Letter Referring to 12/07/1973 Meeting Concerning Shearong Harris Nuclear Power Plant at the Council on Environmental Quality Offices
ML18230A973
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 12/11/1973
From: Muller D
US Atomic Energy Commission (AEC)
To: Ravan J
US Atomic Energy Commission (AEC)
References
Download: ML18230A973 (12)


Text

Docket Hos. 50-400',"

50%01, 50"402) and 50-403 Mr. Jack E. Ravan Regional Administrator Region IV Environmental Protection Agency 1421 Peachtree

Stxeet, ME.

Atlanta, Georgia 30309 DISTRIBUTION:

973 Local PDR Docket Piles (ENVIRON)

DR Reading L Reading RP Reading EP-2 Reading L. Manning Muntzing, DR John F. O'eary, L:DIR L. V. Gossick, ADR E.

G. Case, L:DD A. Giambusso, L:DDRP D. R. Muller, L:ADEP EP Branch Chiefs, L J. Hl Cusack, L:EP-2 W. J. Ross, L:EP-2 J.

M. Cutchin, L:PWR-1 Dear Mr. Ravan; R. L. Wade, j.:EP-2 J. Scinto, OGC Reference is made to the meeting of December 7, 1973, concerning the Shearon Harris Nuclear Pover Plant at. the Council on Environmental Quality offices.

During this meeting, you stated that you vere constrained to require cooling towers to be buQt at the Shearon Harris Plant in that the applicant~s original proposal mould, in your vie@, be illegal In view of this interpretation of,EPA xesponsibilities, ne stated that ve have no alternative but to exyedite publication of the revised Environmental Xmpact Statement.

Xn this statement ve anticipate providing our analysis of the,envixon-m ntal impact of the Shearon Harris Plant as nov proposed rdth cooling tours as compared vith the previous plant design vith open cycle cooling, but a larger cooling lake We further plan to explain the bases for the various positions taken relative to plant cooling.

To assure that tm accurately describe your viev, please reconfirm your meeting position.

Ue presently plan to start printing the revised statement on December 27, 1973.

Therefore, ve vtllneed any response you care to make prior to that date.

As 'you are gully a~rare, this large plant est not be delayed in view of the national energy crisis.

PLSE SEE ATTACHED YELLOW FOR PREVIOUS Sincerely, Original signed bV Daniel R. Muller Daniel R. MuH.er, Assistant Director for Znvironmental Prospects

'irectorate of Licensing CONCURRENCES.

OFFICE~

SUIIIIAICE~

L:EP-GKD er:pb L,:ADEP 12/ll/73 12/ / 3 Ponn ABC 3 I8 IRev. II $3) ARChl 0140 OPO C4j IO OI445 'I 448.410

4, 11 4

4 A

A A

4

'I A 4

4 4

)I 1,

'I I',,

I 1

I AA j I

I 1

I A

I AA 4

I

\\(

I I

.A

~

I

~

~

(A I

AJ'AD 4

4 IAA A

I I'.:-

I

~

a AA J

)

I ~,

gCC'I g~+

ee 0

rz ap b+

~O)gC O'I UNITED STATES ATOMIC ENERGY COMMISSION WASHINGTON, D.C.

20545 Docket Nos. 50-400, 50-401, 50-402, and 50-403 Mr. Jack E. Ravan Regional Administrator Region IV Environmental Protection Agency 1421 Peachtree

Street, NE.

Atlanta, Georgia 30309

Dear Mr. Ravan:

p PP

,0

~)

(o~

/

~/y p( ~

gC

~P2'eference is made to the meeting of December 7, 1973, concerning the Sheaxon Harris Nuclear Power Plant at the Council on Environmental Quality offices.

During this meeting, you stated that you were leSakky constrain d to require cooling towers to be built at the Shearon Harris Plant In view p'S ~of~ interpretation of EPA responsibiiities, we stated that we have no alternative but'to expedite publication of the revised Environmental Impact Statement In this statement we anticipate pxoviding our analysis of the environme al impact of the Shearon Harris Plant as now proposed with cooling towers as compared with the previous plant design with open cycle'ooling, but a larger cooling lake.

We further plan to explain the bases for the various positions taken relative to plant cooling. /Tn this

egard, we will nclude for cpmplateness our letter of July 10, 1973 to. Mr. Earle,C.

Hubbard of t e North Caro ina Office of Water and Ai Resources.

Tha letter state in part, ".

. the Regional Admin trator may only. approve excep ions to wate quality standards wher

. (2),the ost of meetin the standar s is economically prohibited wh n compared wit the expected dneH.ts to b obtain d~

To assure that we accurately describe t n, please reconfirm your meeting position'

1

~

~

Mr. Jack E. Ravan 2

prese tly plan to start printing the revised statement on December 27, 1973~

will need your>>

~grespons prior to that date.

As you are fully aware, this large plant

< must no be delayed in view of the national energy crisis.

Sincerely, Daniel R. Muller, Assistant Director for Environmental Projects Directorate of Licensing

~

~

l w 1

I,

~

r t

I g

N

~

~

l'+I l

t<'

A 4

F w IC-k

Docket Nos. 50-400, 5~01, 50%02~

and 50-403

.h I

fh. Jaclc E. Ravan Regional Administrator Region IV Environmental Protection Agency 1421 Peachtree Stxeet, M.

Atlanta, Ceorgia 30309 Bear Hr. Ravan:

Reference is made to the mee g of December 7, 1973, concerning the Shearon Harris Nuclear Pove Plant at the Council on Environmental Quality offices.

During this m eting, yo.'stated that you ~fera legally constrained to requix'e cooling tomers to be, built at the Sheaxon Harris Plant.

Xn vine of your intexpretatio 'of ZPA responsibilities, axe stated that ue have no alternative but t ezpedite puMication of the revised Envixonmenta1.

epact Statement + this state~t ve anticipate providing our analysis of the envixonmen 61 impact of the Sheaxon Harris Plant as now proposed with cooling t xs as compaxed with the previous plant design vith open cycle'cool g, but a lax'ger cooling lake.

He further plan to ezplain the ba es for the various positions taken relative to plant cooling.

- ln,this x'egard, Efe still include for completeness your letter of July 10,>4973, to Heo Eerie C. Hubbard of the North Carolina Office of,Hater md Aix Resources.

That letter-stated in part, ".

. the Regional Administrator may only approve ezceptions to ~~ster quality standards

+here... (2) the cost of meeting the standards is economically pxohibited @hen compaxed Mth the expected benefits,to be obtained, To assure that ne accurately'escribe the situation, please reconfirm your meeting position and perhaps ezplain the quotation above.

OFFICE~

SURIIAME~

OATE~

Ponu ~IN (Red. 9 $3) ARCM 0340 Ofc C4S IC CI4OI I 4aa eVa

E

~

lt at E

a E'I

~

- I I ~ fftf

I I

r E

I I

a

\\

I-a I~

I ar

~ ~

I I

EE'

~.

n r-~

(

I I

~

L

-a tf r

E"

~ IE f

'a II atA'I I

II E E'f;

1 Mr+ Jacl: E. Ravan We must apologize for the rush, but wa presently plan to start printing the reVised statement on December 27, 1973> and thus villneed your response prior to that date.

As you are fully aware, this large plant must not be delayed in vie+ of the national energy crisis.

Sincerely, DISTRIBUTION:

AEO PDR Local PDR Docket Piles (ENVIRON)

DR Reading L Reading RP Reading EP-2 Reading L. Manning Muntzing, DR John P. OILeary, L:DIR L. V. Cossick, ADR E.

G. Case, L:DD A. Giambusso, L:DDRP D. R. Muller, L:ADEP EP Branch Chiefs, L J.

H, Cusack, L:EP-2 W. J.

Ross, L:EP-2 J.

M. Cutchin, L:PWR-1 R. L. Wade, L:EP-2 J. Scinto, OGC n

OrIginal s'.,I 'y Daniel R, Muller, Daniol R, Muller, Assistant Director for Envfronmental Prospects Directorate of Licensing 4

OFFICE~

x-7796 SLIIIIIhMS~

h L EP~2 KDI.

GKDicker:pb 12/11/73 L:ADEP 12/// /

L:DDR, AGiatn usso l2/>) In' EG e

~u) n~

L:DIR JohnFO ILea 12/

/73 Poem A~IIIIRev. 9.S3) AECM OX40 OFO C43 15 11465 I 44'11

o

~

'I

~

f,>>

P

)IN I, went'I

".I-t."

I g

hg y

'e 4

te

~

I,,

~

h Il n,t.

)

~ (4 I

g

(

'\\

l l lef

~

  • I

~ >>

~.,

~

I I

p h

I

~

-I

(

I a

re em I

I L.

Ph= l r=

Ip htt lt It~

~ p

~

It I ~

I I

I

~ I I I

p

~

t 1

~-('I I>

I

{>>

l.>>*

W L

c<

I ~

I

>'l I

h

~

I

DISTRIBUTION:

AEC PDR

~

Jl Local PDR Docket Files (ENVIRON)

L Reading RP Reading EP-2 Reading L. Manning gdntzing, DR John F. 0'Geary, L:DIR L. V. Gossick, ADR E. G.<Case, I,:DD D. R.'uller, L:ADEP A., Giambusso, L:DDRP PP Branch Chiefs, L

J. H. Cusack, L:EP-2 W. J.

Ross, L:EP-2 J.

M. Cutchin, L:PWR-1 R. L. Wade, L:EP-2, J. Scinto, OGC Docket Nos. 50-400, 50-401) 50-402, and 50-403 1fr Jack Z. Ravan Regional Administrator

'Region XV Environmental Protection Agency 1421 Peachtree

Street, HE.

Atlanta, Georgia 30309

Dear Hx'. Ravan:

I Reference is made to oux'eaten of December 7, 1973, concerning the Harris Nuclear 7otmr 'Plant.

Wo'plan for completeness to include in our revised Environr.ental Impact Stater.ent your lettex of July 10, 1973, to Mr>> Earle C

Hubbard of gee North Carolina Office of Water and Aix Resources>>

That letter stated in part, "

ithe Regional Administrator may only approve exceptions to water quality standards zRxere..o(2) the

'ost of mooting the stan'Bards is economically proMbited when compared Uith the mgected benefits to be obtaineds..

Xn our meeting you stated that. you stere XegaLLy constxained to require cooling toyrers to be built at the Harris'P1ant.

Uould you please r'econfixD your me@ging position and perhaps explain the quotation above.

We mmt the forthcoming statement to accurately describe the situation.

/

Ue must apologise for the rush, but xm presently plan 'to start printing the revtseL statement on December 27, 1973 As you are fully aware, this large,plant must not be delayed in vier of the national enexgy

- cxisis; ance therefore, may ve have your nastier prior to the above date.

Sincerely, Daniel R. Muller, Assistant Director for Env'ixonmcntal Prospects Directorate of Licensing OFFICE~

SURNAME~

x-7796 L:EP-,

GKDic er:pb L:ADEP DRMuller 12/10/73 12/ '73 L:DDRP AGiambusso 12/,

/73 L:DD L:DIR EGCase JohnFO'Leary l2/

/73 12/

- /73 Poem ~SS IRcv. 0 SM AECN O~

OPO C43 IO 01456 1

444 470

C C

C a a I'

~

J C

ta '

ttf

'I I I r

-a I

f F

~,

a it 1 CF E

C I

I a

a c,

~

a f'

~

a J

~

C r

tfa a

)

'I CW'f k

II a a a

M

C.

C C fl b.

f

)I a t I

i'

)