ML20044G508

From kanterella
Jump to navigation Jump to search
Proposed TS Table 3.2.F Re Surveillance Instrumentation Re Control Rod Position & Neutron Monitoring
ML20044G508
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/24/1993
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20044G507 List:
References
NUDOCS 9306030221
Download: ML20044G508 (2)


Text

_ _ _ _ _ _ . . _ _ _ _ _ _ _ _ - _ _ _ _ _ _

t-

  • ~,.

. TABLE 3.2.F (Cont'd) - SURVEILLANCE INSTRUMENTATION ,

Minimum No.

  • of Operable- Type Instrument Indication Instrument and Range Action
  • Item' Channels Parameter 2 Suppression Chamber LR-8(9)123A,B Recorder 1-21 ft. (10) (11)

. 11 Water Level (wide range) 1 Control Rod Position N/A 28 Volt Indicating )

12 (1) (2) (3) (4)

Lights- )

> )

13 1 Neutron Monitoring N/A SRM, IRM, LPRM, ) .

0-100% ) ,

'14 1 Safety-Relief Valve P0AM-2(3)-2-71A-L Acoustic or (5)

Position Indication TE-2(3)-2-113A-L Thermocouple 2 Drywell High RR-8(9)103A,B Recorder

' i 15

1-1E(+8) R/hr

.(7) $,

4- -Range Radiation

.l' Monitors

'l Main' Stack High Range RR-7127 (Green Pen) Recorder

'16 Radiation Monitor -1.4E(-2).to 1.4E(+4)uci/cc (7) 1 Reactor Building Roof RR-7127 (Red Pen U/2) Recorder 17 (7) 4 Vent High Range Radiation RR-7127 (Blue Pen'U/3). 1.4E(-2) to 1.4E(+4)uCi/cc.

Monitor 18 2 . Drywell Hydrogen 3AC872, 3BC872. Analyzer and Recorder (1) (2) (3).

Concentration Analyzer XR-90411A,-XR-90411B 0-30% volume-and Monitor

  • ' Notes for Table 3.2.F appear on pages 78 and 78a.

7 w

-9306030221 930524 PDR ADOCK 05000277 P PDR

. _ _ _ _ _ _ . _ -- = -------- _ -- - -- - - - --- -- ~ ' -'

a

'l Unit 3 j

.. . l

( PBAPS l

SURVEILLANCE REQUIREMENTS ,

LIMITING CONDITION FOR OPERATION 3.7.A.6.cL(Cont'd) 4.7.A.6 (Cont'd)-

c. The analyzers shall be - .l With no channels operable to monitor tested for channel check l' once per month and shall drywell oxygen  :
concentration or no have channel calibration channels operable to using bottled gas once monitor torus oxygen _
per 3 months. The-concentration, restore atmospheric analyzing >

the inoperable system shall be ,

channel (s) to operable functionally tested once .!

i status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> per operating cycle in -  :

conjunction with the.

or be in at least Hot Shutdown within the next specification 4.7.A.6.a.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. 1  ;

d. Technical Specification requirements for hydrogen are detailed separately in Table -

3.2.F/4.?.F.

i

e. A 30 psig limit is the maximum containment repressurization allowable using the CAD system. Venting via the SBGT system to this ,

stack must be initiated i at 30 psig following the initial peak pressure at 49.1 psig.

I i

- -173-t l'

l k

. , , . ,