ML17329A585

From kanterella
Jump to navigation Jump to search
Proposed TS Table 3.3-10 & 3.3-11 Re post-accident Monitoring Instrumentation
ML17329A585
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/12/1992
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17329A584 List:
References
NUDOCS 9208180196
Download: ML17329A585 (6)


Text

Attachment 2 to AEP:NRC:1170D Existing Technical Specifications for Donald C.

Cook Nuclear'lant Units 1 and 2

Marked to Reflect Proposed Changes C~

9a0818019S.moaia PDR..

ADOCK'050003i 5.

\\

AS CC DE T AN TAll NC S

RN F. TA AN

//gall llOT (Mido Range)

TCO (MIde Range )

l. Containment Pressure
2. Reactor Coolant Outlet Temperature-
3. Reactor Coolant Inlet Temparature-
4. Reactor Coolant Pressure-Mide Ran e

e ange

5. Pressurizer Mater Level
6. Steam Line Pressure 7.; Steam Cenerator Mater Level-Harrow Range S. Refueling Mater Storage Tank Mater Level
9. Boric Acid Tank Solution Level 10.Auxiliary Feedwater Flow Rata 11.Reactor Coolant System Subcooling Margin Monitor 12.PORV Position Indicator -- Liml.t Switches***

13.PORV Block Valve Posl,tion Indicator -- Liml.t Swf.tches 14.Safety Valve Posi.tion Indicator -- Acoustic Monl.tor 15.Incoro Thermocouplas (Core Exit Tharmocouplos) 16.Reactor Coolant Inventory Tracking System (Reactor Vassal Level Indication) 17.Containment Sump Level 1S.Containment Mater Level MINIMUM CllAHHELS

~AER~P.

P 2

2 2

2 2

2/Steam Cenerator 1/Steam Generator 2

1 1/Steam Generators'**

1/Valve

~ 1/Valve g,> ~ >+4

'~

2/Core Quadrant One Train (3 Channels/Train) 2'4***

Steam Cenerator Mater Level Channels can be.~sed as a subst t rh orra PRODAC 250 subcooling margin readout can be used as a substi.tute for t e g

substitute for the PORV I di pos tl.on (1 channef. per throe valves

- heade

- headered discharge) can bo used as a

n cator,- Limit Swl.tches instraanents.

The requirements for these instruments will bec

~ ff i

f ot replaced and become oper ti 1

Tl l

acorns e

ectivo a ter the level trans i

mittors aro modified described in the Bases a

one

>e sc >edulc for modif c o

i ati n or repl.accment of tho trapsmitters is e

su zer afet val (SV A) sl.t n l.n a

-t to

-1 qu em s

n l.l e,of le t

Amendment Ho. 406, 1:W- (

OS

-ACC TABI.E 3 3-10 0

ORI G

STRllHFN AT ON

~Sjl~U~N HINIMljM CMANNEIS O E

1.

Containment Pressure 2.

Reactor Coolant Outlet Temperature Tsoz (Wide Range) 3.

Reactor Coolant Inlet TemPerature

- Tcols (Wide Range) 4.

Reactor Coolant Pressure

-. Wide Range 5,

Pressurizer Water Level 6.

Steam Line Pressure 7.

Steam Generator Water Level - Narrow Range 8.

Refueling Water Storage Tank Water Level 9.

Boric Acid Tank Solution Level 10.

Auxiliary Feedwater Flow Rate 11.

Reactor Coolant System Subcooling Margin Monitor 12.

PORV Position Indicator - Limit Switches***

13.

PORV Block Valve Position Indicator

- Limit Switches 14.

Safety Valve Position Indicator

- Acoustic Monitor~~~

15.

Incore Thermocouples (Core Exit Thermocouples) 16.

Reactor Coo)ant Inventory Tracking System (Reactor Vessel Level Indication) 17.

Containment Sump Level 18.

Containment Water Level 2

2 2

2 2

2/S team, Generator 1/Steam Generator 2

1 1/Steam Generator*

1**

1/Valve 1/Valve g 0ue of3++

C 2/Core Quadrant One Train (3 channels/Train) 1****

2****

Steam Generator Water Level Channels can be used as a substitute for the corresponding auxiliary feedwater flow rate channel instrument.

PRODAC 250 subcooling margin readout can be used as a substitute for the subcooling monitor<

instrument.

  • ~ Acoustic monitoring of PORV position (1 channel per three valves

- headered discharge) can be used as a substitute for the PORV Indicator

- Limit Switches instruments.

        • The requirements for these instruments will become effective after the level transmitters are modified or replaced and become operational.

The schedule for modification or replacement of the transmitters is described in the Bases.

    • 4* e sur er afe va ve V 45 pos ion ic r

co st c o

o 7

e ab e

e e ts t

h d f yc (Amendment No.

OR, 95 g EMeet tv~eCeresaaetup Mellowing-refueling-out:.ag~ueeenH~ched~~~zrri~

Attachment 3 to AEP:NRC:1170D Proposed Technical Specifications for Donald C.

Cook Nuclear Plant Units 1 and 2

TABLE 3.3-11 POST-ACCIDENT MONITORING INSTRUMENTATION INSTRUMENT MINIMUM CHANNELS OPERABLE l.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

THoT (Wide Range)

Tcolo (Wide Range)

Containment Pressure Reactor Coolant Outlet Temperature-Reactor Coolant Inlet Temperature-Reactor Coolant Pressure-Wide Range Pressurizer Water Level Steam Line Pressure Steam Generator Water Level-Narrow Range Refueling Water Storage Tank Water Level Boric Acid Tank Solution Level Auxiliary Feedwater Flow Rate Reactor Coolant System Subcooling Margin Monitor PORV Position -Indicator -- Limit Switches~

PORV Block Valve Position Indicator -- Limit Switches Safety Valve Position Indicator -- Acoustic Monitor Incore Thermocouples (Core Exit Thermocouples)

Reactor Coolant Inventory Tracking System (Reactor Vessel Level Indication)

Containment Sump Level Containment Water Level 2

2 2

2 2

2/Steam Generator 1/Steam Generator 2

1 1/Steam Generator*

]**

1/Valve 1/Valve 2 Out of 3 Total 2/Core Quadrant One Train (3 Channels/Train) 2 Steam Generator Water Level Channels can be used as a substitute for the corresponding auxiliary feedwater flow rate channel instrument.

PRODAC 250 subcooling margin readout can be used as a substitute for the subcooling monitor instrument.

Acoustic moni.toring of PORV position (1 channel per three valves

- headered discharge) can be used as a substitute for the PORV Indicator - Limit Switches instruments.

The requirements for these instruments will become effective after the level transmitters are modified or replaced and become operational.

The schedule for modification or replacement of the transmitters is described in the Bases.

COOK NUCLEAR PLANT - UNIT 1 3/4 3-55 Amendment No.

TABLE 3.3-10 POST-ACCIDENT MONITORING INSTRUMENTATION INSTRUMENT MINIMUM CHANNELS OPERABLE l.

2.

3.

4..

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

Containment Pressure Reactor Coolant Outlet Temperature T<0> (Wide Range)

Reactor Coolant Inlet Temperature

- T~gp (Wide Range)

Reactor Coolant Pressure

- Wide Range Pressurizer Water Level Steam Line Pressure Steam Generator Water Level - Narrow Range Refueling Water Storage Tank Water Level Boric Acid Tank Solution Level Auxiliary Feedwater Flow Rate Reactor Coolant System Subcooling Margin Monitor PORV Position Indicator - Limit Switches***

PORV Block Valve Position Indicator - Limit Switches Safety Valve Position Indicator - Acoustic Monitor Incore Thermocouples (Core Exit Thermocouples)

Reactor Coolant Inventory Tracking System (Reactor Vessel Level Indication)

Containment Sump Level Containment Water Level 2

2 2

2 2

2/Steam Generator 1/Steam Generator 2

1 1/Steam Generator*

1/Valve 1/Valve 2 Out of 3 Total 2/Core Quadrant One Train (3 channels/Train) 1~*

2'kkk*

Steam Generator Water Level Channels can be used as a substitute for the corresponding auxiliary feedwater flow rate channel instrument.

PRODAC 250 subcooling margin readout can be used as a substitute for the subcooling monitor instrument.

Acoustic monitoring of PORV position (1 channel per three valves

- headered discharge) can be used as a substitute for the PORV Indicator - Limit Switches instruments.

~* The requirements for these instruments will become effective after the level transmitters are modified or replaced and become operational.

The schedule for modification or replacement of the transmitters is described in the Bases.

COOK NUCLEAR PLANT - UNIT 2 3/4 3-46 Amendment No. 4C, 4%