Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17340A510 + (Inservice Insp in Nov 1980.Describes Gauging of Steam Generator Hot & Cold Legs,Measurement of Visible Flow Slots,Eddy Current Insp of Small Radius U-bends & Preventive Plugging)
- ML19269C594 + (Inservice Insp of Concrete Helium Permeability & Liner Corrosion Surveillance Will Be Delayed Until Second Refueling Outage)
- ML19262A356 + (Inservice Insp of PWR Steam Generator Tubes, June 1974, W/Effective Date 740901)
- ML19326B713 + (Inservice Insp of Steam Generator Tubes)
- ML19210A568 + (Inservice Insp of TMI-1 Class 1 Component Pressure Boundary. Piping Diagrams Re Insp Encl)
- ML19249F125 + (Inservice Insp of TMI-1 Class 2 Component Pressure Boundaries)
- ML19249F130 + (Inservice Insp of TMI-1 Pumps Provided W/Emergency Power Sources)
- ML19260B228 + (Inservice Insp,Examination Summary,791003-16,Insp Period 2, Steam Generator Tube Eddy Current Exam)
- ML20012E429 + (Inservice Insp-Exam Summary 900103-0219 Refueling Outage 13,Insp Period 2,Second Interval)
- ML20128E588 + (Inservice Insp-Exam Summary Prairie Island Nuclear Generating Plant-Unit 1,850114-0222,First 10-Yr Final Rept)
- ML20211Q658 + (Inservice Insp-Exam Summary for 861020-1119)
- ML19289D180 + (Inservice Insp-Examination Summary, 781127-1209)
- ML19259B264 + (Inservice Insp-Examination Summary,Oct 9 to Nov 8 1978. Summarizes Sixth Inservice Insp.Results Indicate Integrity of Sys Has Been Maintained W/No Indication of Degradation)
- ML20064N273 + (Inservice Insp-Plan B)
- ML19208B430 + (Inservice Insp/Examination summary,790607-11,special Feedwater Piping Examination)
- ML19208B433 + (Inservice Insp/Examination summary,790711-31,second Special Feedwater Piping Examination)
- ML20262A349 + (Inservice Inspectin Program Zone 58 from Line 136 Valve 3HV 9334 System 1204 to Line 138 Valve 099 System 1204. Sheet 1 of 2)
- RC-17-0106, Inservice Inspection (ISI) Owners Activity Report (OAR) for Refueling Outage 23 + (Inservice Inspection (ISI) Owners Activity Report (OAR) for Refueling Outage 23)
- RA-25-0045, Inservice Inspection (ISI) Owners Activity Report for Refueling Outage C1R28 + (Inservice Inspection (ISI) Owners Activity Report for Refueling Outage C1R28)
- RC-16-0034, Inservice Inspection (ISI) Owners Activity Report )OAR) for Refueling Outage 22 + (Inservice Inspection (ISI) Owners Activity Report )OAR) for Refueling Outage 22)
- CP-201900496, Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 20 (IRF20) + (Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 20 (IRF20))
- ML040150511 + (Inservice Inspection (ISI) Pressure Test Plan, Third Ten-Year Interval Plan)
- L-2004-046, Inservice Inspection (ISI) Program Missing Pages from FPLs Letter L-2004-046, Dated March 11, 2004 + (Inservice Inspection (ISI) Program Missing Pages from FPLs Letter L-2004-046, Dated March 11, 2004)
- WO 18-0031, Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 + (Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1)
- ML020350308 + (Inservice Inspection (ISI) Program Relief Requests S1-RR-B01 & S1-RR-C01 for NRC Approval)
- GO2-16-012, Inservice Inspection (ISI) Program Relief Request 4ISI-05 + (Inservice Inspection (ISI) Program Relief Request 4ISI-05)
- GO2-14-017, Inservice Inspection (ISI) Program Request 3 ISI-14 + (Inservice Inspection (ISI) Program Request 3 ISI-14)
- GNRO-2008/00071, Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0 + (Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0)
- CPSES-200200779, Inservice Inspection (ISI) Revision to Relief Request A-5 from 1986 Edition of ASME Code, Section XI, No Addenda + (Inservice Inspection (ISI) Revision to Relief Request A-5 from 1986 Edition of ASME Code, Section XI, No Addenda)
- NL-05-088, Inservice Inspection (ISI) Second Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval + (Inservice Inspection (ISI) Second Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval)
- 1CAN050201, Inservice Inspection (ISI) Summary + (Inservice Inspection (ISI) Summary)
- ML030290090 + (Inservice Inspection (ISI) Summary Report Fall 2002 Inservice Inspection Period)
- ML020450608 + (Inservice Inspection (ISI) Summary Report Fall 2001 Inservice Inspection Period)
- NLS2003080, Inservice Inspection (ISI) Summary Report for the Spring 2003 Refueling Outage at Cooper Nuclear Station + (Inservice Inspection (ISI) Summary Report for the Spring 2003 Refueling Outage at Cooper Nuclear Station)
- 2CAN030502, Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 + (Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6)
- 1CAN110702, Inservice Inspection (ISI) Summary Report + (Inservice Inspection (ISI) Summary Report)
- 1CAN080701, Inservice Inspection (ISI) Summary Report + (Inservice Inspection (ISI) Summary Report)
- ML003734960 + (Inservice Inspection (ISI) Summary Report)
- 2CAN070501, Inservice Inspection (ISI) Summary Report + (Inservice Inspection (ISI) Summary Report)
- ML050630405 + (Inservice Inspection (ISI) Third Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval)
- CP-202000261, Inservice Inspection (ISI) and Inservice Testing (IST) Program Relief Requests + (Inservice Inspection (ISI) and Inservice Testing (IST) Program Relief Requests)
- EPID:L-2020-LLR-0059 + (Inservice Inspection (ISI) and Inservice Testing (IST) Program Relief Requests)
- RA-21-0223, Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report + (Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report)
- EPID:L-2021-LRO-0043 + (Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report)
- LR-N13-0256, Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval + (Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval)
- LR-N11-0213, Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval + (Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval)
- GNRO-2009/00018, Inservice Inspection (Lsi) Relief Requests GG-ISI-005 Through 012 American Society of Mechanical Engineers Section XI Second 10-Year Inspection Interval Closeout + (Inservice Inspection (Lsi) Relief Requests GG-ISI-005 Through 012 American Society of Mechanical Engineers Section XI Second 10-Year Inspection Interval Closeout)
- ML20039D605 + (Inservice Inspection - Exam Summary Prairie Island Nuclear Generating Plant - Unit 1,810908-1014,Refueling Outage 6, Insp Period 3)
- ML20091D779 + (Inservice Inspection 90-Day Rept,Beaver Valley Power Station Unit 1,Outage 8 for Insp Term from 891222-910715)
- LR-N05-0380, Inservice Inspection Activities - 90 Day Report Fourteenth Refueling Outage Salem Generating Station Unit 2 + (Inservice Inspection Activities - 90 Day Report Fourteenth Refueling Outage Salem Generating Station Unit 2)
- LR-N08-0012, Inservice Inspection Activities - 90 Day Report Fourteenth Refueling Outage + (Inservice Inspection Activities - 90 Day Report Fourteenth Refueling Outage)