Docket No. 50-421 u

B14213.

l-o Millstone Nuclear Power Station, Unit No. 3 Proposed Technical Specification Change Seismic Monitoring Instrumentation Measurement Range I

l-l l

September 1992 9209290287 920922 PDR ADOCK 05000423 p-PDR

. - =.

TABLE 3.3-7 SEISMIC MONITORING INSTRUMENTATION MINIMUM-MEASUREMENT INSTRUMENTS INSTRUMENTS AND SENSOR LOCATIQNji RANGE OPERABLE 1.

Triaxial _ Time-History Accelerographs

a. NBE20A-i 19 (5v/g) 1 Containment Mat. (-24'3")
b. NBE208 19 (Sv/g) 1 Containment Wall (40'5")
c. NBE21 19 (5v/g) 1 Emer, Generator Enclosure located on Mat in Diesel Fuel Oil Vault (4'6")
d. NBE22 19 (Sv/g) 1 Aux. Bldg. F-Line Wall Near The Charging Pumps Cooling Surge Tank (46'6")

2.

Triaxial Peak Accelerographs

a. P/Al 29 1

Containment Safety injection Accum. Tank (-4'7")

b. P/A2 29 1

Safety Injection Accum Disch.

Line (-22'10")

c. P/A3 i 19 1

Aux. Bldg. Charging Pumps Cooling Surge Tank (46'E ;

3a. Triaxial Seismic Trigger Horizontal

.01g 1*

(Control Room)

Vertical

.006g 1*

(Control Room) 3b. Triaxial Seismic Switch Horizontal

.09g 1**

(Control Room)

Vertical

.06g 1**

(Control Room) 4.

Triaxial Response-Spectrum Recorders

a. RSA-50 Spectrum Analyzer 1-32 Hz 1*

(Control Room)

Peak Acceleration in Gs (Max of Ig)

b. Self-Contained Recorder 0-30 Hz at i 29 1

Steam Generator Support-(51'4")

  • With reactor control room indicator.

This unit is activated by signals from l

the NBE20A Triaxial Accelerograph.

j

    • This unit is-activated by signals from the NBE20A Triaxial Accelerograph and is connected to an-annunciator in the reactor control room.

l MILLSTONE - UNIT 3 3/4 3-48 coes

-