Letter Re Withdrawal of Relief Request from 10 CFR 50.55a
ML022040210
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/31/2002
From: Stang J
NRC/NRR/DLPM/LPD3
To: Bakken A
Indiana Michigan Power Co
References
TAC MB3551, TAC MB3552
Download: ML022040210 (3)


Text

July 31, 2002 Mr. A. Christopher Bakken III, Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107

SUBJECT:

DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 - WITHDRAWAL OF RELIEF REQUEST FROM 10 CFR 50.55a (TAC NOS. MB3551 AND MB3552)

Dear Mr. Bakken:

By letter dated October 4, 2001, pursuant to 10 CFR 50.55a, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (D. C. Cook), Units 1 and 2, requested approval of two alternatives to the requirements of Section XI of the American Society of Mechanical Engineers Code for repair of flaws that may be identified during inspections of the reactor vessel heads at D. C. Cook, Units 1 and 2. Specifically, the proposed alternatives would allow the use of an ambient temperature automatic or machine gas tungsten arc weld temper bead process for certain repairs to J-groove welds on vessel head penetrations (VHPs),

and the use of the embedded flaw technique for repairs to J-groove welds on VHPs. No repairs were required following the examination of each units reactor vessel head. Therefore, I&M does not require approval of the proposed alternatives.

By letter date July 17, 2002, I&M stated that the proposed alternatives to 10 CFR 50.55a are no longer required and requested that the proposed alternatives be withdrawn. Therefore, based on your letter, the request for review of the proposed alternatives is considered to be withdrawn.

This completes the Nuclear Regulatory Commission review of the proposed alternatives.

Sincerely,

/RA/

John F. Stang, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316 cc: See next page

ML022040210 OFFICE PM:PD3-1 LA:PD3-1 SC:PD3-1 NAME JStang THarris LRaghavan DATE 7/26/02 7/25/02 7/26/02

Donald C. Cook Nuclear Plant, Units 1 and 2 cc:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, MI 48913 Township Supervisor Lake Township Hall P.O. Box 818 Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, MI 49127 David W. Jenkins, Esquire Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mayor, City of Bridgman P.O. Box 366 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Joseph E. Pollock Plant Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr Blvd P.O. Box 30630, CPH Mailroom Lansing, MI 48909-8130 Scot A. Greenlee Director, Nuclear Technical Services Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107 David A. Lochbaum Union of Concerned Scientists 1616 P Street NW, Suite 310 Washington, DC 20036-1495 Site Vice President Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106