ML18096B256

From kanterella
Jump to navigation Jump to search
Proposed TS Table 3.6-1, Containment Isolation Valves.
ML18096B256
Person / Time
Site: Salem  PSEG icon.png
Issue date: 02/02/1993
From:
Public Service Enterprise Group
To:
Shared Package
ML18096B255 List:
References
NUDOCS 9302120014
Download: ML18096B256 (4)


Text

ATTACHMENT 2 e

TABLE 3.6-1 ccontinuedl

  • VALVE NUMBER CONTAINMENT ISOLATION VALVES FUNCTION ISOLATION TIME (Seconds\
o. FEEDWATER ISOLATION (rvo-re 1.) l
l. 11 BF 19# Main Feedwater Isolation S9 sec.
2. 12 BF 19# Main Feedwater Isolation S9 Sec.
3. 13 BF 19# Main Feedwater Isolation S9 Sec.
4. 14 BF 19# Main Feedwater Isolation S9 Sec.
s. 1.1 BF 40# Main Feedwater Isolation S9 Sec.
6. 12 BF 40# Main Feedwater Isolation S9 Sec.
7. 13 BF 40# Main Feedwater Isolation S9 Sec.
a. 14 BF 40# Main Feedwater Isolation S9 sec.

E* STEAM GENERATOR BLOWDOWN ISOLATION

  • 1.

2.

3.

11 GB 4#

12 GB 4#

13 GB 4#

Steam Generator Blowdown Steam Generator Blowdown Steam Generator Blowdown SlO Sec.

SlO Sec.

SlO Sec.

4. 14 GB 4# Steam Generator Blowdown SlO Sec.
s. 11 SS 94# SG Blowdown Sampling SlO Sec.
6. 12 SS 94# SG Blowdown Sampling SlO Sec.
7. 13 SS 94# SG Slowdown Sampling SlO Sec.
8. 14 SS 94# SG Blowdown Sampling SlO sec.

F. CONTAINMENT PURGE AND PRESSURE - VACUUM RELIEF

  • ~
l. 1 vc 1 Purge Supply S2 sec.

~. 1 vc 2 Purge Supply S2 sec.

3. l vc 3 Purge Exhaust S2 Sec.

.. 4. l vc 4 Purge Exhaust S2 sec.

s. l vc Pressure - Vacuum Relief S2 sec.

5*

6. 1 vc 6* Pressure - Vacuum Relief S2 sec.

SALEM - UNIT 1 3/4 6-15 Amendmant No: 132

,~3~0-;;2~1:-:2=-:0::.-:0-1_4_9_30 - - - -

' PDR ADocu . 202 ----...,

p ~ 05000272 I

  • PDR

ATTACHMENT 2 TABLE 3.6-1

  • . CONTAINMENT ISOLAT VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)
14. 11 CA 360
15. 12 CA 360 Pressurizer Relief Tk.-Primary Water Conn.

Instrument Air Supply Instrument Air Not Applicable Not Applicable Not Applicable Note 1: For the 11 through 14 BF19s and 11 through 14 BF40s a partial stroke test to ensure that the valve is free of any stem binding is acceptable to satisfy the requirement of surveillance 4.6.3.1.1 following a packing gland adjustment up to the manufacturer recommended value. A full stroke test shall be conducted the first time the Unit enters operational MODE 3 following the packing gland adjustment.

  • May be- opened on an intermittent basis under administrative control.
  1. Not subject to Type C leakage tests.
    1. Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.

+Normally closed motor operated containment isolation valve. Valve opens on Phase B isolation *

  • SALEM - UNIT 1 3/4 6-17a Amendmen't;_ -No
  • 9 2*

ATTACHMENT 2 e

TABLE 3.6-1 (Contd. I

  • VALVE NUMBER CONTAINMENT ISOLATION VALVES FUNCTION ISOLATION TIME <Seconds)
o. FEEDWATER ISOLATION (NO'lE 1.)
1. 21 BF 19# Main Feedwater Isolation S9 sec.
2. 22 BF 19# Main Feedwater I"solation S9 Sec.
3. 23 BF 19# Main Feedwater I.solation S9 Sec.
4. 24 BF 19# Main Feedwater Isolation S9 Sec.
s. 21 BF 40# Main Feedwater Isolation S9 Sec.
6. 22 BF 40# Main Feedwater Isolation S9 Sec.
7. 23 BF 40# Main Feedwater Isolation S9 Sec.
a. 24 BF 40# Main Feedwater Isolation S9 Sec.

E* STEAM GENERATOR SLOWDOWN ISOLATION

  • 1.

2.

3.

4.

21 GB 4#

22 GB 4#

23 GB 4#

24 CB 4#

Steam Generator Slowdown Steam Generator Slowdown Steam Generator Blowdown Steam Generator Blowdown

SlO Sec.
SlO Sec.
SlO Sec.
SlO Sec.
s. 21 SS 94# SG Blowdown Sampling :SlO Sec.
6. 22 SS 94# SG Blowdown Sampling :SlO sec.
7. 23 SS 94# SG Slowdown Sampling :SlO Sec.
a. 24 SS 94# SG Slowdown Sampling :SlO Sec.*

F. CONTAINMENT PURGE AND PRESSURE - VACUUM RELIEF

l. 2 vc l Purge Supply *~ S2 sec.
2. 2 vc. 2. Purge Supply :S2 Sec.
3. 2 vc 3 Purge Exhaust :S2 Sec.
4. 2 vc 4 Purge Exhaust :S2 Sec.
s. 2 vc 5* Pressure - Vacuum Relief :S2 Sec.
6. 2 vc 6* Pressure - Vacuum Relief :S2 Sec.
  • SALEM - UNIT 2 3/4 6-17 Amendl!!ent No. lll

ATTACHMENT 2

.,, . ' . TABLE 3.6-1 (Contd~

CONTAINMENT.ISOLATION VALVES VALVE NUMBER . . FUNCTION ISOLATION TIME (Seconds)*.

H. CHECK (Contd.)

13. 2 WR 81 Pressurizer Rel~ef Tk.-Primary Water Not Applicable_

Conn.

14. 21 CA 360 Instrument Air Supply Not Applicable
15. 22 CA 360 Instrument Air Not Applicable 1e Note 1: For the 21 through 24 BF19s and 21 through 24 BF40s a partial stroke test to ensure that the valve is free of any s~em binding is acceptable to satisfy the requirement of surveillance 4.6.3.1 following a packing gland adjustment up to the manufacturer recdm~ended value. A full stroke test shall be conducted the first time the Unit enters operational MODE 3 following the packing gland adjustment.
  • May be opened on an intermittent basis under administrative contt-.ffg. )
  1. Not subject to Type C leakage tests.
    1. Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.

+ Normally closed motor operated containment isolation valve. Valves open on Phase B isolation *

  • SALEM - UNIT 2 3/4. 6-20 Amendment No. 67