cii TABLE 3.3-9
+
REMOTE SHUTDOWN MANITORING INSTRUMENTATION MINIMUM i
PEADOUT MEASUREMENT CHANNELS INSTRUMENT LOCATION FANGE OPERABLE 1.
Reactor Trip. Breaker CRD switchgear room-open-close 1 per trip breaker and Indication 124 foot elevation 1 per secondary trip breaker 2.
Reactor Coolant Remote shutdown panel 120-920*F 1 per loop Temperature - Th 3.
Reactor Coolant Pressure Remote shutdown panel 0-2500 psig 1
i 4.
Pressurizer Level Remote _ shutdown' panel 0-320" H O 1
2 5.
Steam Generator Pressure.
Remote shutdown panel 0-1200 psig 1 per steam generator 6.
Steam Generator Level Remote shutdown panel 0-100%
1 per steam generator 7.
Decay Heat'Remaval Remote shutdown panel 0-300*F 1 per cooler Temperature 8.
Motor Driven Emergency Intermediate' Building 0-2000 psig 1 per pump
.Feedwater Pressure 95 foot elevation 9.
Nuclear Services Closed
. Auxiliary Building 0-300 psig 1
Cycle Cooling Pumps 95 foot elevation Discharge Pressure
-10. Nuclear Services Closed Auxiliary Building C-250*F-1 per cooler Cycle Cooling' Cooler 95 foot elevation
. Outlet ~ Temperature 9212290270'921221 PDR-ADOCK 05000302:
P PDR CRYSTAL RIVER ' UNIT 3 3/4 3-35 Amendment No.-
.