Proposed TS Table 3.5.1-1 Re Number of Channels Required to Be Operable
ML20128A327
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/26/1993
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20128A313 List:
References
NUDOCS 9302020190
Download: ML20128A327 (1)


Text

I Table 3.5.1-2 (cont'd)

28. With the number of OPERABLE channels one less than the minimum number of channels required to be OPERABLE:

'D'u m gg a.

If repairs are feasible, restore the inoperable channel to OPERABLE status within 7 days or be in na at least HOT SFfUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

o

>M go b.

If repair is not feasible without shutting down, operation may continue and a special report om pursuant to specification 6.12.5 shall be submitted to the NRC within 30 days following the 343 failure; describing the action taken, the cause of the inoperability, and the plans and scheduJes og for restoring the channel to OPERABLE status during the next scheduled refueling outage.

oo m @y 29. With the number of OPERABLE channels two less than the minimum channels required to be OPERABLE:

ts u o-wy a.

If repairs are feasible, restore at least one inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

If repair is not feasible without shutting down, operation may cortinue and a special report pursuant to specification 6.12.5 shall be submitted to the NRC within 30 days following the failure; describing the action taken, the cause of the inoperability, and the plans and schedules for restoring the channels to OPERABLE status during the next scheduled refueling outage.

30. With the number of OPERABLE Channels Itss than required by the Minimum Channels OPERABLE requirements, initiate the preplanned alternate method of monitoring the appropriate parameter (s), within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and:
1) either restore the inoperable Channel (s) to OPERABLE status within 7 days of the event, or
2) prepare and submit a Special Report to the Commission pursuant to Specification 6.12.5 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.

Anendment No. 25J 45h