Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:Test/Inspection/Operating Procedure
MONTHYEARML18018A9612018-01-18018 January 2018 Preservice Inspection Plan ML18018B0521999-09-27027 September 1999 Third Inservice Inspection Interval ML17037C4711975-05-30030 May 1975 Letter Regarding the General Electric Development of a New Calculational Method for Determining Void Coefficients and Requesting That Niagara Mohawk Inform the Commission as to How the New Void Coefficients Will Be .. ML17037C2351974-06-26026 June 1974 Letter Referring to October 26, 1973 Letter Concerning the HPCI System Status and Advising That the Off-Site Power Test Utilizing Energy from Other than the Normal Off-Site Supply Has Been Completed During the Spring 1974 Outage ML17037C2391974-05-0808 May 1974 Letter Responding to a March 6, 1974 Letter Regarding Inspections and Submittal of Positive Reports When Defective Units Are Found ML17037C2401974-05-0606 May 1974 Letter Responding to the April 11, 1974 Letter Concerning a Change to the Facility Pursuant to Section 50.59 of the Commission'S Regulations and Advising Niagara Mohawk That a Description of the Change Including a Summary ... ML17037C2471974-01-25025 January 1974 Letter Responding to a December 5, 1973 Letter Requesting Certain Information Concerning the Reload Fuel and Advising That Niagara Mohawk Plans to Submit the Remaining Information by February 19, 1974 Except for the Second ... ML17037C3601972-08-0101 August 1972 Letter Informing the Commission That on Mary 21, 1972, During the Poison Curtain Removal Outage, the Main Steam Line Isolation Valves Were Leak Tested and Advising That Details of Tests, Calculations, and Procedures Are on File ML17037C1361971-12-15015 December 1971 Letter Advising That the Power Level of 1850 Mw(T) Was Achieved and Testing Was Performed During the Week of December 5, 1971 and That Comprehensive Reports Are in Preparation and Will Be Available for Review ML17037C3451971-09-0808 September 1971 Letter Requesting That Niagara Mohawk Obtain Measurements of Primary Coolant Samples Taken at a Frequency Consistent with Changing Operating Parameters and That a Representative Attend the Meeting on September 23, 1971 ML17037C3691971-03-12012 March 1971 Letter Responding to a February 11, 1971 Forwarding an ACRS Report Pertaining to the Request for an Increase from 1538 to 1850 Thermal Megawatts in the Licensed Power Level ML17037C3501970-06-19019 June 1970 Letter Authorizing the Return to Operation of Unit 1 in Accordance with Your Documented Program and Subject to Conditions Defined and Enclosing an ACRS Report Dated June 16, 1970 ML17037C1471969-08-0101 August 1969 Letter Regarding the Matter of Examination and Assurance of Adequate Quality for the Specific Service Application of Certain Components ML17037C1481968-12-31031 December 1968 Letter Concerning Stub Tube Post Hydro Inspection and Advising That Agreement on the Dye Test Procedures to Be Used with the Division of Compliance Has Been Reached 2018-01-18
[Table view] |
Text
AEC DIS'TION FOR PART 50 DOCKET MATE (TEMPORARY FOR/) CONTROL NO'102
\
PILE:~SQ3 PROA<: DATE OF DOC DATE REC'D LTR TWX RPT OTHER Niagara Mohawk Power Corp.
Syracuse, N.Y. 13202 6-26-74 7-5-74 R, R. Schneider TO: ORIG CC OTHER SENT AEC PDR X DE J, Skovholt 1 signed SENT LOCAL PDR X '
CLASS UNCLASS PROP INFO INPUT NO C S REC'D DOCKET NO:
50-220 DESCRXPTION: ENCLOSURES:
Ltr re their 10-26-74 ltr, adivsing that addi info concerning the HPCI system status will be submitted in their Semi-Annual Report in DO NOT REMOVE July 1974N ~ ~ ~ ~ ~ ~ ~
ACKNOWLZDGZD PLANT NAtfE: Nine Mile Point 0'1 FOR ACTION/INFORMATION 7-8>>74 GC BUTLER(L) SCHWENCER(L) ZIEMANN (L) REGAN(E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARK(L) STOLZ(L) DICKER(E) ~LEAR
'W/ Copies W/ Copies W/ Copies W/4 Copies Iv ill<% LA
~ ~~ ~ ~ ~ I IvnII~E<N (E}
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L) PURPLE (L) YOUNGBLOOD(E)
W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION G PILE TECH REVIEW DEN TON LIC ASST A/T IND C ~NDRIE GRIMES BRA3;TM./fN OGC, ROOM P-506A SCHROEOER GAMMILL DIGGS (L) SALTZMAN MJNTZXNG/STAFF MACCARY KASTNER GEARIN (L) B HURT CASE KNIGHT BALLARD GOULBOURNE (L) PLANS WIAMBUSSO PAWLICKI SPANGLER KREUTZER (E)
BOYD- ~MCDONALD SHAO LEE (L) CHAPiifAN MOORE (L) (BWR) S TELLO ENVIRO MAIGRET (L)
DUBE w/input DEYOUNG(L) (PWR) HOUSTON MULLER REED (E)
SKOVHOLT (L) DICKER E. COUPE NOVAK SERVICE (L) 4COLLER(L} ROSS KNIGHTON SHEPPARD (L) D. THOMPSON (2)
Pi COLLINS IPPOLITO YOUNGBLOOD SLATER (E) KLECKER DENXSE TEDESCO REGAN SMITH (L) EISENHUT gREQ OPR LONG PROJECT LDR JfEETS (L)
FTL'E & REGION(3) LAINAS WILLIAMS,(E)
MORRIS BENAROYA HARLESS WILSON (L)
STEELE VOLIkfER EXTERNAL DISTRXBUTION
~ -
LOCAL PDR Oswe o N.Y.
'DEC (ABERNATHY) (1) (2)(10}-NATIONAL LAB'S 1-PDR"SAN/LA/NY
- NSIC(BUCHANAN) 1-ASLBP(E/W Bldg,Rm 529} 1- LXBRARIAN 1 - ASLB 1-W. PENiNXNGTON, Rm F.-201 GT BROOK ffAVEN NAT. LAB P Ro DAVIS ('KEROJET NUCLEAR) 1-CONSULTANT'S 1-AG."fED(Ruth Gussman) 16 - CYS ACRS HOLDING NEfkfARK/BLUME/AGMBXAN Rif- B-127, GT.
1-GERALD ULRIKSON...ORNL Q-RD..MULLER..F-309 GT
'1-B & M SWINEBROAD, Rm E-201 GT
0
~ ~ C
~ x ~
t, t'
~ ~ ~ I~ ~ ~
~ ~ C
Regulatory Docket File NIAGARA MOHAWK POWER CORPORATION l~
NIAGARA ~+j MOHAWK 300 ERIE BOULEVARD WEST (r~l 3 I c g4 SYRACUSE. N, Y. 13202 June 26, 1974
~3IC3IOI ASSOC L~ ~,gg33a
Ãv. Donald J. Skovholt III@3!hCII Assistant Directoz for Reactor Operations <<iI qua@
Division of Reactoz'icensing United States Atomic Energy Commission Vashington, D.C. 20545 RE: DOCKET 50-220 LTR SCHNEIDER-SKOVHOLT OCTOBER 26, 1978 Deaz'. Skovholt:
In our'ctober 26, 2973 letter concerning the Hig~hessur'e. Coolant Injection (HPCI) System status bIe committed to the per'formance of an off-site poier test utilizing ener'gy from other than the Normal Off-site Supply.
I Ve ar'e pleased to inform you that the testing has been completed, qs committed, during the Spzing 2874 Refueling Outage.
As vas stated in the Octobez'978 lettez, vazious modifications had to be made to our Bennetts Bz'idge Hydr'o Electz'ic Station to pzevent possible damage to station components and to enhance the system reliability and pezfozmance. These modifications n)ere made pz'ior to conducting the test.
The results of the test have been r'evimed by both On-site and Off-site Revim Committees. They have concluded that all pre-operational r'equirements for the HPCI System have been completed and that this is a c los ed @terna A complete z'eport of the test and z'esults thereof vill be included in the July 1874 Semi-Annual Report.
Very truly your's, 4'nn R.R. Schneider i Vice President Electzic Oper'ations J~
TJD:
bar'c:
4<v2 J. O'Reilly a~i'PP RO; I' 3o
~ y ~
!~,r
~ I 1 t