Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19029A465 + (Letter Re Resolution Which Was Approved & Adopted by Township Committee of Township of Pennsville)
- ML050940303 + (Letter Re Revising the Technical Specifications to Add an Additional Member to the Nuclear and Radiation Safety Committee (Nrsc). It Is Proposed That Section 6.0.1.g, Be Modified as Listed)
- ML042390079 + (Letter Re Rhode Island Atomic Energy Commission Request to Change the License R-95 Surveillance Specification Concerning the Inspection of Core Components, from an Annual Inspection Cycle, to a Five Year Cycle)
- ML041040791 + (Letter Re San Luis Obispo Board of Supervisors Meeting. Informs That Request for NRC Participant Should Be Addressed to Karen D. Cyr & Charles E. Mullins)
- ML020850300 + (Letter Re Security Clearances for Access to Classified Information)
- ML020850102 + (Letter Re Security Clearances for Access to Classified Information)
- ML020840567 + (Letter Re Security Clearances for Access to Classified Information)
- ML020840545 + (Letter Re Security Clearances for Access to Classified Information)
- ML020840511 + (Letter Re Security Clearances for Access to Classified Information)
- ML020840463 + (Letter Re Security Clearances for Access to Classified Information to Key Licensee Staff at Nuclear Power Reactor Site)
- ML020840416 + (Letter Re Security Clearances for Access to Classified Information to Key Licensee Staff at Nuclear Power Reactor Site)
- ML020840309 + (Letter Re Security Clearances for Access to Classified Information to Licensee Staff at Nuclear Power Reactor Site)
- ML021010494 + (Letter Re Site-Specific Phase 2 Worksheets for Significance Determination Process, TAC No. MA6544)
- ML020450713 + (Letter Re Staff Decision Regarding Response to Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles,)
- ML19093B345 + (Letter Re Submission of Demonstration for Modifications to Non-Radiological Operating Tech Spec in Concurrence with VA State Water Control Board)
- ML051190339 + (Letter Re Submittal of Decommissioning Plan for the Plum Brook Reactor, Revision 4)
- ML011020234 + (Letter Re Supplemental Information Regarding Request for Schedular Exemption from 10 CFR 72.48 Point Beach Nuclear Plant, Unit 1 and 2)
- ML20287A352 + (Letter Re Termination of Reactor Oversight Process for Duane Arnold Energy Center and Commencement of Decommissioning Inspection Program)
- ML020250047 + (Letter Re USI A-46 Program (TAC No. M69471))
- ML19095A208 + (Letter Re VEPCOs License Revocation at Surry & North Anna for Repeated Improper Safety Actions, & Request for NRCs Response for Intended Actions)
- ML14336A645 + (Letter Re Views of the Parties Regarding Proposed Track 2 Scheduling Matters)
- ML022040210 + (Letter Re Withdrawal of Relief Request from 10 CFR 50.55a)
- ML13192A365 + (Letter Re. Dam Safety Inspection Report)
- ML23229A415 + (Letter Re., Species List Tennessee Ecological Services Field Office)
- ML19031C762 + (Letter Reactor Vessel Material Surveillance)
- ML18219D975 + (Letter Reactor Vessel Over-Pressurization Events)
- ML18348A868 + (Letter Reactor Vessel Overpressurization)
- ML18227D301 + (Letter Reactor Vessel Overpressurization Events)
- ML062930088 + (Letter Received on October 16, 2006, Regarding the Essential Fish Habitat for License Renewal of Oyster Creek Nuclear Generating Station)
- ML12340A400 + (Letter Receiving Palisades Controlled Documents)
- ML19029A834 + (Letter Recent Damage Done to the 28 Fuel Rod Assemblies)
- ML023080337 + (Letter Recommending Revalidation of Japanese Certificate of Approval No. J/119/B(U)F-85, Revision 1 for the Model No. JRF-90Y-950K Package)
- ML18348A706 + (Letter Reevaluation of Consequences of a Refueling Accident Inside the Containment)
- ML18219D943 + (Letter Referring Event Report on 8/20/1976, Furnishing Information on Liquid Release Made Without Gamma Spectrum Analysis on Sample Prior to Release)
- IR 05000249/1975005 + (Letter Referring to 02/20/1975 Inspection of Dresden Unit 3 - IE Inspection Report 05000249/1975005)
- ML17252B164 + (Letter Referring to 08/17/1974 Inspection of Dresden 3 - RO Inspection Report 05000249/1974010)
- IR 05000249/1974010 + (Letter Referring to 08/17/1974 Inspection of Dresden 3 - RO Inspection Report 05000249/1974010)
- ML17252B157 + (Letter Referring to 09/19/1975 Letter Informing of Steps Taken to Correct Items of Noncompliance Brought to Attention in 08/29/1975 Letter - Dresden Units 2 and 3)
- IR 05000240/1976020 + (Letter Referring to 09/29 and 09/30/1976 IE Inspection Report 05000240/1976020 Regarding Refueling Activities - Dresden Unit 3)
- ML18230A973 + (Letter Referring to 12/07/1973 Meeting Concerning Shearong Harris Nuclear Power Plant at the Council on Environmental Quality Offices)
- ML18018A905 + (Letter Referring to GE Report Mk II Containment Supporting Program Report NEDO-21297, Rev. 1, Dated March, 1978)
- ML18018B186 + (Letter Referring to Generic Letter 83-28 Concerning Required Actions Based on Generic Implications of Salem ATWS Events and Requesting That GE Provide a Response by April 15, 1986)
- IR 05000249/1976027 + (Letter Referring to Inspection No. 05000249/1976027 on 12/07-12/09/1976 Regarding the Review of High Energy Pipe Break and Impingement Restraints - Dresden Unit 3)
- ML17252B137 + (Letter Referring to Inspection Report 05000249/19760023 Concerning Review of Special UT Test Program for Feedwater Nozzles, Core Spray and Recirculation Bypass Inspection Results, In-Service Plan and Procedures - Dresden Unit 3)
- IR 05000249/1976007 + (Letter Referring to Inspection at Dresden Unit 3 - 05000249/1976007 Regarding an Off-Gas System Explosion on 04/29/1976)
- ML17037C284 + (Letter Referring to July 5, 1972 Letter Transmitting an Application and Enclosing an Affidavit of Services)
- L-77-317, Letter Referring to Letter Dated October 5, 1977 Concerning Indemnity Agreement to Policy No. MF-88 and Enclosing a Letter Dated February 24, 1977 and Attached Endorsement Nos. 12, 13 and 14 + (Letter Referring to Letter Dated October 5, 1977 Concerning Indemnity Agreement to Policy No. MF-88 and Enclosing a Letter Dated February 24, 1977 and Attached Endorsement Nos. 12, 13 and 14)
- ML17037C235 + (Letter Referring to October 26, 1973 Letter Concerning the HPCI System Status and Advising That the Off-Site Power Test Utilizing Energy from Other than the Normal Off-Site Supply Has Been Completed During the Spring 1974 Outage)
- ML17037C162 + (Letter Referring to Two Significant Matters Identified During the August 26 to 30, 1974 Inspection at Nine Mile Point-1 Reactor Facility)
- ML17037C248 + (Letter Referring to a July 26, 1973 Letter Submitting a Description of a Proposed Change to the Reactor Building Crane with a Redundant Hoist System and Advising That the Present Plan Is to Install the New System in July 1974)
- ML18088B061 + (Letter Referring to a Letter from Citizens United Against Radioactive Environment Concerning St. Lucie Unit 2 and the October Hearings Ordered by the NRC)