ML20213G672

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Table 3.3.2-3,deleting Requirement to Perform Time Testing on Various Temp Switches & Thermocouples
ML20213G672
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/13/1986
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20213G670 List:
References
85TSB22, NLS-86-081, NLS-86-81, NUDOCS 8611180257
Download: ML20213G672 (10)


Text

6 ENCLOSURE 1 TO NLS-86-081 PROPOSED TECHNICAL SPECIFICATION PAGES BRUNSWICK-1 TEMPERATURE SENSOR RESPONSE TIME TESTING (85TSB22) 6611180257 861113 DR ADOCK OSOu 4

(1852NLU/pgp)

SUMMARY

LIST OF REVISIONS Brunswick-1 Page No.

Description 3/4 3-22 Item 1.d - Change Response Time to "NA" 3/4 3-23 Item 3.b - Change Response Time to "NA" Item 3.c - Change Response Time to "NA" 3/4 3-24 Item 4.a.4 - Change Response Time to "NA" (1852NLU/rtJ)

(BSEP-1-76)

TABLE 3.3.2-3 ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME TRIP FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#

PRIMARY CONTAINMENT ISOLATION

.1.

Reactor Vessel Water Level -

1.

Low, Level 1

~<13 (321-LT-5017A-1.B-1.C-1,D-1)

(321-LTM-N017A-1.B-1 C-1.D-1) 2.

Low, Levei 2 51.0*

(B21-LT-N024A-1,B-1 and B21-LT-N025A-1,B-1)

(B21-LTM-N024A-1.B-1 and B21-LTM-N025A-1,3-1) c.

Drywell Pressure - High

$13 (C71-PT-N002A.B,C,D)

(C71-PTM-N002A-1,B-1,C-1,D-1) c.

Main Steam Line

-<l.0*

1.

Radiation - High(b)

(D12-RM-K603A,B,C,D) 2.

Pressure - Low

$13 (B21-PT-N015A,B,C,D)

(B21-PTM-N015A-1,B-1,C-1,D-1) 3.

Flow - High 50.55 (B21-PDT-N006A,B,C,D; B21-PDT-N007A,B,C,D; B21-PDT-N008A,B,C,D; B21-PDT-N009A,B,C,D)

(B21-PDTM-N006A-1,B-1,C-1,D-1; B21-PDTM-N007A-1,B-1,C-1,D-1; B21-PDTM-N008A-1,B-1,C-i,D-1; B21-PDTM-N009A-1,B-1,C-1,D-1) d.

Main Steam Line Tunnel Temperature - High NA (B21-TS-N010A,B,C,D; B21-TS-N0llA,B,C,D; B21-TS-N012A,B,C,D; B21-IS-N013A,B,C,D) e.

Condenser Vacuum - Low

$13 (B21-PT-N056A,B,C,D)

(B21-PTM-N056A-1,B-1,C-1,D-1)

BRUNSWICK - UNIT 1 3/4 3-22 Amendment No.

(BSEP-1-76)

TABLE 3.3.2-3 (Continued)

ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME TRIP FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#

ORIMARY CONTAINMENT ISOLATION (Continued) f.

Turoine Suilding Area Temperature - High NA (B21-TS-3225A B.C D; 321-TS-3226A.B,C.D:

321-TS-3227A,B,C.D; 221-TS-322SA.B.C.D:

B21-TS-3229A,B,C,D; B21-TS-3230A,B,C,D; B21-TS-3231A,B,C,D; B21-TS-3232A.B.C,D) 2.

SECONDARY CONTAINMENT ISOLATION a.

Reactor Building Exhaust Radiation - High(b) 513 (D12-RM-N010A,B) i b.

Drywell Pressure - High

$13 (C71-PT-N002A,B,C,D)

(C71-PTM-N002A-1,B-1,C-1,D-1) c.

Reactor Vessel Water Level - Low, Level 2 11.0*

(B21-LT 'iO24A-1,B-1 and B21-LT-N025A-1,B-1)

(B21-LTM-N024A-1,B-1 and B21-LTM-N025A-1,B-1) 3.

REACTOR WATER CLEANUP SYSTEM ISOLATION a.

AFlow - High

$13 (C31-dFS-N603-1A,lB) l NA b.

Area Temperature - High (C31-TS-N600A,B,C,D,E,F)

NA Area Ventilation Temperature AT - High c.

(C31-TS-N602A,B,C,D,E,F)

NA d.

SLCS Initiation (C41A-SI) e.

Reactor Vessel Water Level - Low, Level 2

$1.0*

(B21-LT-N024 A-1,B-1 and

[

B21-LT-N025 A-1,B-1)

(B21-LTM-N024 A-1,B-1 and B21-LTM-N025 A-1,B-1) l BRUNSWICK - UNIT 1 3/4 3-23 Amendment No.

.. ~

(BSEP-1-76) u TABLE 3.3.2-3 (Continued)

ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME

??IP FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#

i.

CORE STANDBY CCOLING SYSTEMS ISOLATION 2.

Hign Pressure Coolant Injection System Isolation 1.

HPCI Steam Line Flow - High

<13(a)##

(E41-PDT-N004:

E41-PDT-N005)

(E41-PDTS-N004-2; E41-PDTS-N005-2) 2.

HPCI Steam Line High Flow Time Delay Relay NA (E41-IDR-K33; E41-TDR-K43) 3.-

HPCI Steam Supply Pressure - Low

<13 (E41-PSL-N001A,B,C,D) 4.

HPCI Steam Line Tunnel Temperature - High NA (E41-TS-3314; E41-TS-3315; E41-TS-3316; E41-TS-3317; E41-TS-3318; E41-TS-3354; E41-TS-3488; E41-TS-3489) 5.

Bus Power Monitor NA (E41-K55 and E41-K56) 6.

HPCI Turbine Exhaust Diaphragm Pressure - High NA (E41-PSH-N012A,B,C,D) 7.

HPCI Steam Line Ambient Temperature - High NA (E51-TS-N603C,D) 4 8.

HPCI Steam Line Area NA (E51-dTS-N604C,D) 9.

Emergency Area Cooler Temperature - High NA t

(E41-TS-602A,B) r b.

Reactor Core Isolation Cooling System Isolation 13(a)###

1. RCIC Steam Line Flow - High (E51-PDT-N017; E51-PDT-N018)

(E51-PDTS-N017-2; E51-PDTS-N018-2) r t-BRUNSWICK - UNIT 1 3/4 3-24 Amendment No.

I i

~

ENCLOSURE 2 TO NLS-86-081 PROPOSED TECHNICAL SPECIFICATION PAGES BRUNSWICK-2 TEMPERATURE SENSOR RESPONSE TIME TESTING (85TSB22) i i

l (1852NLU/pgp) l

SUM'AARY LIST OF REVISIONS Brunswick-2 Page No.

Description 3/4 3-22 Item 1.d - Change Response Time to "NA" 3/43-23 Item 3.b - Change Response Time to "NA" Item 3.c - Change Response Time to "NA" 3/4 3-24 Item 4.a.4 - Change Response Time to "NA" l

(1852NLU/rtJ )

(BSEP-2-73)

TABLE 3.3.2-3

. ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME TRIP FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#

PRIMARY CONTAINMENT ISOLATION a.

Reactor Vessel Water Level -

1.

Low. Level 1 513.

(B21-LT-N017A-1.3-1.C-1.D-1)

(B21-LTM-N017A-1,3-1,C-1.D-1) 2.

Low, Levei 2 31.0*

(B21-LT-NO24A-1,B-1 and B21-LT-NO25A-1,B-1)

(B21-LTM-N024A-1.B-1 and B21-LTM-N025A-1 B-1) 5.

Drywell Pressure - High

<l3 (C72-PT-N002A,B,C.D)

(C72-PTM-N002A-1,B-1,C-1 D-1) 4 c.

Main Steam Line I

1.

Radiation - High(b)

-<l.0*

(D12-RM-K603A,B,C,D) 2.

Pressure - Low

$13 (B21-PT-N015A,B,C,D)

(B21-PTM-N015A-1,B-1,C-1,D-1) b.

Flow - High 30.5*

i (B21-PDT-N006A,B,C,D; B21-PDT-N007A,B,C,D; B21-PDT-N008A,B,C,D; B21-PDT-N009A,B,C,D)

(B21-PDTM-N006A-1,B-1,C-1,D-1; B21-PDTM-N007A-1,B-1,C-1,D-1; 821-PDTM-N008A-1,B-1,C-1,D-1; B21-PDTM-N009A-1,B-1,C-1,D-1) 4.

Flow - High

~<0.5*

(B21-PDTS-N006A-2; B21-PDTS-N007B-2; B21-PDTS-N008C-2; B21-PDTS-N009D-2) d.

Main Steam Line Tunnel Temperature - High NA (B21-TS-N010A,B,C,D; B21-TS-N011A,B,C D; B21-TS-N012A,B,C,D; B21-TS-N013A,B,C,D) e.

Condenser Vacuum - Low

$13

}

(B21-PT-N056A,B,C,D)

(B21-PTM-N056A-1,B-1,C-1,D-1) 1 BRUNSWICK - UNIT 2 3/4 3-22 Amendment No.

i 4

-r

..----y

.. - -, - +..

.-e

....r,.

,.....~,,,

,,--,,-.--r--

(BSEP-2-73) 3 TABLE 3.3.2-3 (Continued)

ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME 2 RIP FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#

"RIMARY CONTAINMENT ISOLATION (Continued)

Turoine duilding Area Temperature - High NA (B21-TS-3225A,B,C,D; 321-TS-3226A.B.C.D:

321-TS-3227A,B.C.D; 321-TS-322SA.B.C.D; B21-TS-3229A,B,C,D; B21-TS-3230A,B,C,D; B21-TS-3231A B,C,D; B21-TS-3232A.B C.D) 2.

SECONDARY CONTAINMENT ISOLATION a.

Reactor Building Exhaust Radiation - High(b) 513 (D12-RM-N010A,B) b.

Drywell Pressure - High

$13 (C72-PT-N002A,B,C,D)

(C72-PTM-N002A-1,B-1,C-1,D-1) c.

Reactor Vessel Water Level - Low, Level 2 31.0*

(B21-LT-N024A-1,B-1 and B21-LT-N025A-1,B-1)

(B21-LTM-N024A-1,B-1 and B21-LTM-N025A-1,B-1) 3.

REACTOR WATER CLEANUP SYSTEM ISOLATION a.

A Flow - High

~<13 (C31-dFS-N603-1A,lB) b.

Area Temperature - High NA (C31-TS-N600A,B,C,D,E,F) l c.

Area Ventilation Temperature AT - High NA' (C31-TS-N602A,B,C,D,E,F) 1.

SLCS Initiation NA (C41A-S1) c.

Reactor Vessel Water Level - Low, Level 2 31.0*

(B21-LT-NO24-A-1,B-1 and B21-LT-N025 A-1,B-1)

(B21-LTM-N024 A-1,B-1 and B21-LTM-N025 A-1,B-1)

BRUNSWICK - UNIT 2 3/4 3-23 Amendment No.

s (BSEP-2-73)

TABLE 3.3.2-3 (Continued) 4 i

ISOLATION SYSTEM INSTRUMENTATION RESPONSE TIME

~tIP-FUNCTION AND INSTRUMENT NUMBER RESPONSE TIME (Seconds)#

". CORE STANDBY C00LINC SYSTEMS ISOLATION i

5.

High Pressure Coolant Injection System Isolation 1.

HPCI Steam Line Flow - High

$13(a)##

(E41-PDT-N004; 4

i E41-PDT-N005)

(E41-PDTS-NOO4-2; E41-PDTS-N005-2)

I HPCI Steam Line High Flow time Delay Relay NA l

(E41-TDR-K33; E41-TDR-K43) 3.

HPCI Steam Supply Pressure - Low

$13 3

l (E41-PSL-N001A,B,C,D) 4 HPCI Steam Line Tunnel Temperature - High NA i

(E41-TS-3314; E41-TS-3315; j

E41-TS-3316; E41-IS-3317; E41-TS-3318; I

F41-TS-3354; 4

E41-TS-3488; E41-TS-3489) 5.

Bus Power Monitor NA i

(E41-K55 and E41-K56) f 6.

HPCI Turbine Exhaust Diaphragm Pressure -

High NA (E41-PSH-N012A,B,C,D) 7.

HPCI Steam Line Ambient Temperature - High NA (E51-TS-N603C,D) 8.

HPCI Steam Line Area NA (E51-dTS-N604C,D) l 9.

Emergency Area Cooler Temperature - High NA j

(E41-TS 602A,B) i i

l l

BRUNSWICK - UNIT 2 3/4 3-24 Amendment No.

.-,.-...-- - -..--- - ~, -

. _. -. _ - _. - -, - _ - - -..