Proposed TS Table 3.3-6, Radiation Monitoring Instrumentation
ML20115G290
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/21/1992
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20115G285 List:
References
NUDOCS 9210260079
Download: ML20115G290 (8)


Text

N Y

t e

Attachment A HPF-38-127 a

9210260079 921021 PDR ADOCK 050003B2 v

P PDR

3 l

~

.[< -

TABLE 3.3-6 y

l

j RADIATION MONITORING INSTRUMENTATION

~

A l.

E HINIMUM 1

I CHANNELS-APoLICABLE ALARM / TRIP MEASUREMENT i.

INST RisMENT OPERABLE MODES SETPOINT RANGE ACTION

. E Z

1.

AREA MONITORS F

a.

Fuel Storage Pool Area j

Fuel Handling Building 1

Yentilation System i

j

' Isolation 2

^*

-1 4

1 100 mR/h 10

- 10 mR/h 24

}

i'

b. Containment - Purge &

1/ train 1, 2, 3, 4 & ** 40 mR/h or 20 - 5x10 mR/h 25 5

Exhaust Isolation

< 2x background stichever is l

wD higher 1(

2.

PROCESS MONITORS w

j a.

Containernt' Atmosphe. a

1) ' Gaseous ~ Activity RCS Leakage Detection 1

1, 2, 3, & 4 Not Applicable 10

- 10 pCi/cc 23

-6

-I i

L.

2) Particulate Activity t

RCS Leakage Detection 1

1,2,3,44 Not Applicable 10 10-6 pCi/cc 23 b.-

Control Room Intake

-8

-2 Monitors

  • 1/ intake All MODES

$ 2x background 10

- 10 pCi/cc 26

{

ik

,c.

Steam Generator Bih R

Monitor 1

1, 2, 3, & 4

-< 10 pCi 'cc 10

- 10 pCi/cc 28

-3

-6

-1 g

3 d.

Component' Cooling Water

'i z-System 1/line All MODES

$ 10 pCi/cc 10

- 10 pCi/cc

-28

-4

-7

-2

?

g;

e. -. Component Cooling I

-4

-7

-2 I

Water System 1

All MODES

$ 10 pCi/cc 10

- 10 pCi/cc 2C s

  • With irradiated fuel in the storage pool.
    • During' CORE ALTERATIONS 'or movement of irradiated fuel within the containment.

i f

o,

. - ~ - - -

TABLE 4.3-3 6

i M

RADIATION HONilDRING INS 1RIIMENTATION $0RVElli At4CE REQtlIRLHtt4IS CI'ANNLL H0 DES FOR WillCil g

CilANNEL CilANNEL

!(1 FICTIONAL SURVEILLANCE INSTRIIMENT CllECK CALIBRATION TEST IS REQUIRED 1.

AREA HONI.10RS 3.

Fuel Storage Pool Area fuel Handling Building Ventilation System Isolation S

R It' b.

-Containment - Purge &

Exhaust Isolation H

1, 2, 3, 4 & *

  • 2.

PROCESS HONITORS a.

Containment Atmasphere i

1)

Gaseous Activity -

w RCS Leakage Detection S

R tt 1, 2, 3, & 4 2)

Particulate Activity -

w t

RCS Leakage Detection 5

R H

1, 2, 3, & 4 e

b.

Control Room Intake Monitors S

R tt Alt.1100E5 c.

Steam Generator Blowdown Monitor S

R H

1, 2, 3, & 4 d.

Lomponent Cooling Water System 5

R H

All H0 DES e.

Component Cooling Water System S

R All ft0DL$

  • With irradiated fuel in the storage-pool.

-~

TABLE 3.3-6 (Continued)

ACTION STATEMENTS ACTION 23 -

With the number of channels OPERABLE less than reouired by the Minimur Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.4.5.1.

l i

ACTION 24 -

With the number of cnannels OPERABLE less than reauired by the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.9.12.

l ACTION 25 -

With the number of channels OPERABLE less than reouired by the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.9.9.

ACTION 26 -

With the numoer of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> initiate and maintain operation of the control room emergency ventilation system in the recirculation mode of operation.

ACTION 27 -

With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirement, either restore the inoperable Channel (s) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or:

1.

Initiate the preplanned alternate method of monitoring the appropriate parameter (s), and 2.

If the monitor is not restored to OPERABLE status within 7 days after the failure, prepare and submit a Special Report to the Commission pursuant te Specification 6.9.2 within 14 aays following the event outlining the action taken, the cause of the inoperability and the plans and senedule for restoring the system to OPERABLE status.

ACTION 28 -

With ~the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirements, operation of the plant may continue for up to 30 dsys provided grab samnles are taken once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and these samples are analyzed for gross activity within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, t'

WATERFORD - UNIT 3 3/4 3-31

.. _.. ~. _ -.

F i

1 r

i Attachment B NPF-38-127-

!~

I l

l f

.c,---

a -

-., -, _ ~

,n,,

.r...,

,r-..

~i p

1 z.

l g.

TABLE 3.3-6 RADIATIOff MONITORING INSIRUMENIAllON

=

MINIMUM en CHANNELS APPLICABLE AIARM/lRIP MEAStiR[MENI INSTRUMENT OPERABLE MODES SETPOINI RANGE A.CIION Q.

1.

AREA MONITORS'-

. a.

Fuel Storage Pool Area Fuel Handling Building Ventilation System Isolation 2

< 100 mR/h 10

- 10 rR/h 24

_g 4

b. Containment.- Purge &

1/ train 1, 2, 3, 4 & ** 40 mR/h c.-

20 - 5x10 rJt/h 25 5

Exhaust Isolation 5 2x background whichever is w

higher w

2.

PROCESS MONITORS a.

Containment Atmosphere

-1) Gascous Activity 4

RCS Leakage Detection 1

1, 2, 3, & 4 Not Applicable 10 10 pCi/cc 23

-6

-1

.2) Particulate Activity RCS teakage Detection 1

1, 2, 3, & 4 Not Applicable 10

- 10 Ci/cc 23

-II

-6 b.

Control Room Intake Monitors 1/ intake All MODES

< 2x background 10

- 10 pCi/cc 26

~0

-2 5

. c.

Steam Generator Blowdown

-R-Monitor.

I 1, 2, 3, & 4 1 10 pCi/cc

- 10 pCi/cc 28

-3 6

-1 5,

d f.

Ed.

Compg'ent Cooling Water m-System MDNITORS A& B.

1/line All MODES

<-10 pCi/cc 10

- 10 pCi/cc 28-

-4

-7

-2 oh Component' Cooling AN II $? L $

e.

l

. Water /5ydstem' '

_4

_y

_g-Q~ll M)DE

^< 10 pCi/cc 10

- 10 pci/cc 28 1 --

REMOVE w A --

MONITOR A/B v

REMOVE' l

  • With irradiated fuel in the st.oran,na.al~

n TABLE 4.3-3

cy RADIAll0N MONIl0 RING INSIRUMENTATION SURVE11tAtiCE REQUIREMENIS 4

za o"

CilANNEL H0 DES FOR MilCli g

CilAtiNEL CilANNEL IU!iCTIONAL SURVEILLANCE INSTRUMENT CHECK CALIBRATIGN TEST IS REQUIRED k

1.

AREA MONITORS

-4.

a.

Fuel Storage Pool Area Fuel Handling Building Ventilation System Isolation 5

R H

b.

Containment - Purge &

Exhaust Isolation S

R H

1, 2, 3, 4 & *

  • 2.

PROCESS MONITORS a.

Containment Atmosphere y

1)

Gaseous Activity -

.RCS Leakage' Detection 5

R H

1, 2, 3, & 4 Yg 2)

Particulate Activity -

RCS Leakage Detection S

R H

1, 2, 3, & 4 b.

Control Room Intake Monitors S

R H

ALL HODES c.

Steam Generator Blowdown Monitor S

R H

t 2, 3, & 4 d.

C m onent Cooling Water MONITORS A L Bg 5

R H

ALL HODES REl'J0VE S

R H

ES 0 TR EMOVE

  • With irradiated feel in the storage pool.
    • During CORE ALTERATIONS _ or movement of irradiated fuel within the containment.

i

,ws e.., e

-s

TABLE 3.3-6 ("ontinued)

ACTION STATEMENTE ACTION 23 -

With the numoer of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.4.5.1.

ACTION 24 -

With the number of channels OPERABLE less than required by the Minimum Channels OPER48LE requirement, comply with the ACTION requirements of Specification 3.9.12.

ACTION 23 -

With the number of channels OPERABLE less than reouired by the Minimum Channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.9.9.

ACTION 2E -

With the number of channels OPERABLE less than reouired by the Minimum Channels OPERABLE requirement, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> initiate and mainttin operation of the control room emergency ventilation system in tne recirculation moce of operation.

ACTION 27 -

With the numoer of OPERABLE Channels less tna, required by the Minimum Channels OPERABLE requirement, either restore the inoperable Channel (s) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or:

1.

Initi, s preplanned alternate method of monitoring the appropt 6e parameter (s), and 2.

If the monitor is not restored to OPERABLE status within i

7 days after the failure, prepare and submit a Special Report to the Commission pursuant to Sotreification 6.9.2 within 14 viays following the event outlining the action taken, the cc'Jse of the inoperability and the pians and seneaule for restoring the system to OPERABLE s'atus.

ACTION 28 -

With the numoer of channels OPERABLE less snan required by the Minimum Channels OPERABLE requirements, operation of the plant may continue for up to 30 days proviced grao samoles are taken once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and these samples are analyzed for gross activity within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

IIf the monitor is not restored to OPERABLE status within 30 days af ter the f ailure, continue sampling and prepare and submit a Special Report to the Commission pursuant to ADD Specification 6.9.2 within 14 days outlining ite action taken, the cause of the inoperal (lity and the plans and schedule for restoring i ac system to OPERABLE status.

1 i

i WATERFORD - UNIT 3 3/4 3-31 l

.