ATTACHMENT 2 e
TABLE 3.6-1 ccontinuedl CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds\\
- o.
FEEDWATER ISOLATION (rvo-re 1.)
l
- l. 11 BF 19#
Main Feedwater Isolation S9 sec.
- 2.
12 BF 19#
Main Feedwater Isolation S9 Sec.
- 3.
13 BF 19#
Main Feedwater Isolation S9 Sec.
- 4.
14 BF 19#
Main Feedwater Isolation S9 Sec.
- s.
1.1 BF 40#
Main Feedwater Isolation S9 Sec.
- 6.
12 BF 40#
Main Feedwater Isolation S9 Sec.
- 7.
13 BF 40#
Main Feedwater Isolation S9 Sec.
- a.
14 BF 40#
Main Feedwater Isolation S9 sec.
E
- STEAM GENERATOR BLOWDOWN ISOLATION
- 1.
11 GB 4#
Steam Generator Blowdown SlO Sec.
- 2.
12 GB 4#
Steam Generator Blowdown SlO Sec.
- 3.
13 GB 4#
Steam Generator Blowdown SlO Sec.
- 4.
14 GB 4#
Steam Generator Blowdown SlO Sec.
- s.
11 SS 94#
SG Blowdown Sampling SlO Sec.
- 6.
12 SS 94#
SG Blowdown Sampling SlO Sec.
- 7.
13 SS 94#
SG Slowdown Sampling SlO Sec.
- 8.
14 SS 94#
SG Blowdown Sampling SlO sec.
F. CONTAINMENT PURGE AND PRESSURE -
VACUUM RELIEF
- ~
- l.
1 vc 1
Purge Supply S2 sec.
~.
1 vc 2
Purge Supply S2 sec.
- 3.
l vc 3
Purge Exhaust S2 Sec.
.. 4.
l vc 4
Purge Exhaust S2 sec.
- s.
l vc 5*
Pressure - Vacuum Relief S2 sec.
- 6.
1 vc 6*
Pressure - Vacuum Relief S2 sec.
SALEM - UNIT 1 3/4 6-15 Amendmant No: 132
,~3~0-;;2~1:-:2=-:0::.-:0-1_4_9_30 ----
PDR ADocu
. 202 p
~ 05000272 I
- PDR
ATTACHMENT 2 TABLE 3.6-1 VALVE NUMBER
- 13.
1 WR 81
- 14. 11 CA 360
- 15. 12 CA 360 CONTAINMENT ISOLAT FUNCTION Pressurizer Relief Tk.-Primary Water Conn.
Instrument Air Supply Instrument Air ISOLATION TIME (Seconds)
Not Applicable Not Applicable Not Applicable Note 1: For the 11 through 14 BF19s and 11 through 14 BF40s a partial stroke test to ensure that the valve is free of any stem binding is acceptable to satisfy the requirement of surveillance 4.6.3.1.1 following a packing gland adjustment up to the manufacturer recommended value.
A full stroke test shall be conducted the first time the Unit enters operational MODE 3 following the packing gland adjustment.
- May be-opened on an intermittent basis under administrative control.
- Not subject to Type C leakage tests.
- Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.
+Normally closed motor operated containment isolation valve.
Valve opens on Phase B isolation
- SALEM - UNIT 1 3/4 6-17a Amendmen't;_ -No
- 9 2*
ATTACHMENT 2 e
TABLE 3.6-1 (Contd. I CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME <Seconds)
- o.
FEEDWATER ISOLATION (NO'lE 1.)
- 1.
21 BF 19#
Main Feedwater Isolation S9 sec.
- 2.
22 BF 19#
Main Feedwater I"solation S9 Sec.
- 3.
23 BF 19#
Main Feedwater I.solation S9 Sec.
- 4.
24 BF 19#
Main Feedwater Isolation S9 Sec.
- s.
21 BF 40#
Main Feedwater Isolation S9 Sec.
- 6.
22 BF 40#
Main Feedwater Isolation S9 Sec.
- 7.
23 BF 40#
Main Feedwater Isolation S9 Sec.
- a.
24 BF 40#
Main Feedwater Isolation S9 Sec.
E
- STEAM GENERATOR SLOWDOWN ISOLATION
- 1.
21 GB 4#
Steam Generator Slowdown
- SlO Sec.
- 2.
22 GB 4#
Steam Generator Slowdown
- SlO Sec.
- 3.
23 GB 4#
Steam Generator Blowdown
- SlO Sec.
- 4.
24 CB 4#
Steam Generator Blowdown
- SlO Sec.
- s.
21 SS 94#
SG Blowdown Sampling
- SlO Sec.
- 6.
22 SS 94#
SG Blowdown Sampling
- SlO sec.
- 7.
23 SS 94#
SG Slowdown Sampling
- SlO Sec.
- a.
24 SS 94#
SG Slowdown Sampling
- SlO Sec.*
F. CONTAINMENT PURGE AND PRESSURE -
VACUUM RELIEF
- l.
2 vc l
Purge Supply
- ~
S2 sec.
- 2.
2 vc. 2.
Purge Supply
- S2 Sec.
- 3.
2 vc 3
Purge Exhaust
- S2 Sec.
- 4.
2 vc 4
Purge Exhaust
- S2 Sec.
- s.
2 vc 5*
Pressure - Vacuum Relief
- S2 Sec.
- 6.
2 vc 6*
Pressure - Vacuum Relief
- S2 Sec.
SALEM -
UNIT 2 3/4 6-17 Amendl!!ent No. lll
1e ATTACHMENT 2
TABLE 3.6-1 (Contd~
CONTAINMENT.ISOLATION VALVES VAL VE NUMBER..
FUNCTION ISOLATION TIME (Seconds)*.
H.
CHECK (Contd.)
- 13. 2 WR 81 Pressurizer Rel~ef Tk.-Primary Water Conn.
Not Applicable_
- 14.
- 15.
21 CA 360 22 CA 360 Instrument Air Supply Instrument Air Not Applicable Not Applicable Note 1: For the 21 through 24 BF19s and 21 through 24 BF40s a partial stroke test to ensure that the valve is free of any s~em binding is acceptable to satisfy the requirement of surveillance 4.6.3.1 following a packing gland adjustment up to the manufacturer recdm~ended value.
A full stroke test shall be conducted the first time the Unit enters operational MODE 3 following the packing gland adjustment.
- May be opened on an intermittent basis under administrative contt-.ffg.
)
- Not subject to Type C leakage tests.
- Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.
+ Normally closed motor operated containment isolation valve.
Valves open on Phase B isolation
- SALEM - UNIT 2 3/4. 6-20 Amendment No. 67