Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20114A841 + (Proposed TS Table 3.1.1 Re Protective Instrumentation Requirements for Low Condenser Vacuum)
- B14464, Proposed TS Table 3.1.1, RPS (Scram) Instrumentation Requirement & Table 4.1.1, Scram Instrumentation Functional Tests,Min Functional Test Frequencies for Safety Instruments & Control Circuits + (Proposed TS Table 3.1.1, RPS (Scram) Instrumentation Requirement & Table 4.1.1, Scram Instrumentation Functional Tests,Min Functional Test Frequencies for Safety Instruments & Control Circuits)
- ML20106C805 + (Proposed TS Table 3.12-1, Water Spray/Sprinkler Protected Areas & Table 4.12.1, Water Spray/Sprinkler Sys Tests)
- ML20056C334 + (Proposed TS Table 3.15, Seismic Monitoring Instrumentation & 1.0 Definitions Section Covering Shutdown Mode)
- ML20116M360 + (Proposed TS Table 3.2-1, DNB Parameters Reducing RCS Total Flow Rate to 375,000 Gpm)
- ML20106C754 + (Proposed TS Table 3.2-1, Instrumentation That Initiates Primary Containment Isolation)
- ML20101H382 + (Proposed TS Table 3.2-2 Re Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements)
- ML20095J464 + (Proposed TS Table 3.2-A Re Instrumentation That Initiated Primary Containment Isolation)
- ML20082D117 + (Proposed TS Table 3.2-A, Isolation Actuation Instrumentation)
- ML20114B145 + (Proposed TS Table 3.2-B Re Instrumentation That Initiates or Controls Core & Containment Cooling Sys)
- ML17056C274 + (Proposed TS Table 3.2.7 Re RCS Isolation Valves,Table 3.2.7.1 Re Primary Coolant Sys Pressure Isolation Valves & Table 3.3.4 Re Primary Containment Isolation Valves,Lines Entering Free Space of Containment)
- ML20102A369 + (Proposed TS Table 3.2.C Re Instrumentation That Initiates Rod blocks,4.2.C Re Surveillance Requirements for Instrumentation That Initiate Rod Blocks & LCO 4.3.A.2 Re Reactivity Margin - Inoperable Control Rods)
- ML18036A887 + (Proposed TS Table 3.2.C Re Instrumentation That Initiates Rod Blocks)
- ML20044G508 + (Proposed TS Table 3.2.F Re Surveillance Instrumentation Re Control Rod Position & Neutron Monitoring)
- ML18036A828 + (Proposed TS Table 3.2.F Re Surveillance Instrumentation for Drywell Pressure,Drywell Temp,Suppression Chamber Air Temp & Drywell Temp & Pressure & Timer)
- ML20012G590 + (Proposed TS Table 3.2.f Re Surveillance Instrumentation for Control Rod Position & Neutron Monitoring & Drywell Hydrogen Concentration Analyzer & Monitor)
- ML18058B390 + (Proposed TS Table 3.23-2, Radiation Peaking Factor Limits for Cycle 11)
- ML18096A926 + (Proposed TS Table 3.3-1 Re Reactor Trip Sys Instrumentation & Table 4.3-1 Re Reactor Trip Sys Instrumentation Surveillance Requirements)
- ML20114B676 + (Proposed TS Table 3.3-1 Re Reactor Trip Sys Instrumentation & Table 4.3-1 Re Reactor Trip Sys Instrumentation Surveillance Requirements)
- ML20035H220 + (Proposed TS Table 3.3-1, Reactor Trip Sys Instrumentation & TS Table 4.3-1, Reactor Trip Sys Instrumentation Sr)
- ML17329A585 + (Proposed TS Table 3.3-10 & 3.3-11 Re post-accident Monitoring Instrumentation)
- ML20113H943 + (Proposed TS Table 3.3-10 Re Accident Monitoring Instrumentation)
- ML20063G707 + (Proposed TS Table 3.3-11, Fire Detection Instruments)
- ML18010A584 + (Proposed TS Table 3.3-2 Re ESFAS Instrumentation,Table 3.3-6 Re Radiation Monitoring Instrumentation for Plant Operations & Table 3.3-10 Re Accident Monitoring Instrumentation)
- ML20092F320 + (Proposed TS Table 3.3-2 Re Reactor Trip Sys Instrumentation & Table 3.3-5 Re ESFAS Instrumentation)
- ML20125C266 + (Proposed TS Table 3.3-3 Re ESFAS Instrumentation)
- ML20072Q186 + (Proposed TS Table 3.3-4 Re 4 Kv Bus Undervoltage Trip Setpoint & Allowable Value)
- ML20073S799 + (Proposed TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints)
- ML20115G290 + (Proposed TS Table 3.3-6, Radiation Monitoring Instrumentation)
- ML20106A672 + (Proposed TS Table 3.3-7, Seismic Monitoring Instrumentation)
- ML20081D159 + (Proposed TS Table 3.3-8, Accident Monitoring Instrumentation, Deleting Loop Numbers 551,552,553 & 554)
- ML20126E690 + (Proposed TS Table 3.3-9, Remote Shutdown Monitoring Instrumentation)
- ML20118A691 + (Proposed TS Table 3.3.2-1 Re Isolation Actuation Instrumentation,Table 3.3.2-3 Re Isolation Sys Instrumentation Response Time & Table 4.3.2-1 Re Isolation Actuation Instrumentation SR)
- ML20036A901 + (Proposed TS Table 3.3.2-1,Action 26 Re Establishment of Secondary Containment Integrity W/Filtration,Recirculation & Ventilation Sys Operating within 1 H)
- ML20094P537 + (Proposed TS Table 3.3.2-3 Re Isolation Actuation Sys Instrumentation Response Time)
- B14340, Proposed TS Table 3.3.3, Reactor Protection Sys (Scram) Instrumentation Requirements + (Proposed TS Table 3.3.3, Reactor Protection Sys (Scram) Instrumentation Requirements)
- ML17289A841 + (Proposed TS Table 3.3.3-1 Re ECCS Actuation Instrumentation & Table 3.3.3-2 Re ECCS Actuation Instrumentation Setpoints)
- ML20035D082 + (Proposed TS Table 3.3.3.1, ECCS Actuation Instrumentation & Bases 3/4.3.1 Re RPS Instrumentation)
- ML20073L878 + (Proposed TS Table 3.3.7.1-1 Re Radiation Monitoring Instrumentation)
- ML17289A862 + (Proposed TS Table 3.3.7.12-1, Explosive Gas Monitoring Instrumentation)
- ML20106C220 + (Proposed TS Table 3.3.7.5-1, Accident Monitoring Instrumentation & TS 3/4.6.4 Re LCO for Containment Isolation Valves)
- ML20044E002 + (Proposed TS Table 3.5-1, Instruments Operating Conditions)
- ML20128A327 + (Proposed TS Table 3.5.1-1 Re Number of Channels Required to Be Operable)
- ML18096B256 + (Proposed TS Table 3.6-1, Containment Isolation Valves)
- ML17263A210 + (Proposed TS Table 3.6-1, Containment Isolation Valves)
- B14014, Proposed TS Table 3.6-2 Re Containment Isolation Valves + (Proposed TS Table 3.6-2 Re Containment Isolation Valves)
- ML17291A398 + (Proposed TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements)
- ML20058P210 + (Proposed TS Table 3.6.3-1, Pcivs, Reflecting New Pcivs, Per NRC Bulletin 93-003)
- ML20115E030 + (Proposed TS Table 3.6.B.2-1,raising Reactor Water Conductivity Limit to Support Implementation of Noble Metal Chemical Addition at Plant as Method to Enhance Effectiveness of HWC in Mitigating IGSCC)
- ML20056C338 + (Proposed TS Table 3.7-1, Max Allowable Power-Range Neutron Flux High Setpoint W/Inoperable Steam Line Safety Valves During Four-Loop Operation)
- ML18153D119 + (Proposed TS Table 3.7-2 Re Engineered Safeguards Action Instrument Operating Conditions & Table 4.1-1 Re Min Frequencies for Check,Calibrs & Test of Instrument Channels)