Procedure E.01, Immediate Actions
ML20155H553
Person / Time
Site: Rancho Seco, 05000000
Issue date: 04/18/1985
From:
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To:
Shared Package
ML20155H556 List:
References
RTR-NUREG-1195 E.01, E.1, NUDOCS 8605160278
Download: ML20155H553 (1)


Text

__

a

/d30 > /M

,a I ti

)

04-18-85 l

Original WP0026F D-0058P E.01 IMMEDIATE ACTIONS Determine whether this is a reactor trip or a forced shutdown situation and proceed below.

r i

REACTOR TRIP PORCED SHUTDOWN l

1.

Manually trip the 1.

IP a tube rupture / leak has occurred as reactor.

indicated by main steam line or air

^

ejector off-gas or gland steam radiation monitor alarms. THEN go to SGTR E.06.

2.

Manually trip the 2.

If,a forced shutdown is required by turbine.

Technical Specifications or by other operating documents. &Iiutdown plant to required conditions per normal j

procedures, starting with OP B.4.

j Plant Shutdown and Cooldown.

3.

Reduce letdown to 40 gym.

4.

Immediately con-tinue with E.02.

e I

s s

?

-i 8605160278 860306 PDR ADOCK 05000312 S

PDR

(

EllD E.01-1, If ib s