ML13310B673

From kanterella
Jump to navigation Jump to search

Proposed Tech Spec Table 3.5.10-1 Re Radiation Instrument Alarm Setpoint & Figures 6.2.1.1,5.2-1 & 6.2-1 Re Offsite Organization
ML13310B673
Person / Time
Site: San Onofre  
Issue date: 09/04/1984
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML13310B671 List:
References
TAC-54700, TAC-54701, TAC-54893, NUDOCS 8409060246
Download: ML13310B673 (9)


Text

Chairman of the Board Executive Vice President Vice President Vice PresidentVice President Vice President (Engineering Vice President I

& Site Manager a (Nuclear Engineer-Control (Fuel Supply) and(Power Supply)(

Construction)

Generation Site)

Licensing)

I I

ManagerManager, Ncer I

Manager~

Manager, Nuclear Audit 01~o Eninerngl ero Nuclear Nuclear and Review 01 Egnerig I

enrtinLicensing I

Engineering COommitte Designservices Staffgr Mangerr.

Manager.

Vcerin Material ande (Ner i

Ae Gsaftiy Safetyr and Administrative)

Liensing)

Maeintenance SLrviccen E

eeno S

port Services

Managerr, Man grProject UMt C)

Site Staff Station on Site Staff Review Manager Committee j

I L --------------------------------------------------------------------

I 8 t409060246e8 1 0 9 0 4 PDR ADOCK 05000206 RPDR FIGURE 6.2.1.1 OFFSITE ORGANIZATION SAN ONOFRE NUCLEAR GENERATING STATION -

UNIT 1

-9 t'cc I

>I I

4e C

C o fmm E

I ILr 0

rC o

aim I2 JSoIC c a

  • I Zor c

aacsc 0a

-aj Z" us cc

.2

=2ae c0 C

L4 L....

J ata o

18*co

.1*.

.c~~

ow 31, II 4c c

Sm am

>u J

Ew CL o

244

&0 Cm v

cc 020

  • z 2

PROPOSED CHANGE NO.

130

z

o.

Chairman of the Board C

Executive Vice President Senior Vice President Vice President Vice President Vice President (Engineering Vice President

& Site Manager (Nuclear Engineer-Vice President and (Power Supply)

(Nuclear Ing, Safety and (Fuel Supply)

Construction)

Generation Site)

Licensing)

Manager ner

Manager, Manager, m

Engineering Nuclear aNuclear a

Design Generation Ucensing Engineering Services

Manager, Operations Mager nd
Manager, Manager, and i

Quality Nuclear MainAdmnistriv Assurance Safety SupportServices CProject Manager.

Nuclear Manager.

Budgets and Safety Co on Cost Control Group L~ -----------------------

ProjectManager, U'

Sanageor, Nuclear Training 00Units 2 & 3 Tann Station On Site Supervising adquarterManager Review
Engineer, staff Site Staf MCommittee ISEG FIGURE 6.2-1 OFFSITE ORGANIZATION SAN ONOFRE NUCLEAR GENERATING STATION

ENCLOSURE 2

Ve initVice President Vice PresidentVice President (Fuel Supply)

(PwrSpl)anNcerigdSft n

or Construction ManngrMnaeagulerAui EnginengEninerngiomite Designsien I1 I

II Vice PrsidentVice President 11 Vice President Nuclear Vic Pesien (EgieerngVice President

& Site Manager i (Nuclear Engineer-Cotl (FelSupl) nd(Power Supply)

I Nclear

'IIng, Safety andBor I

(N Bor Constrution)

IGeneration Site) 11 Licensing) o MManager' I

Manager, Manager, Nuclear Audit N

Nuclear Nuclear and Review EnMaintenane Generation I

Licensing Engineering Committee DrServices Mananager I

I I

nI r

Operations Maagr

Manager, Manager, I

and Admnteraivde Ouality Nuclear IMaintenance AmSrive Assurance Safety Support Srie I

Project I

Manager, Manager, ISan Onofre

-Nuclear I

Unit 1Training I

I I,-----------------------------------------------------------------

edurrd I

OnIit I Site Staff StationOnst Staff Review 1H

~Manager Committee 1

FIGURE 6.2.1.1 OFFSITE ORGANIZATION SAN ONOFRE NUCLEAR GENERATING STATION -

UNIT 1

Executive E Vice President Senior Vice President Vice President Vice President I

Vice President Nuclear Vice President (Engineering Vice President

& Site Manager i(Nuclear Engineer-Control (Fuel Supply) and (Power Supply)

(Nuclear ing, Safety and Board Construction)

I Generation Site)

L Manager

Manager, of NcerI
Manager, Manager, Nuclear Audit Engineering Nuclear Nuclear and Review Dnineig Ierain I

Licensing Engineer]ng Committee DealgnSevcs I

I MI Vcersid Manager

Manager, Manager,i Material and andNucler Nuclear Maintenance Services Assurance Safety
  • Support II
  • Projecti
Manager, Manager, and

-nr

-Nuculiyeucea Unit I I

I 1

Site taffOn Site L

SauStataio Review t--+

Manager Committee L----------------------------------------------------------------------

FIGURE 5.2-1 OFFSITE ORGANIZATION SAN ONOFRE NUCLEAR GENERATING STATION

-UNIT 1

z 0

Chairman of the Board Executive Vice President Senior Vice President Vice President Vice President Vice President (Engineering Vice President

& Site Manager (Nuclear Engineer-Vice President and (Power Supply)

(Nuclear Ing, Safety and (Fuel Supply)

Construction)

Generation Site)

Licensing)

Managerger

Manager, ofanuctr
Manager, Manager.

Engineering o

ear Nuclear Nuclear Design Generation Ucensing Engineering Services Manager.

Operations Maa gend

Manager, Manager, and

-ti and Ouality Nuclear Maintenance Administrative Assurance Safely Support Services Manaer

Manager, Nuclear
  • aagr -

udgets and -Sft Commn Cot CotrolSafely FacilitiesCost Control Group Project Manager.

Manager, San Onotre ula Units 2 & 3 Training Station On Site Supervising Headquarters StatioReview
Engineer, sHqte Site Staff Manager Committee ISEG L-----------------

FIGURE 6.2-1 OFFSITE ORGANIZATION SAN ONOFRE NUCLEAR GENERATING STATION

TABLE 3.5.10-1 RADIATION MONITORING INSTRUMENTATION MINIMUM CHANNELS APPLICABLE ALARM MEASUREMENT INSTRUMENT OPERABLE MODES SETPOINT RANGE ACTION

1. AREA MONITORS
a. Control Room Area 1

All 1 mR/hr 10-2 -l02mR/hr 25 (R-1231)

b. Spent Fuel Pool Area 1

25 mR/hr 10-2 -102mR/hr 26 (R-1236)

c.

Containment Radiation 2

1, 2, 3'& 4 IR/hr 1-108 R/hr 27 Monitor-High Range (R-1255, R-1257)

2. PROCESS MONITORS
a. Wide Range Gas Monitor 1

1, 2, 3 & 4 per 00CM 10-7-105 uCi/cc 27 (R-1254)

b. Main Steam Dump and Safety Valve Channels 1/steamline 1, 2, 3 & 4 ImR/hr (low) 10-1-104 mR/hr 27 (R-1256A&B, R-125BA&B) 1 R/hr (high) 10-1-104 R/hr
  • With fuel in the spent fuel pool or building Lo C11

TABLE 3.5.10-1 RADIATION MONITORING INSTRUMENTATION MINIMUM CHANNELS APPLICABLE ALARM MEASUREMENT INSTRUMENT OPERABLE MODES SETPOINT RANGE ACTION

1. AREA MONITORS
a. Control Room Area 1

All 1 mR/hr 10-2 -102mR/hr 25 (R-1231)

b. Spent Fuel Pool Area 1

25 mR/hr 10-2 -102mR/hr 26 (R-1236)

c. Containment Radiation 2

1, 2, 3 & 4 10 R/hr 1-108 R/hr 27 Monitor-High Range (R-1255, R-1257)

2. PROCESS MONITORS
a. Wide Range Gas Monitor 1

1, 2, 3 & 4 per ODCH 10-7-105 uCi/cc 27 (R-1254)

b. Main Steam Dump and Safety Valve Channels 1/steamline 1, 2, 3 & 4 lmR/hr (low) 10-1-104 mR/hr 27 (R-1256A&B, R-1258A&B) 1 R/hr (high) 10-1-104 R/hr
  • With fuel in the spent fuel pool or building C

C-)

C)

P1