. TABLE 3.2.F (Cont'd) - SURVEILLANCE INSTRUMENTATION
- ~,.
Minimum No.
of Operable-Type Indication Instrument Item' Channels Parameter Instrument and Range Action
- 11 2
Suppression Chamber LR-8(9)123A,B Recorder 1-21 ft.
(10) (11)
Water Level (wide range) 12 1
Control Rod Position N/A 28 Volt Indicating )
Lights-
)
(1) (2) (3) (4)
)
13 1
Neutron Monitoring N/A SRM, IRM, LPRM,
)
0-100%
)
'14 1
Safety-Relief Valve P0AM-2(3)-2-71A-L Acoustic or (5)
Position Indication TE-2(3)-2-113A-L Thermocouple 15 2
Drywell High RR-8(9)103A,B Recorder 4-
-Range Radiation
- 1-1E(+8) R/hr
.(7) i
.l Monitors
'16
'l Main' Stack High Range RR-7127 (Green Pen)
Recorder Radiation Monitor
-1.4E(-2).to 1.4E(+4)uci/cc (7) 17 1
Reactor Building Roof RR-7127 (Red Pen U/2)
Recorder Vent High Range Radiation RR-7127 (Blue Pen'U/3).
1.4E(-2) to 1.4E(+4)uCi/cc.
(7) 4 Monitor 18 2
. Drywell Hydrogen 3AC872, 3BC872.
Analyzer and Recorder (1) (2) (3).
Concentration Analyzer XR-90411A,-XR-90411B 0-30% volume-and Monitor
- ' Notes for Table 3.2.F appear on pages 78 and 78a.
7 w
-9306030221 930524 PDR ADOCK 05000277 I
P PDR
= --------
~
a
'l Unit 3 j
l
(
PBAPS l
SURVEILLANCE REQUIREMENTS LIMITING CONDITION FOR OPERATION 4.7.A.6 (Cont'd)-
3.7.A.6.cL(Cont'd)
With no channels c.
The analyzers shall be -
.l tested for channel check l
operable to monitor once per month and shall drywell oxygen have channel calibration
- concentration or no channels operable to using bottled gas once
- per 3 months. The-monitor torus oxygen _
atmospheric analyzing concentration, restore the inoperable system shall be channel (s) to operable functionally tested once i
status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> per operating cycle in -
or be in at least Hot conjunction with the.
Shutdown within the next specification 4.7.A.6.a.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
1 d.
Technical Specification requirements for hydrogen are detailed separately in Table 3.2.F/4.?.F.
i e.
A 30 psig limit is the maximum containment repressurization allowable using the CAD system. Venting via the SBGT system to this stack must be initiated i
at 30 psig following the initial peak pressure at 49.1 psig.