ML20044G508

From kanterella
Jump to navigation Jump to search
Proposed TS Table 3.2.F Re Surveillance Instrumentation Re Control Rod Position & Neutron Monitoring
ML20044G508
Person / Time
Site: Peach Bottom  
Issue date: 05/24/1993
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20044G507 List:
References
NUDOCS 9306030221
Download: ML20044G508 (2)


Text

_ _ _ _ _ _.

t-

. TABLE 3.2.F (Cont'd) - SURVEILLANCE INSTRUMENTATION

  • ~,.

Minimum No.

of Operable-Type Indication Instrument Item' Channels Parameter Instrument and Range Action

  • 11 2

Suppression Chamber LR-8(9)123A,B Recorder 1-21 ft.

(10) (11)

Water Level (wide range) 12 1

Control Rod Position N/A 28 Volt Indicating )

Lights-

)

(1) (2) (3) (4)

)

13 1

Neutron Monitoring N/A SRM, IRM, LPRM,

)

0-100%

)

'14 1

Safety-Relief Valve P0AM-2(3)-2-71A-L Acoustic or (5)

Position Indication TE-2(3)-2-113A-L Thermocouple 15 2

Drywell High RR-8(9)103A,B Recorder 4-

-Range Radiation

1-1E(+8) R/hr

.(7) i

.l Monitors

'16

'l Main' Stack High Range RR-7127 (Green Pen)

Recorder Radiation Monitor

-1.4E(-2).to 1.4E(+4)uci/cc (7) 17 1

Reactor Building Roof RR-7127 (Red Pen U/2)

Recorder Vent High Range Radiation RR-7127 (Blue Pen'U/3).

1.4E(-2) to 1.4E(+4)uCi/cc.

(7) 4 Monitor 18 2

. Drywell Hydrogen 3AC872, 3BC872.

Analyzer and Recorder (1) (2) (3).

Concentration Analyzer XR-90411A,-XR-90411B 0-30% volume-and Monitor

  • ' Notes for Table 3.2.F appear on pages 78 and 78a.

7 w

-9306030221 930524 PDR ADOCK 05000277 I

P PDR

= --------

~

a

'l Unit 3 j

l

(

PBAPS l

SURVEILLANCE REQUIREMENTS LIMITING CONDITION FOR OPERATION 4.7.A.6 (Cont'd)-

3.7.A.6.cL(Cont'd)

With no channels c.

The analyzers shall be -

.l tested for channel check l

operable to monitor once per month and shall drywell oxygen have channel calibration

concentration or no channels operable to using bottled gas once
per 3 months. The-monitor torus oxygen _

atmospheric analyzing concentration, restore the inoperable system shall be channel (s) to operable functionally tested once i

status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> per operating cycle in -

or be in at least Hot conjunction with the.

Shutdown within the next specification 4.7.A.6.a.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

1 d.

Technical Specification requirements for hydrogen are detailed separately in Table 3.2.F/4.?.F.

i e.

A 30 psig limit is the maximum containment repressurization allowable using the CAD system. Venting via the SBGT system to this stack must be initiated i

at 30 psig following the initial peak pressure at 49.1 psig.

I i

-173-t l'

l k

-