Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Procedure CP.102 Re Normal Cooldown". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes  + (Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes)
  • ML20080N033  + (Procedure AD.NP.16, Nuclear Production Directive Emergency Procedure Generation Program)
  • 05000390/FIN-2011003-02  + (Procedure AOI-30.2 C.36, Fire Safe Shutdown Room 737-A1A, Non-feasible Operator Manual Action)
  • 05000390/FIN-2012002-01  + (Procedure AOI-30.2 C.36, Fire Safe Shutdown Room 737-A1A, NON-FEASIBLE Operator Manual Action)
  • ML20098G992  + (Procedure AP 0154, Post-Trip Review)
  • ML071770460  + (Procedure AP 05-005, Rev. 11A, Design, Implementation & Configuration Control of Modifications)
  • ML071770461  + (Procedure AP 05F-001, Rev. 3, Design Verification)
  • ML20235U046  + (Procedure AP.2.06, Validation of Emergency Operating Procedures)
  • ML20235U058  + (Procedure AP.2.07, Verification of Emergency Operating Procedures)
  • ML20215J264  + (Procedure AP.2.24, Emergency Operating Procedures Writers Guide)
  • ML20080G515  + (Procedure AP/1/A/5500/31, Estimate of Failed Fuel Based on I-131 Concentration)
  • ML20073R502  + (Procedure AP/O/A/5500/34, Actions Required for ATWS Event)
  • ML20080P586  + (Procedure AP/O/B/5500/34, Abnormal Procedure for Secondary Chemistry Parameters Out of Spec)
  • ML20236A856  + (Procedure AR 10-14/DLAR 1000.28, Medical Svcs Control & Recording Procedures for Exposure to Ionizing Radiation & Radioactive Matls)
  • ML023380004  + (Procedure Action Request, RPM 4.8.5-22B, OSC Assembly Bldg. 475 1st Floor)
  • 05000361/FIN-2013003-02  + (Procedure Adequacy for Responding to External Flooding Events)
  • ML20204H387  + (Procedure BAW-1875-A, B&W Owners Group Cavity Dosimetry Program)
  • ML18032A739  + (Procedure BFN 50 C 7100, Detailed Design Criteria for Structural Acceptance of Drywell Access Platforms)
  • ML20155H636  + (Procedure C.37, Atmospheric Dump Valve (Adv) Manual Loading Station Operation. Related Info Encl)
  • ML20204H752  + (Procedure CN-SF-020 Min Industrial Safety Stds for Chem- Nuclear Sys,Inc)
  • ML20031D547  + (Procedure CNF-7995-4, Control Rod Driveline Return to Feedwater Tie-In)
  • ML20031D534  + (Procedure CNF-F, Section Ff,Issue II, Mandatory Requirements for Post Weld Heat Treatment of Welds)
  • ML20031D559  + (Procedure CNF-F-FFB, Procedure for Electric Resistance Heat Treatment)
  • ML20031D517  + (Procedure CNF-FF,Issue I, General Procedure for Post Weld Heat Treatment)
  • ML20080S957  + (Procedure CNS-1301.00-2, Diesel Electric Generating Units)
  • ML20135H807  + (Procedure CP.104 Re Transient Occurrence That Leaves RCS Being Cooled by HPI Cooling)
  • ENS 44324  + (Procedure Change Initiated to Support Tsc Habitability Dose Calculation)
  • ML20128G931  + (Procedure Change Notice 01 to Rev 2 to 2IM-5.02-CND, Conduit & Conduit Support Design)
  • ML17300A780  + (Procedure Change Notice 1 to Rev 0 to Procedure 41AO-1ZZ54, Monitoring Reactor Vessel Inventory W/Reactor Vessel Level Monitoring Sys Inoperable)
  • ML20149D889  + (Procedure Change Notice 1 to Rev 1 to HPF-E2, Procedure for Installation & Documentation of Fire Alarms,Cardox Sys, Deluge Sys & Smoke Detectors, Revising Conduit Installation.Related Info Encl)
  • ML20126D554  + (Procedure Change Notice 1 to Rev 2 to Procedure QP 18.4, Scheduling of Site QA Audits)
  • ML20133C903  + (Procedure Change Notice PCN 0014/R1 to Rev 20 to Procedure QCP-VII-200,adding Paragraph 3.2.5 to Include Insp Criteria in Compliance W/Bechtel Spec 10466-C-122)
  • ML20127B979  + (Procedure Change Notice to Rev 17 to Procedure 200, Control of Welding Filler Matl)
  • ML20149D852  + (Procedure Change Notices 1-13 to Rev 1 to QCP-17, Quality Procedure for Initiation of Work)
  • ML20045B577  + (Procedure Change Request 1-RC-93-0016 to Rev 4 to Procedure 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual)
  • ML19254B026  + (Procedure Change Request 74-464 to Eliminate Procedure 1656 & Maintain 1302-5.24.Radiological Request 58)
  • ML20215M333  + (Procedure Change Request K-1 to WM-014, Operating Instructions for Loading & Unloading NUS-14-170 Series I Casks)
  • 05000334/FIN-2016002-01  + (Procedure Change Results in Failure to Maintain the Design Basis for the Service Water System)
  • ML18302A255  + (Procedure Change Summary Analysis and Revision 7 to FP-EP-PLAN-01, Offsite Nuclear Emergency Plan)
  • ML033090462  + (Procedure Change to Address SHPO Issues)
  • ML032730705  + (Procedure Change to Address SHPO Issues)
  • ML20202C655  + (Procedure Cnsi 9151-S1, Suppl to Docket 71-9151 for Chem-Nuclear Sys,Inc,Cns 14-170 Series III Type a Radwaste Shipping Cask (USA/9151/A))
  • ML20195F388  + (Procedure Cwr MC-8, Radiation & Beryllium Protection Manual)
  • 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation  + (Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation)
  • 05000382/LER-2020-003, Procedure Deficiency for MG Set Voltage Regulator Installation Results in a Reactor Trip  + (Procedure Deficiency for MG Set Voltage Regulator Installation Results in a Reactor Trip)
  • ML20033C323  + (Procedure Directions - Thorotrast)
  • ML20155H553  + (Procedure E.01, Immediate Actions)
  • ML20102B648  + (Procedure EA-062, Program for Completion of Engineering Assurance In-Depth Technical Audits,Millstone Unit 3 Project)
  • ML18038A011  + (Procedure EA-106, Program for Completion of Engineering Assurance In-Depth Technical Audits,Nine Mile Point 2 Project)
  • ML20154J322  + (Procedure EA-OR-003-S, Sequoyah Nuclear Plant - Unit 1 Design Baseline & Verification Program,Supplemental Engineering Assurance Oversight Review Rept)