ML20126E690

From kanterella
Jump to navigation Jump to search
Proposed TS Table 3.3-9, Remote Shutdown Monitoring Instrumentation
ML20126E690
Person / Time
Site: Crystal River 
Issue date: 12/21/1992
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20126E688 List:
References
NUDOCS 9212290270
Download: ML20126E690 (1)


Text

cii TABLE 3.3-9

+

REMOTE SHUTDOWN MANITORING INSTRUMENTATION MINIMUM i

PEADOUT MEASUREMENT CHANNELS INSTRUMENT LOCATION FANGE OPERABLE 1.

Reactor Trip. Breaker CRD switchgear room-open-close 1 per trip breaker and Indication 124 foot elevation 1 per secondary trip breaker 2.

Reactor Coolant Remote shutdown panel 120-920*F 1 per loop Temperature - Th 3.

Reactor Coolant Pressure Remote shutdown panel 0-2500 psig 1

i 4.

Pressurizer Level Remote _ shutdown' panel 0-320" H O 1

2 5.

Steam Generator Pressure.

Remote shutdown panel 0-1200 psig 1 per steam generator 6.

Steam Generator Level Remote shutdown panel 0-100%

1 per steam generator 7.

Decay Heat'Remaval Remote shutdown panel 0-300*F 1 per cooler Temperature 8.

Motor Driven Emergency Intermediate' Building 0-2000 psig 1 per pump

.Feedwater Pressure 95 foot elevation 9.

Nuclear Services Closed

. Auxiliary Building 0-300 psig 1

Cycle Cooling Pumps 95 foot elevation Discharge Pressure

-10. Nuclear Services Closed Auxiliary Building C-250*F-1 per cooler Cycle Cooling' Cooler 95 foot elevation

. Outlet ~ Temperature 9212290270'921221 PDR-ADOCK 05000302:

P PDR CRYSTAL RIVER ' UNIT 3 3/4 3-35 Amendment No.-

.