ATTACHMENT 2 e

TABLE 3.6-1 ccontinuedl CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds\\

o.

FEEDWATER ISOLATION (rvo-re 1.)

l

l. 11 BF 19#

Main Feedwater Isolation S9 sec.

2.

12 BF 19#

Main Feedwater Isolation S9 Sec.

3.

13 BF 19#

Main Feedwater Isolation S9 Sec.

4.

14 BF 19#

Main Feedwater Isolation S9 Sec.

s.

1.1 BF 40#

Main Feedwater Isolation S9 Sec.

6.

12 BF 40#

Main Feedwater Isolation S9 Sec.

7.

13 BF 40#

Main Feedwater Isolation S9 Sec.

a.

14 BF 40#

Main Feedwater Isolation S9 sec.

E

1.

11 GB 4#

Steam Generator Blowdown SlO Sec.

2.

12 GB 4#

Steam Generator Blowdown SlO Sec.

3.

13 GB 4#

Steam Generator Blowdown SlO Sec.

4.

14 GB 4#

Steam Generator Blowdown SlO Sec.

s.

11 SS 94#

SG Blowdown Sampling SlO Sec.

6.

12 SS 94#

SG Blowdown Sampling SlO Sec.

7.

13 SS 94#

SG Slowdown Sampling SlO Sec.

8.

14 SS 94#

SG Blowdown Sampling SlO sec.

F. CONTAINMENT PURGE AND PRESSURE -

VACUUM RELIEF

  • ~
l.

1 vc 1

Purge Supply S2 sec.

~.

1 vc 2

Purge Supply S2 sec.

3.

l vc 3

Purge Exhaust S2 Sec.

.. 4.

l vc 4

Purge Exhaust S2 sec.

s.

l vc 5*

Pressure - Vacuum Relief S2 sec.

6.

1 vc 6*

Pressure - Vacuum Relief S2 sec.

SALEM - UNIT 1 3/4 6-15 Amendmant No: 132

,~3~0-;;2~1:-:2=-:0::.-:0-1_4_9_30 ----

PDR ADocu

. 202 p

~ 05000272 I

  • PDR

ATTACHMENT 2 TABLE 3.6-1 VALVE NUMBER

13.

1 WR 81

14. 11 CA 360
15. 12 CA 360 CONTAINMENT ISOLAT FUNCTION Pressurizer Relief Tk.-Primary Water Conn.

Instrument Air Supply Instrument Air ISOLATION TIME (Seconds)

Not Applicable Not Applicable Not Applicable Note 1: For the 11 through 14 BF19s and 11 through 14 BF40s a partial stroke test to ensure that the valve is free of any stem binding is acceptable to satisfy the requirement of surveillance 4.6.3.1.1 following a packing gland adjustment up to the manufacturer recommended value.

A full stroke test shall be conducted the first time the Unit enters operational MODE 3 following the packing gland adjustment.

  • May be-opened on an intermittent basis under administrative control.
  1. Not subject to Type C leakage tests.
    1. Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.

+Normally closed motor operated containment isolation valve.

Valve opens on Phase B isolation

  • SALEM - UNIT 1 3/4 6-17a Amendmen't;_ -No
  • 9 2*

ATTACHMENT 2 e

TABLE 3.6-1 (Contd. I CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME <Seconds)

o.

FEEDWATER ISOLATION (NO'lE 1.)

1.

21 BF 19#

Main Feedwater Isolation S9 sec.

2.

22 BF 19#

Main Feedwater I"solation S9 Sec.

3.

23 BF 19#

Main Feedwater I.solation S9 Sec.

4.

24 BF 19#

Main Feedwater Isolation S9 Sec.

s.

21 BF 40#

Main Feedwater Isolation S9 Sec.

6.

22 BF 40#

Main Feedwater Isolation S9 Sec.

7.

23 BF 40#

Main Feedwater Isolation S9 Sec.

a.

24 BF 40#

Main Feedwater Isolation S9 Sec.

E

1.

21 GB 4#

Steam Generator Slowdown

SlO Sec.
2.

22 GB 4#

Steam Generator Slowdown

SlO Sec.
3.

23 GB 4#

Steam Generator Blowdown

SlO Sec.
4.

24 CB 4#

Steam Generator Blowdown

SlO Sec.
s.

21 SS 94#

SG Blowdown Sampling

SlO Sec.
6.

22 SS 94#

SG Blowdown Sampling

SlO sec.
7.

23 SS 94#

SG Slowdown Sampling

SlO Sec.
a.

24 SS 94#

SG Slowdown Sampling

SlO Sec.*

F. CONTAINMENT PURGE AND PRESSURE -

VACUUM RELIEF

l.

2 vc l

Purge Supply

  • ~

S2 sec.

2.

2 vc. 2.

Purge Supply

S2 Sec.
3.

2 vc 3

Purge Exhaust

S2 Sec.
4.

2 vc 4

Purge Exhaust

S2 Sec.
s.

2 vc 5*

Pressure - Vacuum Relief

S2 Sec.
6.

2 vc 6*

Pressure - Vacuum Relief

S2 Sec.

SALEM -

UNIT 2 3/4 6-17 Amendl!!ent No. lll

1e ATTACHMENT 2

TABLE 3.6-1 (Contd~

CONTAINMENT.ISOLATION VALVES VAL VE NUMBER..

FUNCTION ISOLATION TIME (Seconds)*.

H.

CHECK (Contd.)

13. 2 WR 81 Pressurizer Rel~ef Tk.-Primary Water Conn.

Not Applicable_

14.
15.

21 CA 360 22 CA 360 Instrument Air Supply Instrument Air Not Applicable Not Applicable Note 1: For the 21 through 24 BF19s and 21 through 24 BF40s a partial stroke test to ensure that the valve is free of any s~em binding is acceptable to satisfy the requirement of surveillance 4.6.3.1 following a packing gland adjustment up to the manufacturer recdm~ended value.

A full stroke test shall be conducted the first time the Unit enters operational MODE 3 following the packing gland adjustment.

  • May be opened on an intermittent basis under administrative contt-.ffg.

)

  1. Not subject to Type C leakage tests.
    1. Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.

+ Normally closed motor operated containment isolation valve.

Valves open on Phase B isolation