C-1,D-1) c.
-<l.0*
1.
Radiation - High(b)
(D12-RM-K603A,B,C,D) 2.
Pressure - Low
$13 (B21-PT-N015A,B,C,D)
(B21-PTM-N015A-1,B-1,C-1,D-1) 3.
Flow - High 50.55 (B21-PDT-N006A,B,C,D; B21-PDT-N007A,B,C,D; B21-PDT-N008A,B,C,D; B21-PDT-N009A,B,C,D)
(B21-PDTM-N006A-1,B-1,C-1,D-1; B21-PDTM-N007A-1,B-1,C-1,D-1; B21-PDTM-N008A-1,B-1,C-i,D-1; B21-PDTM-N009A-1,B-1,C-1,D-1) d.
Main Steam Line Tunnel Temperature - High NA (B21-TS-N010A,B,C,D; B21-TS-N0llA,B,C,D; B21-TS-N012A,B,C,D; B21-IS-N013A,B,C,D) e.
Condenser Vacuum - Low
$13 (B21-PT-N056A,B,C,D)
(B21-PTM-N056A-1,B-1,C-1,D-1)
BRUNSWICK - UNIT 1 3/4 3-22 Amendment No.
(BSEP-1-76)
TABLE 3.3.2-3 (Continued)
ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME TRIP FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#
ORIMARY CONTAINMENT ISOLATION (Continued) f.
Turoine Suilding Area Temperature - High NA (B21-TS-3225A B.C D; 321-TS-3226A.B,C.D:
321-TS-3227A,B,C.D; 221-TS-322SA.B.C.D:
B21-TS-3229A,B,C,D; B21-TS-3230A,B,C,D; B21-TS-3231A,B,C,D; B21-TS-3232A.B.C,D) 2.
SECONDARY CONTAINMENT ISOLATION a.
Reactor Building Exhaust Radiation - High(b) 513 (D12-RM-N010A,B) i b.
Drywell Pressure - High
$13 (C71-PT-N002A,B,C,D)
(C71-PTM-N002A-1,B-1,C-1,D-1) c.
Reactor Vessel Water Level - Low, Level 2 11.0*
(B21-LT 'iO24A-1,B-1 and B21-LT-N025A-1,B-1)
(B21-LTM-N024A-1,B-1 and B21-LTM-N025A-1,B-1) 3.
REACTOR WATER CLEANUP SYSTEM ISOLATION a.
AFlow - High
$13 (C31-dFS-N603-1A,lB) l NA b.
Area Temperature - High (C31-TS-N600A,B,C,D,E,F)
NA Area Ventilation Temperature AT - High c.
(C31-TS-N602A,B,C,D,E,F)
NA d.
Reactor Vessel Water Level - Low, Level 2
$1.0*
(B21-LT-N024 A-1,B-1 and
[
B21-LT-N025 A-1,B-1)
(B21-LTM-N024 A-1,B-1 and B21-LTM-N025 A-1,B-1) l BRUNSWICK - UNIT 1 3/4 3-23 Amendment No.
.. ~
(BSEP-1-76) u TABLE 3.3.2-3 (Continued)
ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME
??IP FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#
i.
CORE STANDBY CCOLING SYSTEMS ISOLATION 2.
Hign Pressure Coolant Injection System Isolation 1.
HPCI Steam Line Flow - High
<13(a)##
(E41-PDT-N004:
E41-PDT-N005)
(E41-PDTS-N004-2; E41-PDTS-N005-2) 2.
HPCI Steam Line High Flow Time Delay Relay NA (E41-IDR-K33; E41-TDR-K43) 3.-
HPCI Steam Supply Pressure - Low
<13 (E41-PSL-N001A,B,C,D) 4.
HPCI Steam Line Tunnel Temperature - High NA (E41-TS-3314; E41-TS-3315; E41-TS-3316; E41-TS-3317; E41-TS-3318; E41-TS-3354; E41-TS-3488; E41-TS-3489) 5.
Bus Power Monitor NA (E41-K55 and E41-K56) 6.
HPCI Turbine Exhaust Diaphragm Pressure - High NA (E41-PSH-N012A,B,C,D) 7.
HPCI Steam Line Ambient Temperature - High NA (E51-TS-N603C,D) 4 8.
HPCI Steam Line Area NA (E51-dTS-N604C,D) 9.
Emergency Area Cooler Temperature - High NA t
(E41-TS-602A,B) r b.
Reactor Core Isolation Cooling System Isolation 13(a)###
- 1. RCIC Steam Line Flow - High (E51-PDT-N017; E51-PDT-N018)
(E51-PDTS-N017-2; E51-PDTS-N018-2) r t-BRUNSWICK - UNIT 1 3/4 3-24 Amendment No.
I i
~
ENCLOSURE 2 TO NLS-86-081 PROPOSED TECHNICAL SPECIFICATION PAGES BRUNSWICK-2 TEMPERATURE SENSOR RESPONSE TIME TESTING (85TSB22) i i
l (1852NLU/pgp) l
SUM'AARY LIST OF REVISIONS Brunswick-2 Page No.
Description 3/4 3-22 Item 1.d - Change Response Time to "NA" 3/43-23 Item 3.b - Change Response Time to "NA" Item 3.c - Change Response Time to "NA" 3/4 3-24 Item 4.a.4 - Change Response Time to "NA" l
(1852NLU/rtJ )
(BSEP-2-73)
TABLE 3.3.2-3
. ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME TRIP FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#
PRIMARY CONTAINMENT ISOLATION a.
1.
Low. Level 1 513.
(B21-LT-N017A-1.3-1.C-1.D-1)
(B21-LTM-N017A-1,3-1,C-1.D-1) 2.
Low, Levei 2 31.0*
(B21-LT-NO24A-1,B-1 and B21-LT-NO25A-1,B-1)
(B21-LTM-N024A-1.B-1 and B21-LTM-N025A-1 B-1) 5.
Drywell Pressure - High
<l3 (C72-PT-N002A,B,C.D)
(C72-PTM-N002A-1,B-1,C-1 D-1) 4 c.
1.
Radiation - High(b)
-<l.0*
(D12-RM-K603A,B,C,D) 2.
Pressure - Low
$13 (B21-PT-N015A,B,C,D)
(B21-PTM-N015A-1,B-1,C-1,D-1) b.
Flow - High 30.5*
i (B21-PDT-N006A,B,C,D; B21-PDT-N007A,B,C,D; B21-PDT-N008A,B,C,D; B21-PDT-N009A,B,C,D)
(B21-PDTM-N006A-1,B-1,C-1,D-1; B21-PDTM-N007A-1,B-1,C-1,D-1; 821-PDTM-N008A-1,B-1,C-1,D-1; B21-PDTM-N009A-1,B-1,C-1,D-1) 4.
Flow - High
~<0.5*
(B21-PDTS-N006A-2; B21-PDTS-N007B-2; B21-PDTS-N008C-2; B21-PDTS-N009D-2) d.
Main Steam Line Tunnel Temperature - High NA (B21-TS-N010A,B,C,D; B21-TS-N011A,B,C D; B21-TS-N012A,B,C,D; B21-TS-N013A,B,C,D) e.
Condenser Vacuum - Low
$13
}
(B21-PT-N056A,B,C,D)
(B21-PTM-N056A-1,B-1,C-1,D-1) 1 BRUNSWICK - UNIT 2 3/4 3-22 Amendment No.
i 4
-r
..----y
.. - -, - +..
.-e
....r,.
,.....~,,,
,,--,,-.--r--
(BSEP-2-73) 3 TABLE 3.3.2-3 (Continued)
ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME 2 RIP FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#
"RIMARY CONTAINMENT ISOLATION (Continued)
Turoine duilding Area Temperature - High NA (B21-TS-3225A,B,C,D; 321-TS-3226A.B.C.D:
321-TS-3227A,B.C.D; 321-TS-322SA.B.C.D; B21-TS-3229A,B,C,D; B21-TS-3230A,B,C,D; B21-TS-3231A B,C,D; B21-TS-3232A.B C.D) 2.
SECONDARY CONTAINMENT ISOLATION a.
Reactor Building Exhaust Radiation - High(b) 513 (D12-RM-N010A,B) b.
Drywell Pressure - High
$13 (C72-PT-N002A,B,C,D)
(C72-PTM-N002A-1,B-1,C-1,D-1) c.
Reactor Vessel Water Level - Low, Level 2 31.0*
(B21-LT-N024A-1,B-1 and B21-LT-N025A-1,B-1)
(B21-LTM-N024A-1,B-1 and B21-LTM-N025A-1,B-1) 3.
REACTOR WATER CLEANUP SYSTEM ISOLATION a.
A Flow - High
~<13 (C31-dFS-N603-1A,lB) b.
Area Temperature - High NA (C31-TS-N600A,B,C,D,E,F) l c.
Area Ventilation Temperature AT - High NA' (C31-TS-N602A,B,C,D,E,F) 1.
SLCS Initiation NA (C41A-S1) c.
Reactor Vessel Water Level - Low, Level 2 31.0*
(B21-LT-NO24-A-1,B-1 and B21-LT-N025 A-1,B-1)
(B21-LTM-N024 A-1,B-1 and B21-LTM-N025 A-1,B-1)
BRUNSWICK - UNIT 2 3/4 3-23 Amendment No.
s (BSEP-2-73)
TABLE 3.3.2-3 (Continued) 4 i
ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME
~tIP-FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#
". CORE STANDBY C00LINC SYSTEMS ISOLATION i
5.
High Pressure Coolant Injection System Isolation 1.
HPCI Steam Line Flow - High
$13(a)##
(E41-PDT-N004; 4
i E41-PDT-N005)
(E41-PDTS-NOO4-2; E41-PDTS-N005-2)
I HPCI Steam Line High Flow time Delay Relay NA l
(E41-TDR-K33; E41-TDR-K43) 3.
HPCI Steam Supply Pressure - Low
$13 3
l (E41-PSL-N001A,B,C,D) 4 HPCI Steam Line Tunnel Temperature - High NA i
(E41-TS-3314; E41-TS-3315; j
E41-TS-3316; E41-IS-3317; E41-TS-3318; I
F41-TS-3354; 4
E41-TS-3488; E41-TS-3489) 5.
Bus Power Monitor NA i
(E41-K55 and E41-K56) f 6.
HPCI Turbine Exhaust Diaphragm Pressure -
High NA (E41-PSH-N012A,B,C,D) 7.
HPCI Steam Line Ambient Temperature - High NA (E51-TS-N603C,D) 8.
HPCI Steam Line Area NA (E51-dTS-N604C,D) l 9.
Emergency Area Cooler Temperature - High NA j
(E41-TS 602A,B) i i
l l
BRUNSWICK - UNIT 2 3/4 3-24 Amendment No.
.-,.-...-- - -..--- - ~, -