PN-75-012:on 750416 & 750422,reactor Shutdown,For Problems Relating to Minor Sys Leakage That Contributed to High Iodine Releases from Reactor Bldg Vent.Both Shutdowns Required Sys de-pressurization
ML20236U018
Person / Time
Site: Pilgrim
Issue date: 04/25/1975
From: Jennifer Davis, Dreher F, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-75-012, PN-75-12, NUDOCS 9807290256
Download: ML20236U018 (1)


Text

_ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ - - _ _ _ _ - - - - - - - - _

PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE April 25, 1975

'ti-PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -- PN-12

y.,

Cy O

This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation _

and is basically all that is known by OIE staff as of 2:00 p.m.

on date of this notification.

IT SHOULD BE SPECIFICALLY NOTED THAT TEIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETER}f1NED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND E;FORCDIENT NOTIFICATION OF AN INCIDENT OR OCCURRE.NCE (BLUE S5 EET) SUBS 2QUF"TLY WILL BE ISSUED IF WARRANTED.

Facility: Pilgrim 1

' Boston Edison Company

Subject:

IODINE RELEASE RATE ROM REACTOR BUILDING VENT I

The reactor was shutdown on April 16, and on April 22, for problems relating to minor system leakage that contributed to high iodine re-leases from the reactor building vent (less than TS limits). Both shutdowns required system de-pressurization which results in increased I

iodine releases from the fuel and the clean up system. The increase in the iodine releases are in addition to normal high release rates due to poor fuel performance.

Mc The iodine release problem is not new and has received active attention over the last,several months. Design modifications have been already k

made and are presently being installed - charcoal filter additions.

The releases from the plant stack are low due to the augmented off gas systen and the stack height (dispersion factor).

Media interest is, expected due to the extended shutdown, expected to be for several more days, caused by release rates close to license limit.

The State has been and is being kept informed. No press release 1s planned.

Contact:

FADreher, IE x7261, HDThornburg, IE x7353, JGDavis, IE x7541 Distribution:

Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Co:::missioner Rowden G. F. Murphy, JCAE Commissioner Kennedy..

C. C. Ka= merer, CA L. V. Gossick, EDO D. F. Knuth, IE J. A. Harris, PA B. C. Rusche, NRR H. H. Brown, ISP K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted: P Bldg Nd[O ; E St 3.NO ; MD Bldg M.7 p.

/

~

9807290256 750425 i

PDR I&E I

PN-75-012 PDR PRELIMINARY NOTTFTCATTAV _ NOT TOD Vnu? v e nT em nn.m