ML13192A365

From kanterella
Jump to navigation Jump to search
Letter Re. Dam Safety Inspection Report
ML13192A365
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/18/2013
From: Martin R
Plant Licensing Branch II
To: Gatlin T
South Carolina Electric & Gas Co
Martin R 301-415-1493
Shared Package
ML13192A340 List:
References
Download: ML13192A365 (2)


Text

OffiCIAL IJSIi ONLY SIiNSITIVIi fliD, STATE, fOREIGN GO)!T.

CONTROLLED INFO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 July 18, 2013 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88, Mail Code 800 Jenkinsville, SC 29065

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 - DAM SAFETY INSPECTION REPORT

Dear Mr. Gatlin:

Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission. The enclosure contains the results of an inspection on April 19, 2013, of the service water pond dams at the Virgil C. Summer Nuclear Station, Unit No.1.

At FERC's request, the enclosure is not being made publicly available since it contains critical energy infrastructure information.

Docket No. 50-395

Enclosure:

Dam Safety Inspection Report cc w/o enclosure: Distribution via Listserv The enclosure transmitted herewith contains Security-Related information.

When separated from enclosure, this document is decontrolled.

Sincerely,

!I~J/~

Robert E. Martin, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICIAllJSE ONLY SENSITIVE fED, STATe, fOReiGN GOvr.

CONTROLLED INFO

OFFICIAL USE ONLY SENSITI'I-E FED, STATE, FOREIGN GO'lT.

CONTROLLED INFO July 18. 2013 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88. Mail Code 800 Jenkinsville, SC 29065

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 - DAM SAFETY INSPECTION REPORT

Dear Mr. Gatlin:

Enclosed is a copy of the Dam Safety Inspection Report prepared by the Federal Energy Regulatory Commission (FERC) for the U.S. Nuclear Regulatory Commission. The enclosure contains the results of an inspection on April 19, 2013. of the service water pond dams at the Virgil C. Summer Nuclear Station, Unit No.1.

At FERC's request. the enclosure is not being made publicly available since it contains critical energy infrastructure information.

Docket No. 5()"'395

Enclosure:

Dam Safety Inspection Report cc w/o enclosure: Distribution via Listserv The enclosure transmitted herewith contains Security-Related information.

When separated from enclosure, this document is decontrolled.

DISTRIBUTION:

PUBLIC LPL2-1 RlF RidsNrrDorlLpl2-1 Resource J Bartley, Region II ADAMS Accession No.: PKG:

Sincerely, IRA!

Robert E. Martin, Senior Project Manager Plant licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrPMSummer Resource RidsNrrLASFigueroa RidsRgn2MailCenter Resource MBarillas,NRR RidsOgcRp Resource RidsAcrsAcnw _MaiICTR JUribe, NRR ML13192A340 Nonpubllc: ML13192A361 REPORT' ML13170A48S PUBLIC LTR' ML13192A36S

!IOFFICE NRRlLPL2*/PM NRRlLPL2-1

NRR/LPL2-1/LA NRRlDE NRRlLPL2-1/BC NAME RMartin MBarillas SFigueroa KKarwoski RPascarelli I DATE 07/18/13 07118/13 07117113 07/01/13 07118/13 INRRlLPL2-1/PM fRM;tin I 07118/13 OFFICIAL RECORD COpy OFFICIAL USE ONLY SENSITIVE FED, STATE, FOREIGN GOVT.

CONTROLLeD INfO