ML17325B185

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Table 3.3-2, Reactor Trip Sys Instrumentation Response Times
ML17325B185
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/29/1989
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17325B184 List:
References
AEP:NRC:1078, NUDOCS 8904040230
Download: ML17325B185 (3)


Text

ATTACHMENT 2 TO AEP:NRC:1078 PROPOSED REVISED TECHNICAL SPECIFICATION PAGES S9'04040230 890329 PDR ADOCK 05000315 P

PDC

t

~

I

TABLE 3.3-2 REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT

RESPONSE

TIME

1. Manual Reactor Trip 2.

Power Range, Neutron Flux (High and Low Setpoint)

NOT APPLICABLE Less than or equal to 0 '

seconds 3.

Power Range, Neutron Flux, High Positive Rate NOT APPLICABLE 4.

Power Range, Neutron Flux, High Negative Rate Less than or equal to 0.5 seconds*

5. Intermediate
Range, Neutron Flux 6.

Source

Range, Neutron Flux
7. Overtemperature delta T NOT APPLICABLE NOT APPLICABLE Less than or equal to 6.0 seconds
8. Overpower delta T
9. Pressurizer Pressure--Low NOT APPLICABLE Less than or equal to 1.0 seconds 10 'ressurizer Pressure--High Less than or equal to 1.0 seconds 11.Pressurizer Water Level--High NOT APPLICABLE
  • Neutron detectors are exempt from response time testing.

Response

time of the neutron flux signal portion of the channel shall be measured from detector output or input of first electronic component in channel.

COOK NUCLEAR PLANT - UNIT 1 3/4 3-10 AMENDMENT NO.