Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13296A603 + (PM Change Davis Besse LRA 10/22/2013)
- ML13134A367 + (PM Change Letter)
- ML25142A024 + (PM Change Letter)
- ML13043A527 + (PM Change Letter - February 2013)
- ML021910713 + (PM Change Letter Dated 7/10/02 Addressed to Gregg R. Overbeck)
- ML12139A060 + (PM Change Letter May 2012)
- ML12292A636 + (PM Change for the License Renewal of Davis-Besse Nuclear Power Station, Unit 1)
- ML13123A175 + (PM Change for the Lr of Sequoyah Nuclear Plant, Units 1 and 2)
- ML043380210 + (PM Change letter-Effective November 22, 2004 Mr. S. Sands Is the PM for LaSalle, Units 1 and 2)
- ML19219A170 + (PM Meeting Attendance)
- ML19219A171 + (PM Meeting Summary)
- ML24236A046 + (PM Nuclear Power Plant - Project Manager Assignment Letter)
- ML063420149 + (PM Reassignment)
- ML081610711 + (PM Reassignment)
- ML042510131 + (PM Reassignment - Comar to Pascarelli)
- ML030270487 + (PM Reassignment - Effective 01/26/03 K. Jabbour Is Project Manager for Watts Bar)
- ML18024A740 + (PM Reassignment - Louisiana Energy Services, LLC)
- ML113540669 + (PM Reassignment Letter)
- ML072500149 + (PM Reassignment Letter)
- ML072210190 + (PM Reassignment Letter)
- ML053180382 + (PM Reassignment Letter)
- ML092120148 + (PM Reassignment Letter)
- ML022280260 + (PM Reassignment Letter - Effective 08/19/02, Mr. R. Subbaratnam Will Be Project Manager for Shearon Harris)
- ML16155A091 + (PM Reassignment Letter - Hope Creek Generating Station and Salem Nuclear Generating Station)
- ML24061A169 + (PM Reassignment Letter Farley March 2024)
- ML021330489 + (PM Reassignment Letter for Perry Nuclear Power Plant Unit 1)
- ML20100F545 + (PM Reassignment Letter from Michael Mahoney to Karen Cotton 04-26-2020)
- ML103160506 + (PM Reassignment Ltr)
- ML092120175 + (PM Reassignment Ltr)
- ML092120164 + (PM Reassignment Ltr)
- ML020740428 + (PM Reassignment letter- Effective 03/24/02 B. Mozafari Is Project Manager for Brunswick)
- ML18037A673 + (PM-0218-58480, Revision 0, Shutdown Capability of the NuScale Power Module)
- ML19045A306 + (PM-0219-64475-NP, Revision 0, Reactor Vessel Flange Tool (Rft) Design Plan and Schedule)
- ML20035D114 + (PM-0220-68162, Revision 0, ACRS Subcommittee Presentation: NuScale FSAR Chapter 3 - Protection Against Turbine Missiles)
- ML19329F065 + (PMF Near Midland Site, Submitted as Part of Amend 25 to PSAR)
- ML19329F064 + (PMF Near Midland Site, Submitted as Part of Amend 31 to PSAR)
- ML20349L086 + (PMP Isohyets Position 1 Hydromet 51 Savannah River Basin Above Site)
- ML20349L105 + (PMP Isohyets Position 1 Hydromet 52 Savannah River Basin Above Site)
- ML20349L095 + (PMP Isohyets Position 2 Hydromet 51 Savannah River Basin Above Site)
- ML20236U511 + (PN--75-055A:on 750728,during Rerun of Loss of Offsite Power Test,Expansion Joint in Service Cooling Water Line to a DG Developed Leak Which Sprayed Water Into DG Room.Cause of Expansion Joint Failure Being Investigated by Licensee)
- ML20236U106 + (PN-75-001:on 750307,ofc Was Notified of Fire on 750306 at Plant.Fire Resulted from Ignition of Box of CAD-WELD Ignitors Located on Scaffold Near Containment Liner. Inspector Will Be at Site IAW Existing Scheduled Insp)
- ML20236U026 + (PN-75-002-1:on 750314,NMSS Had Received Info from State of La That 27 Curie Ir-192 Radiography Source in Shielded Container Was Lost in Transit from Gamma Industries,Baton Rouge,La)
- ML20236T973 + (PN-75-002:on 750416,Region III Ofc Notified That Svc Water Pumphouse for Units 1 & 2 Has Settled 2.4 Inches at SE corner,4.3 Inches at SW corner,4.2 Inch in Nw Corner & 6.72 Inches at Ne Corner)
- ML20236U045 + (PN-75-003:on 750318,plant Was Operating & Conducting Initial Reactor Power Testing Program D EDG Experienced Failure W/Resultant Internal Explosion)
- ML20236U059 + (PN-75-004:on 750320,plant Was Operating at 100% of Full Power,Two Hydraulic Snubbers (Grinnell,Figure 200/201) Were Found Inoperable)
- ML20236U143 + (PN-75-007:on 750327,plant Reported to OI & OE That Small Areas of Millstone Point I Plant Were Contaminated Due to Problem W/Condensate to Boilers of Plant Heating Sys)
- ML20236U006 + (PN-75-008:on 750331,licensee Reported to Region I,Oie,That During Final Cleanup Effort at Unit 2,required by Prior Contamination of Condensate Steam Sys,Approx 2500 Gallons of Water Released from Sump Pit at Unit 2)
- ML20236U010 + (PN-75-009:on 750402,Region III Notified That Bus Fault Occurred at Kewaunee Nuclear Plant Main Auxiliary Transformer.Cause of Fault Not Yet Determined.Bus Fault Resulted in Trip of Generator)
- ML20236U015 + (PN-75-010:on 750414,Region II Notified by Licensee That Unplanned Release of Radioactive Liquid Occurred on 750413. No Apparent Threat to Health & Safety of Public Resulted. About 7400 Gallons of Water from SFP Released)
- ML20236U017 + (PN-75-011:on 750416,licensee Reported That Bomb Threat Called Into New York Daily News Newspaper,To Effect That Three Bombs Placed at Two Power Plants of Consolidated Edison Co.No Bombs Found)
- ML20236U018 + (PN-75-012:on 750416 & 750422,reactor Shutdown,For Problems Relating to Minor Sys Leakage That Contributed to High Iodine Releases from Reactor Bldg Vent.Both Shutdowns Required Sys de-pressurization)