ML20125C266
| ML20125C266 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 12/08/1992 |
| From: | NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20125C264 | List: |
| References | |
| NUDOCS 9212110118 | |
| Download: ML20125C266 (2) | |
Text
-.
Docket No. 50-336-B14318 Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specification Engineered Safety Feature Actuation System Instrumentation Proposed Changed Page i
December 1992 p$k21{Qg $ o$o$
6 P
1
7 TABLE 3.3-3 (Continued) iACTION 3 - With one or-more channels inoperable, operation may continue provided the containment purge valves are maintained closed.
ACTION 4 - With the number of OPERABLE channels one less than the Minimum Number of Channels, place the inoperable channel in the bypassed condition and restore the channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. No other channels shall be removed from service for surveillance testing during this ACTION STATEMENT, k
MILLSTONE - UNIT 2 3/4 3-17
- 0074
)
.