y MW

<e PRAIRIEISLAND NUCLEAR GENERATING PLANT l Red Wing, Minnesota UNITS 1 AND 2

\

l I

l wwusarous. sr.erut

=- -

.,1 INSERVICE INSPECTION - EXAMINATION

SUMMARY

PRAIRIE ISLAND NUCLEAR GENERATING' PLANT - UNIT l' JANUARY 14, 1985 THRU FEBRUARY 22, 1985-R4 IST~ TEN YEAR FINAL REPORT NORTHERN STATES POWER COMPANY MINNEAPOLIS. MINNESOTA REPORT'DATE: COMMERCIAL SERVICE MAY-1,~1985 DATE: DEC. 16, 1973

r-NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1 INSERVICE INSPECTION - EXAMINATION

SUMMARY

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1 JANUARY 14, 1985 THRU FEBRUARY 22, 1985 REFUELING OUTAGE 9 INSPECTION PERIOD 3 Report Date: Prepared by: L.C. Dahlman i

MAY 1, 1985 M & SP Specialist Reviewed by:

.T. Ar(de"r.on '

M & SP Engineer Comercial Service Date: 1 December 16, 1973 Approved by: #J,,ew 8 bh G.T/Krduse

>

  • Superintendent, 7

Materials and Special Processes l-LCD101483JJB01-LT

Inservice Inspection - Examination Sumary PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1

- INDEX -

1.0 INTRODUCTION

o 2.0

SUMMARY

3.0 DISCUSSION OF EXAMINATION 3.1 Inspection Boundary 3.2 Examination Methods 3.3 Examination Procedures 3.4 Equipment and Materials 3.5 Personnel 3.6 Evaluation 3.7 Examination Reports and Documentation 4.0 Reactor Pressure Vessel Examinations APPENDIX A - ASME Class 1 Examinations Inservice Inspection - Examination Sumary Tables:

i Table S1.1 - Reactor Vessels

, Table S1.5 - Reactor Coolant Pumps

Table S1.6 - Valve Pressure Boundary Table II -

Baseline Comparison Sumary Table III - Isometric Sumary APPENDIX B - ASME Class 2 Examinations Inservice Inspection - Examination Sumary Tables Table S2.1.2 - Pressure Vessels - Accumulator Tanks Table II - Baseline Comparison Summary Table III - Isometric Drawing Sumary Appendix C - Seismic Bolting Examination

  • Inservice Inspection - Examination Sumary Tables:

Table SB - Seismic Bolting

-Table-II - Baseline Comparison Sumary Table III - Isometric Sumary Appendix D Table I - Personnel Listing Table II - Ultrasonic Calibration Blocks

. Table III - Procedure Listing Table IV - Equipment and Materials LCD101483JJB01-LT

(

l l

Appendix E ,

Form NIS-1, Owners' Data Report for Inservice Inspections

(

i A s b

LC0101483JJB01-LT

g:

INSERVICE INSPECTION - EXAMINATION

SUMMARY

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 1 JANUARY 14, TO FEBRUARY 22, 1985

1.0 INTRODUCTION

This report is a summary of the examinations performed during the ninth inservice inspection at the Prairie Island Nuclear Generating Plant - Unit 1. This was the last inservice inspection conducted for inspection period three of the 1st ten year interval. The examinations were performed during the plant's ninth refueling outage from January 14, 1985 thru February 22, 1985. Prairie Island

- Unit 1 began commercial operation on December 16, 1973.

This report identifies the components examined, the examination methods used, the examination number, and summarizes the examination results of each of the following areas:

1. Pressure retaining components and supports of the reactor coolant and associated systems classified as ASME Class 1 and ASME Class 2.
2. Reactor pressure vessel examinations.
3. Bolting of seismic supports classified as ASME Class 1.

2.0 INSPECTION

SUMMARY

The evaluation of the results from the inservice examinations indicated that the integrity of the systems has been maintained.

3.0 BALANCE OF PLANT 3.1 EXAMINATION PLAN The examination plan focused on the pressure-retaining compo-nents and their supports of the reactor coolant and associated auxiliary systems classified as ASME Class 1, Class 2, and l

Seismic Bolting.

h-

)

The examination plan was based on the examination requirements of the ASME Boiler and Pressure Vessel Code Section XI,1974 Edition through and including the Summer 1975 Addenda, and 6

complied with Prairie Island's Technical Specification, Section TS 4.2. The Examination is in accordance with the program submitted to the United States Nuclear Regulatory Commission on February 1,1978 titled, "ASME Code Section XI Inservice Inspection and Testing Program and Information Required for NRC Review of Requests for Relief From ASME Code Section XI Requirements".

LCD101483JJB01-LT J

f' 3.2 EXAMINATION METHODS Ultrasonic examination methods and techniques were used to perform the volumetric examinations. The ultrasonic test systems consisted of an ultrasonic digital analog tester and a two channel strip chart recorder. One channel of the recorder was calibrated to reflect ultrasonic screen height (amplitude) and the second channel,was calibrated to indicate metal path (range) to the reflector. This approach to the examination gives a permanent record to the extent possible.

Liquid penetrant or magnetic particle examination methods were used to perform the surface examinations. , The liquid penetrant examinations were performed using color contrast-solvent removable materials.

All visual examinations were aided when necessary with artifi-cial lighting and verified for adequacy with an 18% neutral gray card with a 1/32 inch black line.

3.3 EXAMINATION PROCEDURES The ultrasonic examination procedure for pipe welds complied with the requirements of Appendix III of ASME Section XI that was issued in the Winter 1975 Addenda. All other examination procedures complied with the requirements of the 1974 Edition through and including the Summer 1975 Addenda of ASME Section XI. A listing of the procedures used for the examinations is shown in Table III of Appendix D.

3.4 EQUIPMENT AND MATERIALS All equipment and expendable materials used in the examinations are listed either by serial number or type along with their respective calibration date or batch number in Table IV of Appendix 0.

The ultrasonic calibration standards used in the examination are listed in Table II of Appendix D. These standards are

owned and maintained by NSP at the plant site.

. 3.5 PERSONNEL l Northern States Power Company contracted Lambert, MacGill and l . , Thomas Inc. and Westinghouse to perform the examinations.

  • Hartford Steam Boiler Inspection and Insurance Company, repre-senting ANI, provided the Authorized Inspection.

All personnel involved in the performance or evaluation of examinations are listed along with their title, organization and ASNT Level of Certification in Table I of Appendix 0.

LCD101483JJB01-LT

]

l l

Certifications for examination personnel are maintained on file by Northern States Power Company.

3.6 EVALUATION Any indications disclosed in the examinations were evaluated by the examiner at the time, in accordance with the rules of the procedure and ASME Section XI.

The ultrasonic examiner was aided in his evaluation by a calibration performed on a standard reference before each day's examination, checked before and after each individual examina-tion and at in.tervals not exceeding four (4) hours. In addi-tion, the ultrasonic data was recorded on strip charts which were made a part of the inspection report, and permitted further evaluation.

3.7 EXAMINATION REPORTS AND DOCUMENTATION All examination reports and documentation are maintained on file by Northern States Power Company. Table 1 of Appendices A, B, and C identifies the examination report number (s) for each item examined. Many of the items identify more than one examination report because of the different types of examina-tions performed on the item.

Table I of Appendix A, B, and C summarizes all the examinations performed to date and completes the ten year examination j requirements. For retrieval purposes, the prefix of the inspection report number corresponds with the year the inspec-tion was performed. The examination report numbers for this .

l outage are prefixed with "A85". l l

Table II of Appendix A, B, and C compares the baseline examina- I tion results with the results obtained during this examination. l Table III of Appendix A, B, and C identifies the isometric drawings that were used for the examinations. The personnel, ultrasonic calibration blocks, procedures, equipment and materials that were used for the inspection are identified in I the tables of Appendix 0. Appendix E contains the Form NIS-1 j titled, "0wner's Data Report for Inservice Inspections". j h - 3.8

SUMMARY

OF RESULTS The only anomalies detected were two linear PT indications on l

- the 0.D. surface of Reactor. Coolant Pump No. 12. The anomalies were accepted based on the acceptance standard of the 1980 Edition of ASME Section XI and found to be within the allowable limitations of table 1WB-3518-2.

LCD101483JJB01-LT l

4.0 REACTOR PRESSURE VESSEL EXAMINATIONS Westinghouse was contracted to perform the reactor pressure vessel volumetric examinations utilizing their remotely operated ultrasonic inspection tool. Examinations were performed in accordance with Section XI of'the ASME code, 1974 Edition, through and including Summer 1975 Addenda; NRC Regulatory Guide 1.150, " Ultrasonic Testing of Reactor Vessel Welds During Preservice and Inservice Examinations", Revision 1, Appendix A. " Alternative Method"; and Prairie Island Technical Specification, Section TS 4.2.

Volumetric examination areas included the shell-to-flange weld; flange ligaments; vessel supports; circumferential seam and head welds; and the shell-to-nozzle welds, safe-end welds, and inner radius sections for the inlet nozzles. The shell-to-nozzle and the safe-end welds of the safety injection nozzles were volumetrically examined, however the ultrasonic technique for the' nozzle inner radius sections proved inadequate and Westinghouse was unable to qualify this procedure prior to the scheduled examination date. Therefore the safety injection nozzles' inner radius section surfaces were visually examined remotely and we intend to implement a qualified volumetric technique for these areas during the next scheduled vessel examination.

Other visual examination areas included the reactor vessel I.D. surface (s); core barrel; upper and lower internals; sections of vessel cladding; and other accessible areas upon removal of the core / support structures. These examinations completed the vessel inspection requirements for the first (1st) Interval as described in the aforementioned ASME Code Section. No reportable indications were observed during these examinations.

Copies of the procedures used, inspection program details, inspection and evaluation data, and personnel certifications are contained under a separate report prepared by Westinghouse. This report is maintained on file by Northern States Power Company.

~~

--~~

e MTA041585WMH01

. _ _ _. _. ._.A

F

=

m i

4 i

I APPENDIX A

! ASME CLASS 1 EXAMINATIONS i

  • =

b 4

.____ _ , . . , _ _ , . . . _ _ . - . . _ .. . , _ , _ . . _ . . . , , _ _ . _ . _ _ . - _ . _ . . . . . . . . _ . . _ . _ , . _ , . _ . . . _ . _ _ . . . . _ . _ . _ - ~ _ . , . . _ . . . . . _ . _ - . _ . - . , , . ..

Fona 9-0034,Rev.0 (H&SP 5.2)

NORTHERN STATES POWER CO. TABt.E SI l' PRAIRIE ISLAND UNIT I l D E OF INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: R OR VESSELS SUB INSP. R EO'D. AMT.

N DE y ITEM INSPECTION I"" GORY PER. AMT. EXAM IDENTIFICATION STEM TO BE EXAMINED REPORT NO.

Bl.1 B-A LONGITUDINAL AND CIRCUHFER-ENTIAL SHELL WELDS IN EDRE REGION LONGITUDINAL WELDS - - -

-NONE-CIRCUMFERENTIAL WELDS THREE 50% 100% WELD NO. 3 85-W RPV REPORT

~

Bl.2 B-B LONGITUDINAL AND CIRCUMFER-ENTIAL WELDS IN SHELL (OTHER TRM THOSE OF CATEGORY B-A AND B-C AND MERIDIONAL AND CIRCUMFERENTIAL SEAM WELDS IN BOTTOM HEAD AND CLOSURE HEAD (OTHER THAN THOSE OF CATEGORY B-C)

LONGITUDINAL WELDS - - -

-NONE-s MERIDIONAL WELDS - - -

-NONE-CIRCUMFERENTIAL WELDS THREE 5% 100% WELD NO. 2 85-W RPV REPORT 5% 7.2% WELD NO 4 85-W RPV REPORT 5% 7.2% WELD NO. 5 85-W RPV REPORT Bl.3 8-C VESSEL-TO-FLANGE AND HEAD-TO-FLANGE CIRCUMFERENTIAL WELDS VESSEL-TO-FLANGE ONE 33% 33% NO. 1, STUD H0LE 77-W RPV REPORT 4 TO 14&23 TO 29 TWO 29% 29% NO. 1, STUD H0LE 80A-W RPV REPORT 16 TO 7832 TO 43 THREE 38% 38% REMAINDER OF 85-W RPV REPORT

-~

STUD H0LES 100% FROM VESSEL ID 85-W RPV REPORT

" " " - * = ' ' "

LCD010583RLA01-LT

e . . . 1 Form 9-0034,R2v.0 (M&SP 5.2)

TABLE SI I NORTHERN PRAIRIE ISLANDSTATES UNIT POWER {O. E Z OF b-I INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: R OR VE5SELS SUS INSP. REO'D. AMT. BTEM MEM DE IP INSPECTION

GORY ITEM TO BE EXAMINED R. MT. E MM 80ENT m T M REMT M Bl.3 B-C (CON'T)

HEAD-TO-FLANGE ONE 33% 33% NO. 6 STUD HOLE 77-W RPV REPORT &

1 THRU 6 77-T36, 138, 139 TWO 100% 100% NO. 6 STUD HOLE 80A-77, 79, 80 1 TO 48 l THREE 34% 34% NO. 6, STUD H0LE 83C-113, 114, 115 32 TO 48 TO 1 Bl.4 B-D PRIMARY N0ZZLE-TO-VESSEL WELDS AND N0ZZLE INSIDE RADIUSED SECTION REACTOR CORE COOLANT .

N0ZZLES OUTLET N0ZZLES ONE 1 1 RCC-A-1 77-W RPV REPORT TWO 1 1 RCC-B-1 80A~h RPV REPORT INLET N0ZZLES THREE 2 2 RCC-A-6, RCC-B-9 85-W RPV REPORT SAFETY INJECTION N0ZZLES THREE 1 1 W-8 85-W RPV REPORT THREE 1 1 W-11 85-7 RPV REPORT Bl.5 B-E VESSEL PENETRATIONS INCLUDING CONTROL R0D DRIVE AND INSTRU-HENTATION PENtIRATIONS CONTROL RCD PENETRATIONS ONE 3 *3 *EACH ITEM INSPECTED TWO 3 *3 BY PLANT PERSONNEL THREE 4 *3 DURING EACH REACTOR VESSEL LEAKAGE TEST INSTRUMENTATION PENETRATION ONE 3 *3 TWO 3 *3 THREE 3 *3 -

REACTOR VESSEL HEAD VENT *- 1 *1 1-RC-36 TO RC-8-5 ra m "-=*a sin LCD010583RLA01-LT

. 5 Form 9-0034,Rzv.0 (M&SP 5.2)

TABLE SI*l NORTHERN PRAIRIE ISLAND STATES UNIT POWER {O. 3 OF D INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: R E ~VE5SELS OR SUS INSP. R E Q*0. AMT. ITEM ITEM E DE F INSPECTION GORY ITEM TO SE EXAMINED PER. AMT. EXAM IDENTIFICATION REPORT NO.

81.6 B-F N0ZZLE-TO-SAFE END WELDS REACTOR CORE COOLANT N0ZZLES OUTLET N0ZZLES ONE 1' 1 RCC-A-1 S.E. 77-W RPV REPORT &

77-T56 TWO 1 1 RCC-B-1 S.E. 80A-W RPV REPORT 80A-T21 INLET N0ZZLES THREE 2 2 RCC-A-14 S.E.(PT) 83C-009, 009R 85-W RPV REPORT RCC B-14 S.E.(PT) 83CT008 85-W RPV REPORT REACTOR VESSEL SAFETY INJECT 0IN N0ZZLES N0ZZLE A.S.E. ONE 1 1 N0. 1 77-W RPV REPORT &

77-TSS N0ZZLE B.S.E. THREE 1 1 W1 S.E. 83C-007, 010 .

Bl.8 B-G-1 CLOSURE STUDS AND NUTS ONE 16 16 #1 THRU #16 77-W RPV REPORT &

77-T34 TWO 16 16 #17 THRU #318#33 80A-W RPV REPORT THREE 16 16 #32&#34 THRU #48 82-078, 039, 055 Bl.9 B-G-1 LIGAMENTS BETWEEN THREADED STUD HOLES ONE 16 16 STUD H0LE #4 THRU 77-W RPV REPORT

  1. 14&#23 THRU #29 TWO 13 13 STUD H0LE #16 & 80A-W RPV REPORT
  1. 17&#32 THRU #42 THREE 19 19 REMAINER OF STUD 85-W RPV REPORT HOLES roa= ov- m .ir.

LCD010583RLA01-LT'

f -

-I

, .. o e Form 9-0034,Rev.0 (H&SP 5.2)

NORTHERN STATES POWER CO. TABLE Sl.1 PRAIRIE ISLAND UNIT I PAGE 4 OF 5 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: REACTOR VESSELS SUD INSP. R EQ'D. AMT. BTEM INSPECTION U" E. ' NO DE IP GORY ITEM TO BE EXAMINED PER. AMT. EXAM IDENTIFICATION REPOR T NO.

Bl.10 B-G-1 CLOSURE WASHERS AND BUSHINGS WASHERS.(PAIRS) ONE 16 16 1 THRU 16 77-W RPV REPORT TWO 16 16 17 THRU 31 & 33 80A'W RPV REPORT THREE 16 16 32 & 34 THRU 48 82-053 BUSHINGS - - -

-NONE-Bl.11 B-G-2 PRESSURE. RETAINING BOLTING ONE 3 9 ALL 9 H0LES 77-W RPV REPORT TWO 3 9 ALL 9 H0LES 80A W RPV REPORT THREE 3 3 CLAMP #37 83C-T16 Bl.12 B-H INTEGRALLY WELDED VESSEL SUPPORTS THREE 2 2 WS1, WS2 85-W RPV REPORT Bl.13 B-I-1 CLOSURE HEAD CLADDING ONE 2 2 HCP-1 & HCP-2 77-W RPV REPORT -

TWO 2 2 HCP-3 & HCP-4 80AW RPV REPORT THREE 2 2 HCP-5 & HCP-6 83C-T11 Bl.14 B-I-1 VESSEL CLADDING ONE 2 2 VCP9770 , VCP9237 0 76-W INTERNALS RPT TWO 2 2 VCP9670 , VCP9247 79-W INTERNALS RPT THREE 2 2 VCP-5, VCP-6 85-W RPV REPORT Bl.15 B-N-1 VESSEL INTERIOR UPPER INTERNALS AND LOWER INTERNALS ONE * *

  • 76-W INTERNALS RPT TWO * *
  • 79-V INTERNALS RPT THREE *
  • 85-W INTERNALS RPT
  • REPRESENTATIVE tEGIUNS OF THOSE INTERIOR SURFACES AND INTERNALS MADE ACCESSIBLE BY THE REMOVAL OF COMP 0NENTS DURING NORMAL REF JELING OPERATIONS 4

ro .......n.

LCD010583RLA01-LT

~}

e . . . I Form 9-0034,Rav.0 (H&SP 5.2) '

TABLE SI I NORTHERN PRAIRIE ISLANDSTATES UNIT POWER {O.

PAGE 5 op 5 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: REACTOR VESSELS SUS Y8 E N DE F N INSP. R EQ'D. AMT. BTEM INSPECTION ITEM PER. AMT. EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED Bl.16 B-N-2 INTERIOR ATTACHMENTS AND CORE SUPPORT STRUCTURES - - -

-NOT APPLICABLE FOR PWR VESSELS-Bl.17 B-N-3 REMOVABLE CORE-SUPPORT STRUCTURES THREE *- 100% 85-W INTERNALS' RPT

  • 100% OF THE VIS JALLY ACCESSIBLE
  • ATTACHMENT WELDS LND VISUALLY ACCESSIBL E SURFACES OF THE C )RE SUPPORT STRUCTURE Bl.18 B-0 CONTROL ROD DRIVE HOUSINGS PERIPHERAL CRD HOUSINGS THREE 2 2 CR-33, 17 A85-006, 007 Bl.19 B-P EXEMPTED COMPONENTS - *- -
  • ALL COMPONENTS
  • PERFORMED BY PLANT EXEMPTED FROM PERSONNEL IN ACCCOR )-

VOLUMETRIC AND ANCE WITH IWA-5000 SURFACE EXAMI- DURING EACH SYSTEM NATION BY LEAKAGE TEST AND IWB-1200 EACH SYSTEM HYDR 0-STATIC TEST REQUIRE )

BY IWB-5000 ro== n-sere ein LCD010583RLA01-LT-

r_ . q Form 9-0034,R v.0 (M&SP 5.2)

NORTHERN STATES POWER Cd. TABLE PRAIRIE ISLAND UNIT PAGE 1 OF 21 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOh ITEM: PIPING PRESSURE BOUNDARY-S M sue ITEM M^," To,E ,OR p INSP. .REO'D. AMT. ITEM INSPECTION GORY ITEM TO DE EXAMINED . AMT. EXAM- IDENTIFICATION REPORT NO, B4.1 B-F SAFE END TO PIPING AND SAFE END IN BRANCH PIPING WELDS REACTOR VESSEL REACTOR CORE COOLANT ONE 1 1 RCC-A-1 S.E. 77-W RPV REPORT &

SYSTEMS 29-RC-1A, 77-T56 TWO 1 1 RCC-B-1 S.E., 80A-W RPV REPORT

'29-RC-1B 80A-T21 THREE 2 2 RCC-A-14 S.E.(PT) 83C-009, 009R 85-W RPV REPORT RCC-B-14 S.E.(PT) 83C7008 85-W RPV REPORT SAFETY INJECTION ONE 1 1 W-2, 4-RC-14A 77-W RPV REPORT &

SYSTEMS 77-T54 THREE 1 1 W-2 82-069, 70 STEAM GENERATOR NO. 11 REACTOR CORE COOLANT ONE 1 1 RCC-A-5, 31-RC-2A 76-2, 29, 30 SYSTEM THREE 1 1 RCC-A-4, 29-RC-1A 83C-084, 123 STEAM GENERATOR NO. 12 REACTOR CORE COOLANT TWO 1 1 RCC-B-5, 31-RC-28 80A-62, 68 SYSTEM THREE 1 1 RCC-B-4, 29-RC-1B 83C-083, 092 PRESSURIZER SAFETY LINES ONE 2 2 8010A-1B S.E. 76-3, 55 80108-1B S.E. 76-4, 58 TWO 2 2 8010A-1B S.E. 80A-20, 41 80108-1B S.E. 80A-21, 43 ro- u-an en.

LCD010583RLA06-LT-t

. - . ... - - . . . . . = -

e . ,

Forms 9-0034,Rzw.O (H&SP 5.2)

NORTHERN STATES POWER CO. bI*

PRAIRIE ISLAND UNIT--- I TABLE - -.

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIIMEPRES$tfRE-QE- nuunurmi-

^"

sus HEM $7 Tg E OH E M

,p INSP. REQ *D. AMT. ITEM INSPECTION GORY ITEM TO SE EXAM 0NED E . MAM MNTmN MMT M.

B4.1 B-F (CONT'D)

SURGE LINE TWO 1 1 W-6SE, 10-RC-4 78-025, 084

! RELIEF LINE TWO 1 1 W-18. S.E. 80-19, 3'8 TilREE I 1 W-18, S.E.81-130, 206 4

SPRAY LINE TWO 1 1 W-29, S.E. 80A-18, 37 THREE 1 1 W-29, S.E.81-143, 209

84.2, B-G-1 PRESSURE RETAINING BOLTS AND - - -

-NONE-

. B.43 & STUDS ( 2 IN. DIA.)

I B4.4 i

i B4.5 B-J CIRCUMFERENTIAL AND LONGITU-

  • l DINAL PIPE WELDS LONGITUDINAL WELDS - - -

-NONE-CIRCUMFERENTIAL WELOS (1.5 IN. NOM. DIA. SYSTEMS) .

SEAL INJECTION A ONE 1 1- W-1 77-113, 141 TWO 1 1 W-6 78-086, 112 THREE 1 1 W-5 81-256 l SEAL INJECTION 8 ONE I 1 W-6 77-38, 94 .

TWO 1 1 W-28 78-087, 111 THREE 1 1 W-2A 81-257 i

l i

, eo .>.a u. . ,.

LCD010583RLA06

. . n r a 4

) Form 9-003'+,Rev.0 (H&SP 5.2)

NORTilERN STATES POWER CO.

7

~

PRAIRIE ISLAND UNIT TABLE SI 4

_ t. PAGE 3 OF 21 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING PRESSURE BOUNDARY sus $^g" @ ,E S M INSP, ITEM ,p R EO'D. AMT. 81EM GORY R. M. INSPECTION ITEM 10 SE EXAMINED EXAM IDEN Wl W M . REW M B4.5 B-J (CONT'D)

(2.0 IN. NOM. DIA. SYSTEMS)

SEAL INJECTION A ONE 3 3 W-ll, 14, 16A 77-114, 143, 107, 123, 107, 125 .

ONE 2 BASELINE W-48A, 488 77-150, 151, 152 TWO 3 3 W-34, 37, 47 79-52, 82, 79 TilREE 4 4 W-21, 22, 27 81-84, 83, 85 W-35 83C-071 SEAL INJECTION 8 ONE 2 2 W-29, 30 77-20, 42, 43 TWO 2 2 W-14, 15A 79-SP2-75, 83 TWO 2 BASELINI W-CJ-4, D5228-3 ,

80A-128, 129 THREE 4 4 W-10, 11, 18, 19 81-269,252.121,120 CHARGING LINE CVCS ONE 6 6 W-41, 57, 62, 69, 77-86, 98, 18, 46, 70, 73 18, 45, 19, 41, 19, 40, 19, 39 TWO 6 6 W-36, 37, 66 78-078, 074, 073 W-2, 3, 34 79-54, 55, 50 THREE 6 6 W-ll, 12, 20, 21 82-049,050,051,052 W-29A, 32 83C-070, 069 LETDOWN LINE CVCS ONE 1 1 W-13 77-69, 73 TWO 1 1 W-ll 79-51 THREE 2 2 w-2, 16 81-125, 124 AUXILLIARY SPRAY TO ONE 1 1 W-1 77-70, 74 PRESSURIZER TWO 2 2- W-8, 9 79-SP2-81, 82 TilREE 2 2 W-1A, 3 82-102, 103 RESIDUAL TEMPERATURE ONE 1 1 W-16 77-122, 142 DETECTOR TAKE Off- TWO 2 2 W-20, 22 79-SP2-77, 76 COLD LEG A THREE 1 1 W-10 83C-042 ro = = o ra. n .,"

LCD010583RLA06 m-

e s. . , 1 Form 9-0034,Rev.0 (H&SP 5.2)

NORTilERN STATES POWER CO.

PRAIRIE ISLAND UNIT 1 TATLE -9 bl*4

, INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIgE-rutnuut --

RY -

SUB ITEM E. 4N INSP. HEO'D. AMT. ITEM GORY PER. INSPECTION ITEM TO BE EXAMINED AMT. EXAM IDENTIFICATION HEPORT NO.

i 84.5 B-J (CONT'D)

) RESIDUAL TEMPERATURE ONE 1 1 W-14 77-184, 103

DETECTOR TAKE OFF- TWO 1 1 W-2 79-80 COLD LEG B THREE 1 1 W-18 83C-067

]

4

! RESIDUAL TEMPERATURE ONE 1 1 W-23 77-121, 144

DETECTOR TAKE OFF- TWO 1 1 W-19 . 79-SP2-76 HOT LEG A THREE 2 2 W-15A, 16 83C-043, 044 RESIDUAL TEMPERATURE ONE 1 1 W-24 77-89, 106 DETECTOR TAKE OFF- TWO 1 1 W-5 79-81 Il0T LEG B TilREE 2 2 W-ll, 21 83C-065, 066 SAFETY INJECTION ONE 1 1 W-1A 77-50, 72 IIIGil HEAD A TWO - -

TilREE 1 1 W-5 81-82 SAFETY INJECTION ONE 1 1 W-13 77-51, 71 4

HIGil llEAD B TWO 1 1 W-1 79-71 THREE 2 2 W-4,5 81-254, 253 f

DRAIN LINE ON '

ONE 1 1 W-4 77-52, 145 j CROSS 0VER A TWO I -1 W-8 78-077

, TilREE 1 1 W-6 81-126 DRAIN LINE ON ONE - -

CROSS 0VER H TWO 1 1 W-2 79-53 4

THREE 1 1 W-7 81-122 REACTOR VESSEL ONE - -

i SAFETY INJECTION TWO 1 1 W-7 78-080 LOW llEAD A TilREE 3 3 W-8, 11, 9 81-79, 81, 80 ran,* s u-nous one

, LCD010583RLA06

Formi9-00}4,gev.0(H&SP5.2)

NORTHERN STATES POWER CO. SI 4

, TABLE PRAIRIE ISLAND UNIT 1. _

E b op n INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PI PRES 5URE BOUNDARY sus HEM g ^," T,T,E ,OR p SQM INSP. REO'D. AMT. ITEM INSPECTION

GORY ITEM TO 8E EXAMINED PER. AMT. EXAM IDENTWICATION REPORT NO.

i l B4.5 B-J (CONT'D)

REACTOR VESSEL ONE I I W-7 77-17, 44
SAFETY INJECTION TWO

' 1 1 W-2 78-079 i LOW llEAD B TilREE 1 1 W-7A 81-78 (3.0 IN. NOM. DIA. SYSTEMS)

SPRAY TO PRESSURIZER ONE 3 3 W-3, 11, 25A 77-54, 115, 88, 108, BRANCil A 97, 99 TWO 4 4 W-6, 10, 19, 24 79-94, 92, 91, 89 TilREE 4 4 W-20, 21 81-210, 211 W-21, 23 83C-105, 104

SPRAY TO PRESSURIZER ONE 1 1 W-2 77-104, 117 -

I BRANCH B TWO 1 1 W-14 79-90 TilREE 2 2 W-1, 3 82-040, 043 4

RESIDUAL TEMPERATURE ONE 1 1 W-4 77-53, 116

DETECTOR RETURN A TWO 1 1 W-8 78-075 I

TilREE 1 1 W-6 82-041 RESIDUAL TEMPERATURE ONE 1 1 W-3 77-83, 95 i DETECTOR RETURN B TWO 1 1 W-7 78-076 TilREE 1 1 W-6 83C-078 i

i PRESSURIZER RELIEF ONE 1 1 W-9 77-87, 100 i LINE A TWO 1 1 W-6 79-77 TilREE 1 1 W-11 81-207 3

PRESSURIZER RELIEF ONE 1 1 W-14 77-87, 101 LINE B TWO - -

TilREE - -

1 i

ron >.a.>. .fe.

LCD010583RLA06 1

Forni 9-0034,Rsv.O (H&SP 5.2)

NORTHERN STATES POWER CO. bI*

PRAIRIE ISLANO UNIT I TABLE - -.

E QE INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PI PRESMmmm_.21. urm sus STEM M GORY To,E ,p SQM INSP.

MR.

. REO R MT.

AMT.

Exm ITEM ONSPECilON

! ITEM TO SE EXAMONED NNYmN REN R i

l B4.5 B-J (CONT'D)

! (4.0 IN. NOM. DIA. SYSTEMS)

SAFETY INJECTION ONE 1 -

NONE OF THESE WEL[ S ARE ACCESSIBLE; LOW HEAD A TWO - -

THEY ARE LOCATED h ITHIN THE CONCRETE '

THREE - -

SHIELD WALL SAFETY' INJECTION ONE - -

SOME OF THESE WELI S A.tE ACCESSIBLE; LOW llEAD B TWO - -

OTHERS ARE LOCATEI WITHIN THE CONCRETE SHIELD WALL THREE 1 1 li-4 83C-090 ,

(6.0 IN. NOM. DIA. SYSTEMS)

SAFETY INJECTION ONE 2 2 W-9, 10 76-67, 68 LOW HEAD A TWO - -

THREE - -

SAFETY INJECTION ONE - -

LOW llEAD B TWO 1 1 W-5 79-74 TilREE - -

SAFETY INJECTION '

ONE - -

IIIGil HEAD A TWO 1 1 W-1 79-73 THREE - -

SAFETY INJECTION ONE - -

HIGH llEAD B TWO - -

TilREE 1 1 W-2 83C-103 PRESSURIZER SAFETY -

ONE 2 2 W-2, 3 76-56, 57 LINE A TWO - -

TilREE 4 4 W-7, 8, 10 81-190, 164, 165 W-6 82-100 co-..n....n.

LCD010583RLA06

  • y '

Form 9-0034,Rev,0 (H&SP 5.2)

NORTHERN STATES POWER CO. SI 4 PRAIRIE ISLAND UNIT __ TABLE

_l i PAGE LA-.

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJ00 ITEM: PIPING PRESSURE OF Buununus EXAM COMPONENT OR SYSTEM I #

y' IT P . E M X D MMNTIF TBON R POR .

l B4.5 B-J (CONT'D) l PRESS'URIZER SAFETY ONE - -

LINE B TWO 1 1 W-4 79-76 3 81-156, 158, 157 4

THREE 4 W-7, 8, 10 i W-5 83C-015 i PLO-CAP A ONE - -

TWO - -

THREE 1 1 W-1 83C-045 PLO-CAP B ONE - -

TWO 1 1 W-1 79-72 TilREE - -

(8.0 IN. NON. DIA. SYSTEMS)

RESIDUAL llEAT REMOVAL ONE 6 6 W-1, 20, 21, 22 76-53, 39, 40, 41,

! TAKE OFF A 23, 24 42, 43 I TWO 2 2 W-12, 14 78-034, 035 1

THREE 2 2- W-5, 7 81-277, 279 i RESIDUAL HEAT REMOVAL' ONE 2 2 W-10, 19 77-90, 92, 68

TAKE OFF B TWO 2 2 W-9, 17 78-045, 046 -

THREE 2 2 W-4, 7 81-278, 275

(10.0 IN. NOM. DIA SYSTEMS) 3 RESIDUAL HEAT REMOVAL ONE 2 2 w-8,9 76-64, 65 RETURN B TWO 1 1 W-5 78-83 TilREE 1 1 W-2 83C-068 PRESSURIZER SURGE ONE 2 1 W-5 76-54 LlHE B TWO - -

1 THREE I 1 W-1 83C-119 j .

ven u es sere esse LC0010583RLA06

, . . . 1 Foria 9-003t*,Hev 0 (H&SP 5,2)

NORTilERN STATES POWER CO. SI 4 '

TABLE PRAIRIE ISLAND UNIT.. L_ PAGE a _ np _ 11 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING PRtssunt HDunuanu__

EXAM COMPONENT OR SYSTEM tE*M D

$'E.,y O ND '"."

PE T E A$1 IDEN F TION E .

4

! B4.5 B-J (CONT'D)

(12.0 IN. NOM. DIA. SYSTEMS)

ACCUMULATOR DISCilARGE A ONE '3 3 W-6, 7, 8 76-36, 61, 37, 62, 38, 63 TWO - -

THREE 1 1 W-2 82-044 ACCUMULATOR DISCHARGE B ONE 1 1 W-13 77-75, 49, 49R TWO 1 1 W-5 79-45, 48 TilREE 2 2 W-8, 11 83C-072, 073 (27.5 IN. NOM. DIA. SYSTEMS)

REACTOR CORE COOLANT ONE - -

COLD LEG (INLET) A TWO - -

THREE 1 1 RCC-A-11 83C-012 REACTOR CORE COOLANT ONE - -

, COLD LEG (INLET) B TWO 1 1 RCC-B-12 80A-87 THREE - -

(29.0 IN. NOM. DIA. SYSTEMS)

REACTOR CORE COOLANT ONE - -

I Il0T LEG (0UTLET) A TWO - -

I TilREE 1 1 RCC-A-3 83C-124 REACTOR CORE COOLANT ONE 1 1 W-3 77-102 HOTLEG(0UTLET)B TWO - -

THREE - -

rossne s 7-se re af ra LCD010583RLA06

Form 9-0034,Rsv.0 (H&SP 5.2)-

NORTHERN STATES POWER CO. SI*4 l TABLE - -

PRA!RIE ISLAND UNIT ___ '

PAGE 30 MI INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING PRES $URE-Enunn ..

' M 508 MEN O 8 M UN INSP. REQ'D. AMT. ITEM ll4SPECTION GOHY ITEM TO BE EXAMINED PER. M T. EXAM- IDENTINTIM RENT M.

B4.5 B-J (CONT'D)

(31.0 IN. NOM. DIA. SYSTEMS)

REACTOR CORE COOLANT ONE 3 3 W-6, 7, 8 76-28,31,27,32,1,33 CROSSOVER A TWO - -

THREE 1 1 RCC-A-9 83C-Oll REACTOR CORE COOLANT ONE - -

CROSS 0VER B TWO 2 2 RCC-B-6 80A-67, 63 RCC-B-7 80A-69 TilREE - -

B4.6 B-J BRANCH PIPE CONNECTION WELDS EXCEEDING SIX INCH DIAMETER

. ACCUMULATOR DISCHARGE A ONE 1 1 W-R 76-34, 44, 45 ACCUMULATOR DISCHARGE B. - - -

RESIDUAL HEAT REMOVAL TAKE OFF B TWO 1 1 W-R 80A-66, 75, 76 PRESSURIZER SURGE TilREE 1 1 W-R 83C-120 LINE B RESIDUAL llEAT REMOVAL ONE 1 1 W-R 76-35, 52 TAKE OFF A L

ron,a a r-aa rs e/re LCD010583RLA06

q

. . . . i Forma 9-0034,Rev.0 (H&SP 5.2)

NORTHERN STATES POWER CO. TABLE bI'4 PRAIRIE ISLAND UNIT I U PAGE INSERVICE INSPECTION--EXAMINATION

SUMMARY

MAJOR ITEM: PIPING PRESSURE DE___.f!

poununni SU8 INSP, E- DE P.EQ'D. AMT. 8 TEM HEM 8NSPECTION GOHY ITEM TO BE EXAMINED PER. MT. EXAM IDENTI N Tim RE N M.

84.7 B-J BRANCll PIPE CONNECTION WELDS SIX INCH DIAMETER AND SMALLER (6.0 IN. NOM. DIA. SYSTEMS)

PLO-CAP A - - -

PLO-CAP B .,

SAFETY INJECTION THREE 1 1 W-R 83C-026 111G11llEAD A SAFETY INJECTION - - -

IIIGH llEAD B (3.0 IN. NOM. DIA. SYSTEMS)

SPRAY TO PRESSURIZER - - -

'l' BRANCil A l

SPRAY TO PRESSURIZER TilREE 1 1 W-R 82-064 BRANCH B RESIDUAL TEMPERATURE - - -

DETECTOR RETURN A RESIDUAL TEMPERATURE - - -

DETECTOR RETURN 8 (2.0 IN. NOM. DIA. SYSTEMS)

RESIDUAL TEMPERATURE ONE 1 1 W-R 77-133 DETECTOR TAKE OFF COLD LEG A ronne e r-aars e/ps LCD010583RLA06

Forme 9-0034,Rav.0 (H&SP 5.2) '

NORTHERN STATES POWER CO.

PRAIRIE ISLAND UNIT I TABLE __ bI*4 --

11 E nF__

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:_ PI PRESSURE BUunun_M ni sua E AM . "P " 8 M ITEM ND E IP INSP. REO*D. AMT. ITEM GORY PER. INSPECTION e

ITEM TO DE EXAMINED AMT. EXAM IDENT N Tim REMT M.

  • B4.7 B-J (CONT'D) -

. RESIDUAL TEMPERATURE - - -

DETECTOR TAKE OFF COLD LEG B DRAIN LINE ON - - -

CROSS 0VER A DRAIN LINE ON - - -

CROSS 0VER 8 CHARGINGLINECVC5 TWO 1 1 W-R 79-83, 83R REACTOR VESSEL THREE 1 1 W-R 81-94, 94R SAFETY INJECTION LOW HEAD A REACTOR VESSEL - - -

SAFETY INJECTION LOW HEAD B B4.8 B-J SOCKET WELDS

. , (2.0 IN. NOM. DIA. SYSTEMS)

SEAL INJECTION A DNE - -

TWO 1 1 SW-17 78-019 THREE 1 1 SW-18 81-263 SEAL INJECTION B ONE 1 1 SW-9A 77-036 TWO 1 BASELII E LA CJ-3 80A-130 THREE 1 1  :/w-13 81-265 rosene er-aere e/re LCD010583RLA06

-3 Form 9-0034,Rsv.0 (H&SP 5.2)

NORTHERN STATES POWER Cd. TABLE PRAIRIE ISLAND UNIT PAGE 12 op 21 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING PRESSURE BOUNDARY f SUS " 4NSP. REO'D. AMT.

DE IP BTEM INSPECTION ITEM PER. AMT. EXAM BOENTIFICATION REPOR T NO.

GORY ITEM TO BE EXAMINED B4.8 B-J (CONT'D)

CHARGING LINE B ONE 1 1 SW-75 77-065 TWO 1 1 SW-1 79-44 THREE 1 2 W-29 82-123 W-12 83C-025 LETDOWN LINE CVCS ONE - -

TWO 1 1 SW-5 79-21 THREE - -

AUXILLIARY SPRAY TO ONE 1 1 SW-1C 77-070 PRESSURIZER TWO - -

THREE - -

RESIDUAL TEMPERATURE ONE 1 1 SW-2 77-133 DETECTOR TAKE OFF TWO 1 1 SW-13/SW-13 78-24,24R/79-69,69R COLD LEG A SW-13 80A-109 THREE 1 1 W-10 83C-055 RESIDUAL TEMPERATURE ONE 1 1 SW-7 77-084 DETECTOR TAKE OFF TWO 1 1 SW-5 79-42 COLD LEG B THREE 1 , 1 W-13 83C-023,023R1,023R2 RESIDUAL TEMPERATURE ONE - -

DETECTOR TAKE OFF TWO 1 1 SW-10 79-SP2-73, 73R 110T LEG A SW-10 80A-65 THREE 1 1 W-15 83C-024,024R1,024R2 RESIDUAL TEMPERATURE ONE - -

DETECTOR TAKE OFF TWO 1 1 SW-15 79-43 HOT LEG B THREE 1 1 W-14 82-065 ra a" "-" " *I" LCD010583RLA06-LT-

Form 9-0034,Rav.0(H&[SP5.2)

NORTHERN STATES POWER CO.

l PRAIRIE ISLAND UNIT _w I TABLE __g,S M og INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

pggE M y__

2 SUS ITEM E ND INSP. REQ'D. . AMT.

SP ITEM INSPECTION GORY ITEM TO BE EXAMINED R. M. EXAM SDEN M h N RE N M.

84.8 B-J (CONT'D)

SAFETY INJECTION ONE - -

IIIGil llEAD A TWO - -

THREE 1 1 SW-6 81-111 SAFETY INJECTION ONE 1 1 SW-17 77-51 ilIGil llEAD B TWO - -

THREE - -

DRAIN LINE ON ONE 1 1 SW-1 77-52

CROSSOVER A TWO - -

TilREE - -

DRAIN LINE ON ONE - -

CROSSOVER B TWO 1 1 SW-1 79-22 TilREE 1 1 SW-8 81-117 REACTOR VESSEL ONE - -

SAFETY INJECTION TWO - -

) LOW llEAD A THREE 1 1 SW-12 81-93 REACTOR VESSEL ONE 1 1 SW-8 77-17 i SAFETY INJECTION TWO - -

LOW HEAD B TilREE - -

84.9 B-K-1 INTEGRALLY WELDED SUPPORTS RESIDUAL llEAT REMOVAL ONE 2 2 F, G 76-18, 19 RETURN B ACCUMULATOR DISCHARGE A ONE 1 1 D1 76-69 re nnear-aero e/se LCD010583RLA06

, , =7

., , '= a' Formi 9-0034,Rev.0 (M&SP 5,2)

TABLE *4' NORTHERN PRAIRIE ISLAND STATES UNIT POWER Cf. a.

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

pggE pgh sus y^g" QUNE g ,p S M INSP. REO'D. AMT. ITEM ITEM INSPECTION GOHY STEM TO BE EXAMINED ER. W. EXAM IDENTI N TIM RE M T M B4.9 B-K-1 (CONT'D)

RESIDUAL llEAT REMOVAL ONE .I 1 F 77-67, 91 ,

TAKE OFF A TWO 1 1 I 78-052, 082, 088 THREE 1 1 K1 81-276, 264, 214 SPRAY TO PRESSURIZER ONE 1 1 K1 77-93, 66 BRANCil A REACTOR VESSEL - - -

SAFETY INJECTION LOW HEAD A & B (6")

CilARGING LINE CVCS - - -

SAFETY INJECTION - - -

IIIGH HEAD A ACCUMULATOR DISCHARGE B TWO 1 1 81 79-46, 20, 36 RESIDUAL llEAT REMOVAL TWO 1 1 11 78-047, 020, 020R TAKE OFF B SPRAY TO PRESSURIZER TWO 1 1 E 79-93, 70, 70R, 33 BRANCil E 80A-56, 92, 59, 59R TilREE - -

E 81-216, 132, 136 AUXILLIARY SPRAY CVCS THREE 1 1 A 82-010, 060 REACTOR VESSEL - - -

SAFETY INJECTION LOW llEAD A & B (2")

SEAL INJECTION A THREE 1 1 I 81-86, 95, 114 vonse e a-sese else LCD010583RLA06

Form 9-0034,Rev.0 (H&SP 5.2)

NORTHERN STATES POWER CO.

PRAIRIE ISLAND UNIT _

TABLE SI.4 1 PAGE 15 OF 21 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING PRESSURE B00 2ARY sue y^,".  % "o ,E ,p S M INSP. REO*n AMT.

HEM ITEM INSPECTION GORY ITEM TO DE EXAMINED MT. EXAM ,IDENT m Tim HEM T M.

B4.9 B-K-1 (CONT'D)

  • i SAFETY INJECTION - - -

HIGilllEAD R i

LETDOWN LINE CVCS - - - -

l SEAL INJECTION 8 THREE 1 1 B1 81-270, 266, 227

RESIDUAL TEMPERATURE - - -

! DETECTOR TAKE OFF i

COLD LEG A B4.10 B-K-2 SUPPORT COMPONENTS REACTOR C0R'E COOLANT A ONE 1 1 Al 77-12 THREE 1 2 A,A 83C-021, 013 2 3 ACCUNULATOR DISCHARGE A - - -

-NONE-RESIDUAL llEAT REMOVAL ONE 4 3 L, 0, Q1 76-82 TAKE OFF A K2-HISSED IN PERION ONE j

i TWO 6 7 A, D, E K2 78-31,32,33,64,64R El, F1, G1 79-5, 4, 6 THREE 6 6 G2, H, II, J1, M,N 81-243,116,100,99

'107, 107R, 109 SAFETY INJECTION - * - -

) llIGil HEAD A SPRAY TO PRESSURIZER ONE 4 4 H.J.L,M 76-83 BRANCH A TWO 4 4 D. A & 8/Cl 78-71, 51/79-7

. THREE 4 3 F,G K 82-003, 013, 018 l

rosene a7 sere etre LCD010583RLA06

_. . 1 i

Form 9-0034,Rav.0 (H&SP 5.2)

NORTHERN STATES POWER CO.

TABLE SI 4 PRAIRIE ISLAND UNIT _ _g PAGE 1A OF 21

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPIE PRFSSilRF BOUNDARY I SUS i HEM E E SP SNSP. REOR AMT. BTEM INSPECTION GORY ITEM TO SE EXAMINED R. M. EXM IDEN W W M RE N M.

B4.10 B-K-2 (CONT'D) l RESISTANCE TEMPERATURE ONE - -

DETECTOR RETURN A TWO 1 1 A 78-067 i THREE I 1 B 83C-020 RESISTANCE TEMPERATURE ONE 1 1 A 72-111 1 DETECTOR TAKE OFF TWO 2 2 D/B 78-65/79-27, 27R COLD LEG A B 80A-108 i THREE 2 2 E, F 83C-018, 017 RESISTANCE TEMPERATURE ONE I 1 A 77-110 DETECTOR TAKE OFF TWO 1 1 8 79-28

HOT LEG A THREE 2 2 C, D 83C-016, 019
SAFlTY INJECTION ONE - -

ilIGH HEAD A TWO -

4 THREE 1 1 A 81-244, 244R i

DRAIN LINE ON ONE 1 1 8 76-84 CROSS 0VER A TWO 1 1 B1 78-050 THREE 1 1 C 81-106 SEAL INJECTION A ONE S 6 D.G,H.J,K.Il 76-85 d

TWO 6 6 C,D,E.P 78-069,059,068,060 A, B/Al 79-23, 24/79-SP2-89 j) TilREE 7 7 E1 L.M N,0,Q,Q1 81-104,103,97,105 98, 218, 224 REACTOR CORE COOLANT B ONE - -

l TWO 1 1 82 00A-125 THREE 2 2 8,8, 2 3 83C-049, 044 ,

4 FOnte97-2474 Sf7, LCD010583RLA06

Form 9-0034,Rev.0 (M&SP 5.2) .

NORTilEF'.N STATES POWER CO.

PRAIRIE ISLAND UNIT. TABl.E Sl.4 1 PAGE 17 OF 21 INSERVICE INS?ECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING PRESSURE BOUNDARY SUB INSP, ITEM E ND HEO'D. AMT. ITEM INSPEC)lON GORY ITEM TO 8E EXAMINED PER. AMT. EXAM IDENTIFICATlON REPORT NO.

B4.10 B-K-2 (CONT'D)

ACCUMULATOR DISCHARGE B ONE I 1 B 76-86 TWO - -

THREE - -

RESIDUAL HEAT REMOVAL ONE 1 -

A - MISSED IN PERI ( D ONE RETURN TWO 2 2 A, B 78-054, 061 THREE 2 2 C, D 82-002, 126 RESIDUAL HEAT REMOVAL ONE 3 4 K.L.M.N 76-88 TAKE OFF B TWO 4 4 A,D,E F 78-53, 30/79-26, 25 TilREE 4 4 G,I,J.N 81-217,226,241,225 SAFETY INJECTION - - -

-NONE-IIIGH llEAD B SPRAY TO PRESSURIZER ONE 3 4 A, B, C, D 76-89 BRANCil B TWO 3 3 Al, D, D1 79-31, 32, 34 TilREE 4 4 F & H, I, J, K 81-133,141,140,138 RESISTANCE TEMPERATURE OhE - -

DETECTOR RETURN B TWO 1 1 A 78-066 TilREE 1 1 8 83C-050 RESISTANCE TEMPERATURE ONE 1 1 8 77-63 DETECTOR TAKE OFF TWO 2 3 C/8/D 78-56/79-35/79-SP2-90 COLD LEG B TilREE 2 2 E, F 83C-027, 051 RESISTANCE TEMPERATURE ONE 1 1 A 77-61 DETECTOR TAKE OFF TWO 2 2 B/C 78-55/79-16 il0T LEG B TilREE 2 2 D, E 82-001, 014 ronne e r-aare spre LCD010583RLA06

Form 9-0034,Rev,0 (H&SP 5.2)

NORTHERN STATES POWER CO. SI 4 PRAIRIE ISLAND UNIT I TABLE 70 E ns INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PI PRESSURE numi BUu._._.51.

1 sus GE44

$^g" To,E ,p S M INSP. REQ *D. AMT. ITEM INSPECTION

,,GQpY ITEM 10 SE EXAMINED P R. AAAT. EXAM 8DENM8 CAT 80N REPOR T NO.

84.10 B-K-2 (CONT'0) a SAFETY INJECTION ONE 1 1 A 76-90 llIGH llEAD 8 TWO - -

) THREE 1 1 C 83C-052 .

4

, pRAIN LINE ON ONE - -

4 CROSS 0VER B TWO 1 1 A 79-SP2-66 .

TilREE -

CilARGING LINE CVCS ONE 6 6 H,I,J,K,L,N 76-91 TWO 6 6 E, D,78-062, 063 A, B, F, G 79-12, 13, 40, 41 THREE 7 7 0. P, Q, Q1 82-004,005,015,016 R, R1, S82-006,006R,017,026

LETDOWN LINE CVCS ONE 2 2 A/C 76-93/77-60 l TWO 2 2 Cl, D 79-SP2-93, 94 l THREE 4 4 E,F,G,H 81-123, 112, 118, 118R, 113 l SEAL INJECTION B ONE 3 3 G/A, B 76-93,/77-82, 109 TWO 3 3 C/B2, Cl 78-57/79-18, 19 THREE 3 3 D, E, El 81-101, 102, 242 l

PRESSURIZER SURGE B ONE 3 3 A, B/C 76-94/77-80 TWO 3 3 E/0, C1 78-072/79-SP2-95, D 95R, 96/80A-57 THREE 4 4 F,G,H,I 83C-074,075,076,077 PRESSURIZER SAFETY - - -

-NONE-LINES A & B ronne a r aers e/7e LCD010583RLA06 l

Form 9-0034,Rav.O (H&SP 5.2)

NORTHERN STALES POWER CO.

PRAIRIE ISLAND UNIT l - bI'4 TABt.E # ' i: ' M INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PI g PRES M guununnu i

}

sus STEM Q GORY

%0",Eg,%,sgM o ,,,,, ,,a.a ,,y, EXM

,,,, ,,,,,,c y ,o,,

ITEM TO BE EXAM 4NED . .

MWWW REMTM B4.10 B-K-2 (CONT'D) 1

! REACTOR VESSEL ONE I 1 Al 76-95 i

SAFETY INJECTION (6"x4") TWO 1 1 A2 79-1 LOW HEAD A & B THREE 1 1 B 83C-099 2

PRESSURIZER RELIEF ONE - -

I LINES A & B TWO 1 1 A 78-037, 036, 036R l THREE 1 1 8 81-139, 139R

), AUXILLIARY SPRAY TO ONE 2 2 B, C 76-96 PRESSURIZER 8 TWO 2 2 D, E 79-SP2-91, 92 ,

THREE 2 2 F, G 82-011, 012 REACTOR VESSEL ONE - -

SAFETY INJECTION (2") TWO 1 1 Al 78-029 LOW HEAD A & B THREE 1 1 A 81-108

) PLO-CAP A - - -

-NONE-PLO-CAP B - - -

-NONE-i B4.11 B-P EXEMPT AND NON-EXEMPT .

  • ALL COMPONENTS PERFORMED BY fDRPNiENTS HYDROSTATTCALLY EXAMINED IN PLANT PERSONNEL j PRESSURE TESTED TO IWA-5000 ACCORDANCE WITH AND IWB-5000 AT END OF TEN IWA-500 AND INTERVAL PLUS SYSTEM LEAKAGE IWB-5000 DURING TEST EACil SCHEDULED REFUELING SYSTEM LEAKAGE I OUTAGE TEST EXEMPT:
RESISTANCE TEMPERATURE DETECTOR-TAKE OFF 1-RC-7A h .... ....... .,,.

3 LCD010583RLA06 i

. . +

  • e Forni 9-0034,Rsv.0 (H&SP 5,2)

NORTHERN STATES POWER CO. TABLE SI.4 PRAIRIE ISLAND UNIT _ 1 PAGE 20 21 OF INSERVICE INSPECTION-EXAMINATION SUMMA 6Y MAJOR ITEM: PIPING PRESSURE BOUNDARY sus HEM $^" T ,E ,p S M INSP.

PER.

REO~a W.

AMT. ITEM INSPECT 40N GORY ITEM TO SE EXAMINEO EXAM MNTINim REN M.

84.11 B-P (CONT'D)

EXCESS LETDOWN LINE A 1-RC-8 1-VC-7 1-VC-9 RESISTANCE TEMPERATURE DETECTOR TAKE OFF 1-RC-78 REACTOR VESSEL CLOSURE HEAD VENT l-RC-36 REACTOR VESSEL CLOSURE IIEAD FLANGE l-RC-9A 1-RC-9B B4.12 B-G-2 PRESSURE RETAINING BOLTING (0ftY SYSTEMS APFLICABLE TO j THIS ITEM ARE LISTED) 1 SEAL INJECTION A ONE 4 4 BOLTS 1-4 9 W-10 76-7 TWO 4 4 BOLTS 1-4 9 W-2 78-081 i 8 RESISTANCE TEMPERATURE ONE 8 BOLTS 1-8 76-12 i DETECTOR RETURN A THREE 8- 8 BOLTS 1-8 83C-022 a

PRESSURIZER SAFETY ONE 12 12 BOLTS 1-12 8010-A l 76-17 i LINE A TWO 12 12 BOLTS 1-12 8010-A l 79-85 j ,

THREE -

12 BOLTS 1-12 8010-A > 82-020, 022 1

1 l

rosens a r.aers e/rs' LCD010583RLA06

'3 l

Form 9-0034,Rav.0 (H&SP 5.2)

NORTHERN STATES POWER CO. TA8l_E SI 4 PRAIRIE ISLAND UNIT _1 _

PAGE 21 21

_OF

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING PRESSURE 800M)ARY SUS ITEM E DE IP INSP. REO'D. AMT. ITEM INSPECTION GORY ITEM TO BE EXAMINED PER. AMT. EXAM IDENTIFICATION REPORT NO.

1 l

l B4.12 8-G-2 (CONT'D)

SEAL INJECTION 8 ONE 4 4 BOLTS 1-4 76-16 THREE 4 4 BOLTS 1-4 81-271 i'

RESISTANCE TEMPERATURE TWO 8 8 BOLTS 1-8 9 W-7 79-14

DETECTOR RETURN B THREE 8 8 BOLTS 1-8 83C-048 1

PRESSURIZER SAFETY THREE 12 12 BOLTS 1-12 (8010-8 l 82-019, 021, 045

. LINE 8 I

l i

1 1 -

1 I

Fonesev-sere e/ve LCD010583RLA06

Fonn 9-0034,Rev.0 (H&SP 5.2)

NORTHERN STATES POWER CO. TABLE-.& .5 PRAIRIE ISLAND UNIT I ,

J INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: REUk CGRE CGG0lHT RTri^3 sue MEM

[^,", T,y,E ,p S M INSP. R E Q'O. AMT. ITEM INSPECTION GORY ITEM TO 8E EXAMINED PER. AMT. EMAM IDENTI N T M RE N M.

85.1 & B-G-1 PRESSURE-RETAINING BOLTS AND I B5.3 STUDS, IN PLACE ( 2 IN. DIA) i FLANGE BOLTS PUMP A ONE 8 8 BOLTS 10 THRU 17 76-26 TWO 8 8 BOLTS 18 THRU 1 78-085 THREE 8 24 BOLTS 1 THRU 24 83C-143 PUMP B ONE 8 8 BOLTS 1 THRU 8 76-75 TWO 8 8 BOLTS 9 IHRU 16 78-085 THREE ITEM 24 BOLTS 1 THRU 24 83C-144 85.2 SEAL HOUSE BOLTING PUMP A ONE 4 4 BOLTS 1 THRU 4 76-76 TWO 4 12 BOLTS 1 THRU 12 78-104, 107 THREE 4 24 BOLTS 1 THRU 12 82-033, 034 PUMP B ONE 4 4 BOLTS 7 THRU 10 76-77 TWO 4 12 BOLTS 1 THRU 12 78-105, 106 THREE ITEM 12 BOLTS 1 THRU 12 83C-031, 039 B5.2 B5.2 & B-G-1 PRESURE RETAINING BOLTS AND B5.3 STUDS ( 2 IN. DIA.)

PUMP B FLANGE BOLTING THREE 24 ** ** BOLTS NOT REMOVEN PUMP B SEAL HOUSE TWO 12 12 BOLTS 1 THRU 12 80A-74 BOLTING (MT ONLY)

THREE 12 24* BOLTS 1 THRU 12 82-056, 057

  • UPPERS AND LOWERS 24* BOLTS 1 THRU 12 83C-029,038,031,039
  • UPPERS AND LOWERS PUMP A SEAL ll00SE - -

24* BOLTS 1 THRU 12 83C-028,035,030,034 BOLTING

  • UPPERS AND LOWERS FOfg.e 07-341s efys LC0010583RLA07

-. . + '

Form 9-0034,Rav.0 (H&SP 5.2)

NORTHERN STATES POWER CO. TABLE S1.5 PRAIRIE ISLAND UNIT I PAGE 2 OF 3 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: REACTOR CORE COOLANT-PUMPS SUS INSP. REO'D. AMT. ITEM ONSPECTION DE IP ITEM PER. AMT. EXAM IDENTIFICATION REPORTh0.

GORY ITEM TO SE EXAMINED B5.4 B-K-1 INTEGRALLY WELDED SUPPORTS PUMP A TWO 3 3 SUPPORT A 80A-88, 88R SUPPORT B 80A-89, 89R i

' . SUPPORT C 80A-99, 99R THREE 1 1 SUPPORT A 81-238 B5.5 B-K-2 SUPPORT COMPONENTS *

  • COINCIDENT WITH SEISMIC BOLTING i PUMP A ONE 1 1 COLUMN 1 & PAD 1 77-131, 1, 146, 148 COLUMN AND TWO 1 1 COLUMN 1 & PAD 2 79-134, 135, 58, 109 ,

LATERAL SUPPORTS 115, 131

THREE 1 1 COLUMN 3 & PAD 3 83C-134, 133, 056 1

PUMP B ONE 1 1 COLUMN 1 & PAD 1 77-131,2,147,149,131 i COLUMN AND TWO 1 1 COLUMN 2 & PAD 2 79-138,139,59,108, LATERAL SUPPORTS 118, 130

, THREE 1 1 COLUMN 3 & PAD 3 83C-135, 138, 053 i B5.6 B-L-1 PUMP CASING WELDS l .' PUMP A - - -

-NONE-fPUMPB THREE 1 1 CASING WELD (PT) A85-001 B5.7 B-L-2 PUMP CASINGS PUMP A & B THREE

  • 1 RELIEF NO. 63 85.8 B-P EXEMPTED COMPONENTS - - -

-NONE-B5.9 B-G-2 PRESSURE RETAINING BOLTING ( 2 IN. DIA.)

'*"""-**"" LCD010583RLA07-LT

~

Form 9-0034,Rsv.0 (H&SP 5.2)

NORTHERN STATES POWER CO. S1.5-PRAIRIE ISLAND UNIT ____ l TABLE _ _

_ _ ? _ _ _ _nE . _ f. .. . _ _

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: RE tunt tuutAni rurwa sus LIEM h*

GORY DE IP INSP.

PER.

REO'D.

AMT.

AMT.

EXAM ITEM INSPECTION 8 TEM 10 BE EXAM 8NED SOENTIFICAT60N REPORT NO.

PUMP FLYWHEELS PUMP A & B ONE 2 *2 PUMP-ll,FLYWHEEi 76-78, 79, 80

. PUMP-12 FLYWHEEL 76-72, 73, 74 .

TWO 2 2 PUMP-11, FLYWHEEL 79-95, 96, 97 PUMP-12 FLYWHEEL 79-86, 87, 88 THREE 2 2 PUMP-ll, FLYWHEEL 83C-061, 062, 063 PUMP-12 FLYWHEEL 83C-058, 059, 060

  • BOTH FLYWHEELS WERE REMOVED AS A RESULT OF MODIFICATION TO THE PUMP LUBRICATION SYSTEM, THE BORE AND KEYWAYS

, WERE P.T.

EXAMINED & THE REMAINING SURFACES WERE M.T. EXAMINED.

U.T. WAS USED

. TO VOLUMET-RICALLY EXAMINE -

THE FLYWHEELS.

(NOTE TEC SPEC

.4.2-1) voa e a B-asse else LCD010583RLA07

Farm 9-0034,Rev.0 (MCP 5.2)

NORTHERN STATES POWER CO. TABLE Sl.6 PRAIRIE ISLAND UNIT I PAGE 1 OF 4 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: VALVE PRESSURE 8OUNDARY SUE , gp 8NSP. RE011 AMT.

ITEM 8NEPECTION ITEM MR. M. EMM MNWGM REMT M GORY STEM TO DE EXAMINED B6.1, B-G-1 PRESSURE RETAINING BOLTS AND - - -

-NONE-86.2 & STUDS ( 2 IN. DIA.)

86.3 -

B6.4 B-K-1 INTEGRALLY WELDED SUPPORTS - - -

-NONE- >

B6.5 B-K-2 SUPPORT COMPONENTS - * -

  • INCLUDED IN TABLE 1.4 UNDER B4.10 B6.6 B-M-1 VALVE B0 Y WELDS - - -

-NONE-B6.7 B-M-2 VALVE BODIES

( 4 IN. NOM. PIPE SIZE)

REACIOR VESSEL THREE 1 1 88438 81-110 SAFETY INJECTION LOW HEAD B RESIDUAL HEAT REMOVAL THREE 1 1 8701A A85-005 TAKE OFF A PRESSURIZER SAFETY THREE 1 1 8010A A85-010 LINE A RESIDUAL HEAT REMOVAL THREE 1 1 8793 A85-008 .

RETURN B ACCUMULATOR DISCHARGE A THREE 1 1 8840A 83C-079 B6.8 B-P EXEMPTED COMPONENTS

  • 100%
  • ITEMS INSPECTED INSPECTED BY PLANT DURING EACH PERSONNEL LEAKAGE TEST

= = "-** *'"

LCD010583RLA08-LT-

-t-

~

j Form 9-0034,Rev.0 (ESP 5.2)

NORTHERN STATES POWE3 CO. SI.6 PRAIRIE ISLAND UNIT TABLE 1 PAGE 7 OF 4 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: VALVE PRESSimF RIMJNn(RY sus "EM M GORY Tog's,%,sgM 4 TEM TO BE EXAM 000E0 M.

,,a.a MT.

wr.

EMm srEM MNTmm NarEcrums l REM N.

86.9 B-G-2 PRESSURE RETAINING BOLTING *

  • NOTE SUPPLEMENT B6.9 AT 3.4.3 ACCCUMULATOR DISCHARGE ONE 16 16 CHECK, 8841A 76-11 LOOP A - 12" THREE 16 16 CHECK, 8840A 83C-122 ACCUMULATOR DISCHARGE TWO 16 16 CHECK, 88418 78-016 LOOP B_- 12" THREE 16 16 CHECK, 88408 82-025 RESIDUAL HEAT REMOVAL ONE 16 16 M.0. GATE, 8703 76-14 RETURif B - 10" RESIDUAL HEAT RDt0 VAL ONE 16 16 H.O. GATE, 8701A 76-8 TAKE OFF A - 8" THREE 16 16 M.0. GATE, 8702A 81-91 RESIDUAL HEAT REMOVAL ONE 16 16 M.0. GATE, 87018 76-6 TAKE OFF B - 8" ONE 16 16 M.0. GATE, 87028 76-6 SAFETY INJECTION TWO 12 12 CHECK, 8842A 79-37 .

HIGH HEAD B - 6" SAFETY INJECTION THREE 12 12 CHECK, 8842B 83C-047 HIGH HEAD B - 6" PRESSURIZER SPRAY THREE 8 8 A.O. GLOBE, PCV-431A 82-008 LOOP A - 3" PRESSURIZER SPRAY THREE 8 8 A.O. GLOBE, PCV-4318 81-137

! LOOP B - 3" 1

I RESISTANCE TEMPERATURE ONE 12 12 GATE, 8001A 76-12

DETECTOR RETURN

{ LOOP A - 3" I .

LCD010583RLA08

.. , e *

' Form 9-0034,R2v.0 (H&SP 5.2)

NORTHERN STATES POWER CO.

PRAIRIE ISLAND UNIT--- TABLE Sl.6 '

__g.

PAGE 3 OF 4 1

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: VALVE PRESSURE BOUNDARY SUS ITEM $

GORY DE IP INSP.

R.

REQ"D.

AMT.

AMT.

EXAM ITEM INSPECTION l lTEM TO BE EXAMINED BDEN M ICA N RNTM.

l B6.9 B-G-2 (CONT'D) l l RESISTANCE TEMPERATURE ONE 12 12 GATE, 80018 76-15

DETECTOR RETURN l LOOP B - 3" l

RESISTANCE TEMPERATURE TWO 2 2 2T58, RC-1-7 79-SP2-87

! DETECTOR TAKE OFF THREE 2 2 2T58, RC-1-6 82-011

! COLD LEG A - 2" RESISTANCE TEMPERATURE TWO 2 2 2T58 RC-1-17 79-15 DETECTOR TAKE OFF THREE 2 2 2T58, RC-1-15 82-024 COLD LEG B - 2" RESISTANCE TEMPERATURE IMO 2 2 2T58, RC-1-9 79-SP2-86 DETECTOR TAKE OFF TWO 2 2 2T58, RC-1-10 79-SP2-86 HOT LEG A - 2" THREE 2 2 2T58 RC-1-Il 83C-046 i

RESISTANCE TEMPERATURE TWO 2 2 2T58, RC-1-13 79-17 DETECTOR TAKE OFF TWO 2 2 2T58, RC-1-12 79-SP2-88 HOT LEG B - 2" THREE- 2 2 2T58 RC-1-14 82-007

) PRESSURIZER RELIEF TWO 12 12 M.0. GATE, 8000A 78-014 1 LINES - 3" TWO 12 12 M.0. GATE, 80008 78-014 THREE 6 6 A.O. GATE, PCV-431C 81-135 j THREE 6 6 A.0. GATE, PCV-430 81-134 j -

REACTOR VESSEL

! SAFETY INJECTION

! LOW HEAD A - 6" ONE 12 12 CHECK, 8843A 76-5 j TWO 12 12 CHECK, 8844A 79-8 i LOW HEAD B - 6" TWO 12 12 CHECK, 8843B 79-2 THREE 12 12 CHECK, 88448 83C-093 l

AUXILIARY SPRAY CVCS - 2" THREE 6 6 A.0. GLOBE, 8143 82-009 1

1 ro== i 1-a. .. .n.

LCD010583RLA08 i

Form 9-0034,Rev.0 (H&SP 5.2)

NORTHERN STATES POWER CO. TABLE Sl.6 PRAIRIE ISLAND UNIT 1 PAGE -4 4 OF INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: VALVE PRESSURE BOUM)ARY SUS fjU EN S M ITEM g INSP. REQ'D. AMT. STEM INSPECTtON G OftY ITEM TO 8E EXAMINED PER. AMT. EXAM IDENTIFlCATION REPOR T NO.

i I

I B6.9 B-G-2 (CONT'D) '

I DRAIN LINE ON TWO 2 2 2T58, RC-1-1 78-015 q CROSS 0VER A - 2" THREE 2 *2 2T58, RC-1-2 81-92 l

I DEAIN LINE ON TWO 2 2 2T58 RC-1-3 79-9 .

! CROSS 0VER B - 2" TilREE 2 2 2T58 RC-1-4 81-119 CHARGING LINE B - 2" TWO 6 6 A.0. GLOBE, 8142 79-3

) LETDOWN LINE 8 - 2" TWO 8 8 A.0. GLOBE, LCV-427 79-11 TWO 2 2 2T58 RC-1-5 79-10 TilREE 8 8 A.0. GLOBE, LCV-428 81-115 4  :

! SEAL INJECTION A - 2" ONE 2 2 2T58, VC-7-18 76-13 SEAL INJECTION B - 2" CNE 2 2 2T58, VC-7-19 76-16 l

l l

i eo. m . - w s . ,.

LCD010583RLA08

. . e e Form 9-0035,Rev.0 (M&SP 5.2)

NORTHERN STATES POWER COMPANY TABLE II j MONIICELLO NUCLEAR GENERATING PLANT PAGE 1 OF 1 j BASELINE COMPARISON CLASS 1 NSP NDE BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM j ISO METHOD IDENT. NO. INDICATIONS INDICATIONS LIMITATIONS l

j REACTOR 1 81.18 CONTROL R00 DRIVE l HOUSINGS PERIPilERAL CRD -

UT CR-17 A85-007 NONE S-1 ID GE0 20-472 S-2 LIMITED DUE TO j 1100 SINGS OD GE0 20% INSULATION i

S-2 ID GE0 50-901 l OD GE0 20%

UT CR-33 A85-006 NONE S-1 ID GE0 25-502 S-2 LIMITED DUE TO

OD GE0 20% INSULATION S-2 ID GE0 20-60%
REACTOR COOLANT PUMPS

! B5.6 PUMP CASING WELDS I RCP #12 CASING WELD 61 PT CASING A85-001 NONE 2 LINEARS LIMITED AT SUPPORT WELD ACCEPTABLE PER LEGS, APPR0X. 7'-2" IWB-3518-2 INACCESSIBLE i t

VALVES j B6.7 VALVE BODIES RilR TAKE OFF A 3 VT 8701A A85-005 NONE NONE NONE RilR RETURN B 18 VT 8703 A85-008 NONE NONE NONE

{ PZR SAFETY LINE A 29 VT 8010A A85-101 NONE NONE NONE i

LCD030585RLA07-LT

' e

- 333333 11 888 6 - 4444 4 3 3 3 33

, 11

,* AA A 8 A

A AA R 77 67 5AA 3 5555 A

S A

7 5

3 01

" , E 115566 12 111 1

6 11 1 B I CCCCCC CI CMM C CCCC C C C I CC

=

I l & RRVVVV RS RRE R RRRR R R R S RB

  • g a

E - - - - - -

222222 22 11 888 6 3333 3 2

2 2 22 .

- 222222 22 11 88"8"8 "6 "3 "3 "3 "3 "3 "3 2 2 "2 "2 "2 P R 0

l R5EmmR5 AA AAAA A & AAA5 A A A A AA I A I

)

W E

I V

4 L

D ) A T W R S E ) D E D Y I W A N A S V E E E E I N C N R L V (

O A E H H R G L C R C C r E R A I E E C I i

A R H Z L E H R D N L E E H E I 4

C C N N R D N V O ( S E O U L T O O I C I S O O I S M E D ( T S C H T S

[

N C E C O O I R F E R F F E R L O F J P N F F J C T O N R O O N G A E I O U E E I N N L K T T K K O I U A Y E A A Y C H T T Y R T T T N R U E A E I A C R F R D D D F A H C H A P T T T A R C A R S S R R R S D

- 1

. S mSAL Q 1

R1C S 00000O0 0 0000 0 00000 0 0 0 0 0 I

T- V

. I E MY LR R

S) A M mM rL S A FI sS A3CDEF A5C AnCD 0 IC 11 1 II 1I 2 3333 4 5SS55 6 7 8 9 1 I - -

ER - - - - - - - - - - - - - - - - - - -

1 I

1 I 1 I 1 I I I I I 1I I I 1 I I I I I I IT Ri 5S5SSSS S 5SSS 5 SSSSS S 5 S 5 S nIAM g 1 I 1 I I I I I 1 I I I 1 I I I I I I 1 I 1 I oPI HS f

AAA AAA 4 - 1333 444 444 - - - 11 11 0

1

- 8 '8 6 4 3 111 11 1 A

T S

  • 4 F

O AAAA A 5 R5 67 6 55 5 0 3 5 B I R t 111 AA3 553 12 2 11 1 6 8 2222 12 - 12 -

. I

- - - - - - - C - - C - - - - - - - - - - - -

I 2 CCCC CCR CCR C1 1 HC C c C VVVV RR - BR - 35 5 BR R s 3 E - - - - - - h - - - - - - - - - -

M 88 3 2 LE B

AA h222 t

917 232 911 232 22 11 0

1 6 .

TP

" "h " " h" " "

2

&" " " " "9"11 91 1 - - - 22 "0 "8 "8 "8 "6 "3 "2 222 232 232 11 1 1

h" l

1 P

O AAAAA AAA aEa A A A 53 3 BBR 5 a a D

1 C

H l

I ) T W L D

l E

G O

B ) D S I V N W E

A E

Y I G S T N I H L L I V R A O S E H O R B U L C L C C E R A E r N O E l L

E E H E A R i l

N 5

C

(

C N L l

i W

l l

C E

N N D T T A A Y S E O L O N N L E L I C I O N F S F D ( T C O A A C M I L L R F E F 0

T O O A A A N F 0 C O O O N F J N R O E C C P P F T R O H H H A U E I U E J

R R U U U L T K T K N P P U E A Y E A I O O P R T T R T T T M E L C C . . . U F D D A A A C R R E C. C. C. C l l A T T E E R R R A l

E i

R S R R S R R

)

Q N O

I R1 S 0 0 0 0 0 0 0 000 0 0 0 E I 00000 T V

. WI IMYR E

R L

S) A E

T AN -

awl T!S l

A8 SS A8CD 1l1 l 1 2 3 4 5 6 7 8 999 0 1 2 IC 1 1 1 1 1 1 1 1 2 2 2 N I 1l1l1 1 1 RER B - - - - - -

I 1

1 I 1 1 1 I 1 I I I EJT 1 I I I 1 I S S S S S SS5 S S S l

i RE SSSS5 S S I 1 1 1 I 1 I I I 1 1 lI I M 1 I I I 1 I I RAG

. ORS

_NPI i' 1 ) 4 l  ; '

i e

TmE m

_ s,,, _ . '

PRAIRIE ISLAND LNIT 1 IflFR;TRIC SitHARY II I N # E MbGIER NL&B 1S1-23 0 RTD TAKEOFF HOT LEC B 2" 2-BC-75 3 151-24 0 SAFETY INJECTION HICH HEAD 5 2" 2-SI-355 3

! 151-25 0 CROSSOVER DRAIN B 2" 2-RC-105 3 i 5 2" 2-RC-115 3 ISI-26 0 CVCS LETDOWN -

R 2" 2-RC-12 3 i ISI-27 0 SEAL INJECTION (CENERAL VIEW) B th"&2" - -

! ISI-27A 0 B 1h" 1\-VC-215 1 151-278 0 5 2" 2-VC-21B 1

Ist-27C 0 a 2" 2-VC-213 1 1S1-28 0 PRESSURIZER SURCE R 10" 10-RC-4 10 l ISI-29 0 PRESSURIZER SAFETY A 6" 6-RC-20A 6 5 6" 6-RC-20B 6 i

i 1S1-30 0 REACTOR VESSEL SAFETY INJECTION A 4" 4-RC-14A 5

! A 6" 6-RC-14A 6 A 6" 6-SI-25A 6 l 5 4" 4-RC-145 5 B 6" 6-BC-145 6 l 8 6" 6-S1-255 6 ISI-31 0 PRESSURIZER RELIEF A&R 3" 3-EC-21 4, j ISI-32 0 AUXILIARY SPRAY -

2" 2-RC-19 3 J -

2" 2-VC-4 3 151-33 0 REACTOR VESSEL SAFETY INJECTION A 2" 2-SI-24A 3 a 2" 2-51-24B 3 l ISI-34 0 R.C. PUNP R FLANCE ROLTING B - -

l .

7 1

- 6 S 1

- - D - - - / - - -

) A A A 1 5 5 6 6 6 6 5 T 1 2 S 2 2 S

4 p

o A 3

C 3

e I R 1 1 I

- C C I 4 E 3 E p - -

6 6 .

Lg

. . B A

Tp '

1 6 '6 P R 0 - - - & - - A R - - -

B 5 - - -

A I

A S

R E S H E S L A Z W Z G 0 N D C N I N E F R T A I N L T , E R

E G

I T O . L D I L E N S B S O A A D S T B E E G Y U l R N H L S G l N A C E N N L H W E A E O D X R E R I S . E R I N C E

. O L S S U T A X L U L U DA E T L S Z r O E D O S Y A E O Z J C L

i H E U H O T E H L 0 H T O L I I T S C N B L W S C C CF E S A H A S I F R E O Y L L LE LT A O I N L L LN E L S T I

W E E EO

. E S F E E EH EN S SD SI F S S SC SE A E O S SL ST 0 R R S S S T SD R R R V D 0 E EA EI E E E I T E EE EA E E V VW VT P P V V VP V Z Z N T N H H l

i I I E A L R RD RE U U R R RD RC R R C R P P O OA OT U U E S A A O OA OI P P O S H N S C C T TE TR

+

T T TL TA S E C CH CO C C CC CP S S A E - -

A A A A A A A E E E C C O O C. C. E E R R T E X L L E E E E E S R E P P R R R R R R R R R P P

. )

G N

(

l R1 S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E I

, WT V OI E PNY LR R

S E ED TNM AAl TLS SS 8 9 0 1 2 3 4 5 6 7 8 9 0 IC 5 6 7 4 4 4 4 4 4 4 4 4 5 N I 3 3 3 3 3 4 RER - - -

I I

1 I I I 1 1 I I 1 1 1 5

EIT l

1 I S

I S S S 5 S S S 5 5 S S 5 5 l

iI Rt 5 1 I I I I 1 I I I 1 1 I I 1 1 1 KAa DHS

- NPI

_ ,1 A A ,,--.~ _,--6 a.-- +a 4 D ,e.- s-o m-- o a - -- a-- .&_m -

< 0 l

t i

APPENDIX B ASME CLASS 2 EXAMINATIONS l

O 9

L l

l I

J

= = . e Farm 9-0034,R2v.0 (H&SP 5.2)

  • NORTHERN STATES POWER CO. TABLE S2.1.2 PRAIRIE ISLANO UNIT I .

PAGE 1 OFI INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM; PRESSURE VESSELS - ACCUMULATORS

.o.

ITEM g^= rassagyja PER.

.Eo a AMT.

AMr.

EXAM

.1EM EDENTIF8 CATION

. ,Ec1,0.

HEPOR T NO.

GORY ITEM TO SE EXAM 4NED

1.1 C-A CIRCUMFERENTIAL BUTT WELDS *
  • j (3 AREAS EQUALuY DIVIDED)

! ACCUMULATOR NO. 11 WELD 6- THREE 20% 100% W-6 A85-002, 003, 004 ACCUMULATOR NO. 12 -

i

1.2 C-B N0ZZLE TO VESSEL WELDS ACCUMULATOR NO. 11 - - -

ACCUMULATOR NO. 12 - - -

i :1.3 C-C INTERNALLY WELDED SUPPORTS i

l ACCUMULATOR NO. 11 - - -

, ACCUMULATOR NO. 12 THREE 24 24 82-115 i

i I

l 1

  • 4 4

renes ar-aese etre l LCUO10583RLA10-LT

s .. . * '* *'

I Farm 9-0034,Rav.0 (H&SP 5.2)

NORTilEHN STATES POWER CO. S2,2.5 YABLE j PRAIRIE ISLAND UNIT 1 PAGE 1 OF 4 l INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIRING-INIEGRALLY ELDED SUPPORI ,

i sus E AM E S EM

,OH p mse. REQ'R AMT.

1 " cOHy

^MT.

4 TEM SNSPECilON arEM iO eE Ex4MmEn PER- EXAM 8DENTW4 CAT 60N HEPOHfMO.

C2.5 C-E-1 INTEGRALLY WELDED SUPPORTS 1

l MAIN STEAM A 30-MS TWO 1 1 G 79-38, 39 TilREE 2' 2 C, E 82-049.098,117,124 t MAIN STEMI B i 30-MS-2 TWO 1 1 8 79-121, 124

! TilREE 1 1 F 81-149 l

l . MAIN STEAM A l RELIEF HDR, 30-MS-1 - - -

i HAIN STEAM 8

! RELIEF 10R, 30-ilS-2 TWO 1 1 L 80A-27, 28 MAIN STEMt A i 31-MS-1 TWO 1 1 I 80A-30 MAIN STE#t 8 ONE 1 1 11 77-81

, 31-HS-2 TilREE 2 2 J. N 81-212,212R,176,213 MAIN STE#1 A

. 6-ils-1 TWO 1 1 K 80A-II, 22 MAIN STEN 1 8 6-itS-2 - -

MAIN STEMI A 32-MS-1 TilREE 1 1 A 83C-100, 064 MAIN STE#1 8 32-MS-2 TWO 1 1 D 80A-64, 83 eo. .u-u1..n.

LCD010583RLA17 >

1 4 ..*

Forun 9-0034,R2v.O (H&SP 5.2)

NORTHERN STATES POWER CO. S2.2.5 PRAlHIE ISLAND UNIT I TABLE.

PAGE Z 9 j OF INSERVICE INSPECTION-EXAMINATION'

SUMMARY

MAJOR ITEM: PIPING,TRTEURALIT wttutu suPPOR1 l SUS E SC INSP, HEO*0. AMT. 8 TEM

8 TEM INSPECT 60N COHY ITEM 10 SE EXAM 4NED PER. MT. ExM OENTI N TIM HEPW M.

j C2.5 C-E-1 (CONT'D)

FEE 0 WATER A -

16-FW-12 THREE 2 2 P, U 81-173, 194,153,152 16-FW-13 TWO 9- 9 Q 79-122, 132 Q,R,S 79-SP2-3/35,36,37 i T. U 79-SP2-3/38,38R,42

~

i V, W 79-SP2-3/41,40 l X,QQ 79-SP2-3/39,39R,34 T, X 80A-72, 73, 29, 32

~

l FEEDWATER B 16-FW-15 ONE l- 1 K, LL 77-14, 77-62 16-FW-16 IWO 8 8 N, D. P, Q 79-SP2-46,50,47,44 i R S L LL 79-SP2-43,48,49,45

TilREE 2 2 P. S81-151, 150 i

REFUELING WATER-STORAGE i TANK DISCHARGE I 12-SI-4 TWO 1 1 C 80-69, 75 i 10-51-8 TWO 1 1 0 80-70, 76 j TilREE I 1 E 82-073, 080 4

j CONTAINMENT SUMP B 1 . DISCilARGE LINES -

{ 14-SI-33A - - -

4 14-SI-338 - - -

ALTERNATE CONTAINMENT l SPRAY PUMP SUCTION -

6-Ril-10A BRANCH 1 TWO 1 1 8 80-62, 63 j 6-Ril-108 l BRANCH 1 TilREE 1 1 0 81-18, 16, 16R l

i von,e ,s-asus esse i

LC0010583RLA17

3 .,.

.' F Farm 9-0034,Rav.0 (H&SP 5.2)

NORTilERN STATES POWER CO.

PRAIRIE ISLAND UNIT TA88.E_ S2.2.5 I PAGE 3 OF 4 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-INTEGRALLY WELDED SUPPORI EXAM COMPONENT OR SYSTEM 4 EM E- A .

y E $

gI O E A ND E . IDENT T8084 H POH C2.5 C-E-1 (CONT'D) 4 RESIDUAL llEAT REMOVAL DISCllARGE

) , 6-Ril-10A

! BRANCil 2 TWO 1 1 L 80-79, 102 i 6-Ril-108 j BRANCil 2 TWO 2 2 I, J 80-84, 85/81-59, 57 TilREE I 1 11 83C-094 8-Ril-7A TilREE 1 1 8 82-075, 079

, 8-Ril-7B TWO 1 1 A 80-28, 30, 30R TilREE 1 1 C 83C-095 j

10-Ril-11 DNE I 1 S77-120

, TWO 1 1 Q 79-98, 99

, TilREE 1 1 P 83C-097, 107 8-Ril-9A TilREE 1 1 E 82-074, 078

{ 8-Ril-9B TWO 1 1 V 80-26, 27, 27R I,

RESIDUAL llEAT REMOVAL SUCTION i -

10-Ril-3 TWO 3 3 A 79-78, 84, 84R F, G 80-90, 91.91R,68,77 A 80A-58, 82, 82R TilREE 2 2 0 82-058, 059 i B1 83C-101, 041 8-Ril-4A TWO 1 1 0 80-80, 100 i

8-Ril-4B - - -

ronnear aers afra 4

LCD010583RLA17 4

4 , a ,

Form 9-0034,Rav.O (M&SP 5.2)

NORTHERN STATES POWER CQ. TABLE S226 1 4

' PRAIRIE ISLANO UNIT PAGE OF 4 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-7NTEGRAELY N'5UPPORT!

. sus MEM M GORY j,73,E y S M l TEM TO BE EXAM 8NED INSP.

PER.

REO*R AMT.

AMT.

EMAM 8 TEM IDENTIF 4CATlON 8NSPECTION REPORT NO.

C2.S C-E (CONT'B)

! 12-RH-5A TWO 1 1 Q 80-61, 64 1

12-RH-5B THREE il 1 B 81-52, 2 SAFETY INJECTION

! PUMP SUCTION i 8-SI-18 TWO 1 1 A 80-108, 109 THREE 2 2 B, J 81-37, 38, 48, 49

! 6-SI-13A TilREE 1 1 E 81-15, 19 12-51-11 TilREE 1 1 C 81-36,35,35R,35R1 ACCUMULATOR DISCHARGE LINES

, 12-SI-28A ONE 1 1 C 77-32 REACTOR VESSEL SAFETY INJECTION 6-SI-25A TWO 1 1 A 79-29, 104, 104R A (REPEAT) 80A-55, 60 6-SI-25B ONE 1 1 F 77-21 THREE 2 2 I 82-062, 062R, 063 .

F 83C-040, 098 SAFETY INJECTION FROM RilR 6-SI-10A .

THREE 2 2 1, J 82-071,072,077,085

~

RilR PUMP SUCTION 12-RH-6A THREE 1 1 W 81-50, 56 12-RH-6B - - -

ro. ir-a....n.

LC0010583RLA17-LT -

c- ,

s . = ,

Form 9-0034,Rav.0 (M&SP 5.2)

NORTHERN STATES POWER CO. TABLE S2.1.2 PRAIRIE ISLAND UNIT I PAGE 1 OF1 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PRESSURE VESSELS - ACCUMULATORS SUS INSP. R EQ*D. AMT. STEM

. STEM E DE F INSPECTION GORY STEM TO SE EXAMINED ER. MT. EXAM SOENT m itM REMT W.

1.1 C-A CIRCUMFERENTIAL BUTT WELDS * *

(3 AREAS EQUAL'.Y DIVIDED)

ACCUMULATOR NO. 11 WELD 6 THREE 20% 100% W-6 A85-002, 003, 004 ACCUMULATOR NO. 12 -

1.2 C-B N0ZZLE TO VESSEL WELDS .

ACCUMULATOR NO. 11 - - -

ACCUMULATOR NO. 12 - - -

1.3 C-C INTERNALLY WELDED SUPPORTS ACCUMULATOR NO. 11 - - -

ACCUMULATOR NO. 12 THREE 24 24 82-115 I

ro mme sr-sere e/re LCD010583RLA10-LT

'~

s a e v Forus 9-0034,Rev.0 (H&SP 5.2)

NORTifERN STATES POWER CO.

PRAIRIE ISLAND UNIT TABLE S2.2.5 1

PAGE 1 OF 4 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-INTEGRALLY WELDED SUPPORTS X

SUS ITEM SNSP. REO*D. AMT. ITEM INSPECTION HY ll M O XA NED ER. MT. EXM IDENTI N T m HE N M i

C2.5 C-E-1 INTEGRALLY WELDED SUPPORTS MAIN STEAM A 30-MS TWO 1 1 G 79-38, 39 THREE 2 2 CE 82-049,098,117.124 MAIN STEM B I

30-MS-2 TWO 1 1 B 79-121, 124 81-149 THREE 1 1 F 1

! MAIN STEAM A RELIEF HDR, 30-MS-1 .- - -

MAIN STEAM B RELIEF HDR, 30-11S-2 TWO 1 1 L 80A-27, 28 MAIN STEAM A 31-MS-1 TWO 1 1 I 80A-30 MAIN STEM B ONE 1 1 H 77-81 31-MS-2 THREE 2 2 J. N 81-212,212R.176,213 MAIN STEM A

. 6 - 11S - 1 TWO 1 1 K 80A-11, 22 MAIN STEAM B 6-MS-2 - - -

MAIN STEM A 32-MS-1 THREE 1 1 A 83C-100, 064 MAIN STEM B 32-MS-2 TWO 1 1 0 80A-64, 83 ronne s v-aere elve LCD010583RLA17

Forni 9-0034,Rav.0 (H&SP 5.2)

NORTHERN STATES POWER CO. S2,2.5 TABLE PRAIRIE ISLAND UNIT L 'PAGE 2 OF 9 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-INTEGRAI1Y WEEDED ~ SUPPORTS Sue NE" E NO INSP. REO*D. AMT. ITEM GORY INSPECTION l ITEM TO BE EXAM 4NED PER. MT. EXM IDENT N ilm REMT NO.

C2.5 C-E-1 (CONT'D)

FEEDWATER A 16-FW-12 THREE 2 2 P', u 81-173, 194,153,152 16-FW-13 TWO 9 9 Q 79-122, 132 Q,R,S 79-SP2-3/35,36,37 T, U 79-SP2-3/38,38R,42 V, W 79-SP2-3/41,40 X,QQ 79-SP2-3/39,39R,34 T, X 80A-72, 73, 29, 32 FEEDWATER 8 16-FW-15 ONE 1 1 K, LL 74rl4, 77-62 16-FW-16 TWO 8 8 N, 0, P, Q 79-SP2-46,50,47,44 R, S. L. LL 79-SP2-43,48,49,45 THREE 2 2 P, S81-151, 150 t

i REFUELING WATER STORAGE TANK DISCHARGE 12-SI-4 TWO 1 1 C 80-69, 75 1 10-SI-8 TWO 1 1 0 80-70, 76

\

TilREE 1 1 E 82-073, 080

) CONTAINMENT StiMP B

. DISCilARGE LINES 14-SI-33A - - -

14-SI-338 - - -

t

, ALTERNATE CONTAINMENT SPRAY PUMP SUCTION 6-RH-10A BRANCH 1 TWO 1 1 8 80-62, 63 6-Ril-108 BRANCH 1 THREE I 1 D 81-18, 16, 16R FOR,4 0 7-24 74 ef 78

.LCD010583RLA17

, , e <

Form 9-0034,Rev.0 (H&SP 5.2)

NORTi1ERN STATES POWER CO. TABLE S2.2.5

- PRAIRIE ISLAND UNIT 1 PAGE 3 OF 4 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-INTEGRALLY WELDED SUPPORTS E

508 INSP. REQ'D.

ITEM E AMT. ITEM INSPECTION GOftY ltEM 10 SE EXAM 4NED PER. AMT. EXAM 8DENTINTim RE m i M.

C2.5 C-E-1 (CONT'0)

RESIDUAL HEAT REMOVAL DISCilARGE 6-Ril-10A ..

BRANCil 2 TWO 1 1 L 80-79, 102 6-RH-108 l BRANCH 2 TWO 2 2 I, J 80-84, 85/81-59, 57 THREE 1 1 H 83C-094

8-Ril-7A THREE 1 1 h 82-075, 079-l l 8-Ril-78 TWO 1 1 A 80-28, 30, 30R l THREE I 1 C 83C-095 10-RH-11 ONE 1 1 S77-120 TWO 1 1 Q 79-98, 99  !

THREE 1 1 P 83C-097, 107 8-Ril-9A THREE 1 1 E 82-074, 078 8-Ril-98 TWO 1 1 V 80-26, 27, 27R RESIDUAL HEAT REMOVAL SUCTION 10-RH-3 TWO 3 3 A 79-78, 84, 84R F, G 80-90, 91,91R,68,77 A 80A-58, 82, 82R TilREE 2 2 0 82-058, 059 B1 83C-101, 041 8-RH-4A TWO 1 1 0 80-80, 100 8-Ril-4B - - -

I won .nn, n,

Form 9-0034,Rav.0 (M&SP 5.2)

NORTHERN STATES POWER Cg.' TABLE S2.2.5 PRAIRIE ISLAND UNIT E 4 OF 4 INSERVICE INSPECTION-EXAMINATION

SUMMARY

. MAJOR ITEM: P G-IMILGRALLY WELDED SUPPORTS SUS INSP. R EO'D. AMT. ITEM INSPECTION T N DE 8P ITEM PER. AMT. EXAM IDENTIFICATION GORY ITEM TO SE EXAMINED REPORT NO.

02.5 C-E-1 (CONT'ft) 12-RH-5A TWO 1 1 Q 80-61, 64 12-RH-5B THREE 1 1 B 81-52, 2 SAFETY INJECTION PUMP SUCTION '

8-SI-18 TWO 1 1 A 80-108, 109 THREE 2 2 B, J 81-37, 38, 48, 49 6-SI-13A THREE 1 1 E 81-15, 19 12-SI-11 THREE 1 1 C 81-36,35,35R 35R1 ACCUMULATOR DISCHARGE LINES 12-SI-28A ONE 1- 1 C 77-32 REACTOR VESSEL SAFETY INJECTION 6-SI-25A TWO 1 1 A 79-29, 104, 104R A (REPEAT) 80A-55, 60 6-SI-25B ONE 1 1 F 77-21 THREE 2 2 I 82-062, 062R, 063 .

F 83C-040, 098 SAFETY INJECTION FROM RHR ,

6-SI-10A THREE 2 2 I, J 82-071,072,077,085 RHR PUMP SUCTION 12-RH-6A THREE 1 1 W 81-50, 56 12-RH-6B - - -

roa=ir-un one LCD010583RLA17-LT.

Form 9-0035,Rev.0 (H&SP 5.2) j NORTHERN STATES POWER COMPANY TABLE II MONTICELLO NUCLEAR GENERATING PLANT PAGE 1 OF 1 BASELINE COMPARISON CLASS II NSP NDE BASELINE REPORT BASELINE ISI* EXAMINATION COMPONENT / SYSTEM ISO METHOD IDENT. NO. INDICATIONS INDICATIONS LIMITATIONS ACCUMULATORS C1.1 CIRCUMFERENTIAL j BUTT WELDS ACCUMULATOR #11 86 UT W-6 A85-002 NONE NONE SWEEP-0-LET AT 7.5' & 2-3/4" UPSTREAM l

86 UT A85-004 S-1 ID GE0 2001 SAME AS A80VE ID GE0 45%

ID GE0 1301 S-2 ID ROLL 40%

S-3 SPOT 20%

S-4 SPOT 420%

86 UT A85-003 S-1 SPOT 0 2.2' SAME AS AB0VE

, 25% ID CLAD

S-2 SPOT 0 3" 25% ID CLAD i

l i

i LC0030585RLA06-LT

+ . . .

e *e .

HORTilERN STATES POWER CO.

PitAlklE ISI.AND UNIT I PACE I 0F 3 ISutlETK!C SUttlAl(Y - Cl. ASS 2 TAul.E III HEVISIOtt COMICHENT OR SYSTEH LOOL' I; il LR

! AH0Akl f.il 1 S 1-4'] 0 STEAH CENERA10RS A&B - -

ISI-51 0 HAlli STEAH (CENERAl. VIEW) A - - -

ISI-SIA 0 A 32" 32-HS-! NO l ISI-51u O A 34" 31-HS-1 24 30" 30-HS-1 23 6" ,6-HS-1 7 ISI-52 0 FEEDWATER (CEHERAI. VIEW) A - - -

ISI-52A 0 A 16" 16-Hi-13 13 1S1-528 0 A 16" 16-Hi-8 13 A 8" 3- A F-I l NO _

ISI-53 0 MilR PUHP A SUCTION (WEl.DS) A 10" 10-kil-3 2'2 151-54. O EllR PUHP A SilCTION (llANCERS) A 8" 8-kil-4 A 29 i 8" 8- Kil-5 A 29 I A

A . 12" 12-kil-5A 32  !

A 12" 12-Hil-6 A 32 A 10" 10-SI-9A HG ISI-55 0 kilR PUtlP A DIScilAkCE (WEl.IIS) A 8" 8-Ril-7A 29 158-56 (4 Milk l'UHP A DISCilARCE (llANCERS) A 8" 8-Hil-9 A 29 A 6" 6-kil-80A 27 A 6" 6-SI-10A 27 i A 6" 6-S I-l ull 6 1S8-68 0 HAlH STEAH (CENERAl. VIEW) N - - -

ISI-6HA 0 B 32" 32-HS-2 It) 151-6811 0 5 31" 31-HS-2 24 30" 30-HS-2 23

- 6" 6-HS-2 7 ISI-69 0 FELIMAATER (CENERAL VIEW) B - - -

I S I -69 A 0 R 86" 16-ni-16 13

'"'-" " a *

't:: 8tly:l! od "_

. e *

  • HORTilElut STATES IUWl'R CD.

PRAIRIE ISI.AHil UNIT 1 PACE 2 0F 3 ISune l'k1C Siste ANY ha III I ' -

COHitteElfr OR SYSTEH I.00P St N j,,

u , 3 AND k ISI-76 0 kilM PUHP B SUCTION (WEl.DS) B 8" 8-kil-4 B 29 ISI-77 0 kilu PUNP R SUCTION (llANCENS) R 8" 8-Hit-51 29 R 12" ( 2- kil-58 32 5 12" 12-R:: 6 11 32 5 10" 10-SI-9u 22 ISI-78 0 Bilk PUHP R DISCilARCE (WEl.DS) R 8" 8-kil-78 29 151-79 0 kilM PUHP b tilSCllARCE (IIANCENS) B 8" 8-kil-9u 29 l 5 6" 6-kil-lon 27 5 10" 10-kil-! ! 22 3 6" 6-kil-12 NO 151-80 0 REFUEL.ING WATER STORACE (WEl.DS) -

14" 14-S1-1 NO TANK DISCilANCE 12" 12-SI-3A .33 ISI-81 0 REFUEL.lHC WATER STORACE (llANCENS) 12" 12-St-3B 33 ,

TANK DISCalARCE 12" 12-SI-4 33 10" 10-St-8 31

, 12" 12-S1-11 NO ISI-82 O SAFETY INIECTION PUHPS SUCTION (UEl.DS) -

12" 12-SI-Il NO ISI-83 0 SAFETY IN1ECTION PittlPS SUCTION (llANCERS) 6" 6-SI-13A NO 6" 6-SI-838 28 8" 8-S1-17 30 8" 8-SI-18 30 ISI-84 0 bOMIC ACill SilPPl.Y -

8" 8-SI-18 NO 151-85 0 ACCHttil.ATOR DIScalARCE (UEl.DS) A 12" 12-St-28A Il iSI-#b 0 ACCUtillt.ATUR lilSCllANCE (llANCEHS) A I2" 12-SI-29A II E 12" 12-SI-28u il B 12" 12-SI-29u 11 4

u e . . .

. . . =

HOR 111EHH STATES POWCK G).

PHAlklE ISI.AND UNIT I PACE 3 0F 3 ISullE1 HIC SUHelAny TAbl.E III

" ' I.I H U - CAI..

HSP ISO REVIS10H CollPONENT ON SYSTEH I.00P SIZE HUHilER STANDAkin IAlHBER 1S1-87 0 CONTAINHENT SUHP R DISCllARCE (WEl.IIS) A 14" 14-SI-33A HQ 151-88 0 CONTAINilEHT SiltlP R DIScilARCE (IIANGERS) A 12" 12-SI-34A HG B 14" 14-S I-3 3tl NO E 12" 12-SI-3416 32 151-89 0 NEACTOR VESSEI. SAFETY INJECTION (UEl.DS) A 6" 6-SI-25A 6 ISI-90 0 NEACTok VESSEL SAFETY IH.IECTION (llANGERS. R 6" 6-SI-2 Sin 6 ISI-91 0 Al.TEHNATE CONTAlHilENT SPRAY (WEl.DS) A 6" 6-Hil-IDA 27 PullP SurTION R 6" 6- kil- 8 08 HO ISI-92 0 AI. TERNATE CONTAINHENT (llANCERS)

SPRAY PUHP SUCTI(Mi o

O e

d 9

.m, a l

. l APPENDIX C '

SEISMIC BOLTING EXAMINATIONS e

h e

l i

Form 9-0034,Rav.0 (H&SP 5.2)

TABLE SB NORTPERN STATES POWER Cg.

PRAIRIE ISLAND UNIT.. PAGE I OF #

, INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: SEISMIG BULOING SUS INSP. R EQ'D. AMT. BTEM INSPECTION ITEM E DE IP GORY STEM TO BE EXAMlNED PER. AMT. EXAM- IDENTIFICATION REPORT NO.

N/A N/A STEAM GENERATORS STEAM GENERATOR N0. 11 UPPER RING GIRDER (SNUBBER PINS) ONE 2' 2 SNUBBER 1 77-132, 4-TWO 2 2 SNUBBER 2 79-117 TWO 8 8 SNUBBER 1 THRU 4 80A-115 THREE 4 4 SNUBBER 1 THRU 4 82-128 UPPER RING GIRDER ONE 5 5 TOP R0W 77-3 ,

(SNUBBER WALL BOLTS) TWO 5 5 CENTER R0W 79-63 TWO 15 15 ALL BOLTS 80A-111 i THREE 5 5 BOTTOM R0W 82-132 UPPER RING GIRDER ONE 8 8 TOP R0W ON GIRDER 77-4 (SNUBBER WALL BOLTS) TWO 8- 8 TOP R0W ON WALL- 79-64 TWO 32 32 ALL BOLTS 80A-114, 116 THREE 16 16 BOTTOM R0W ON WALL 82-105 UPPER RING GIRDER TWO 30 30 PAD 1 THRU 4 80A-119 (WALL BOLTS) THREE 5 5 PAD 3 82-130 UPPER RING GIRDER TWO 40 40 PAD 1 THRU 4 80A-117, 118, 118R, 122 .

(RING CONNECTING BOLTS) THREE 40 40 PAD 1 THRU 4 81-267, 268, 268R UPPER RING GIRDER THREE 2 2' SGH-1, 2 A85-009 (SPRING HANGER)

COLUMN PINS ONE 2 2 COLUMN 1 77-130 i TWO 2 2 COLUMN 2 79-132, 133 TWO 8 8 COLUMN 1-4 TOP & 80A-86, 95 BOTTOM

! THREE 4 4 COLUMN 3 & 4 83C-136, 139 l

l-l ro== n un era LCD010583RLA21-LT.

1

Form 9-0034,Rev.0 (H&SP 5.2)

NORTHERN STATES POWER CO.

PRAIRIE ISLAND UNIT l TABLE-- b0 -

PAGE 4 #

1 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: SEISMIC BULTING OF 508

'TE " E. DE OP INSP. REQ'O. AMT. ITEM cony EXAM 4NSPECTION l

irEM TO BE EXAMINED .

.- IDENTI N T M RE N K N/A N/A (S.G. NO. 11. CONT'D) 4

, BASE ANCHOR 80LTS' ONE 8 8 BASE OF COLUMN 1 77-4 TWO 8 8 BASE OF COLUMN 2- 79-56 TWO 32- 32 BASE OF COLUMN 1 80A-ll3

THRU 4 ~

THREE 16 16 BASE OF COLUMN 3 82-109

AND 4 TOP COLUMN ONE 4 4 TOP 0F COLUMN 1 77-4 I

CONNECTING BOLTS TWO 4 4 TOP 0F COLUMN 2 79-111

TWO 16 16 TOP 0F COLUMN 1 80A-124 THRU 4 TilREE 8 8 T0P 0F COLUMN 3&4 83C-125, 129 a'
  • SUPPORT PAD 6 6 ONE 3) COL.383) COL.4 77-128 Hell-00ll SCREWS TWO 6 12 COLUMNS 1 AND 2 79-113, 114 TWO 24 24 ALL HELIC 0lt SCREI S 80A-140 THREE 24 24 . ALL HELIC 0ll SCREI S81-260 12 COLUMN 3 & 4 83C-128, 130 i LOWER LATERAL ONE 14 14 PAD 1 77-4 i

' SUPPORT ANCHOR TWO 8 8 PAD 3 79-106 BOLTS TO WALL TWO 42 42 PAD'l THRU 4 80A-120

THREE 20 28 PAD 2, 3, & 4 83C-088 LATERAL SUPPORT ONE 4 4 FIXTURE 1 77-4 WALL BOLTS TWO 4 4 FIXTURE 2 .79-107 TWO 12 12 FIXTURE 1 THRU 3 80A-120 THREE 4 4 FIXTURE 3 83C-089 STEAM GENERATOR NO. 12 UPPER RING GIRDER ONE 2 2 SNUBBER 1 77-3, 132 (SNUBBER PINS) TWO 2' 2 SNUBBER 2 79-116 TWO 8 8 . SNUBBER 1 THRU 4 80A-133 THREE 4 4 SNUBBER 1 THRU 4 82-127 FostM 3 7-24 74 4/76
  • LCD010583RLA21

Form 9-0034,R v.0 (M&SP 5.2)

NORTHERN STATES POWER CO. TABLE -

PRAIRIE ISLAND UNIT I ,

OF INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: SE N W ____

sus HESA E E IP SNSP. REQ *D. AMT. BTEM INSPECTION GORY ITEM TO BE EXAMINED PER. AMT. EXAM 4DENTIFICATION REPOR T NO.

N/A N/A (S.G. NO. 12 CONT'0)

UPPER RING GIRDER ONE 5 5 TOP R0W 77-4 (SNUBBER WALL BOLTS) TWO 5 5 CENTER R0W 79-62 TWO 15- 15 ALL BOLTS 80A-135 THREE 5 5 BOTTOM R0W 82-131 UPPER RING GIRDER ONE 8 8 TOP R0W ON GIRDER 77-3 (SNUBBER BOLTS) TWO 8 8 TOP R0W ON WALL _ 79-65 TWO 32 32 ALL BOLTS 80A-132, 137 THREE 16 16 BOTTOM R0W ON Wall 82-104 UPPER RING GIRDER TWO 30 30 PAD 1 THRU 4 80A-134 (WALL BOLTS) THREE 5 5 PAD 3 82-129 UPPER RING GIRDER TWO 40 40 PAD 1 THRU 4 80A-131, 136, 136R (RING CONNECTING BOLTS) THREE 40 40 PAD-1 THRU 4 81-280, 280R' l

1 UPPER RING GIRDEP, TWO 2 2 SGH-3, SGH-4 80A-138, 139 l (SPRINGllANGER) THREE 2 2 SGH-2, SGH-4 82-031, 032, 032R COLUf1N PINS ONE 2 2 COLUMN 1 77-130 TWO 2 2 COLUMN 2 79-136, 137 TWO 8 8 COLUMN 1 THRU 4 80A-86 TOP & BOTTOM TilREE 4 4 COLUMN 3 & 4 83C-131, 142 i

I BASE ANCHOR BOLTS ONE 8 8 BASE OF COLUMN 1 77-3 TWO 8 8 BASE OF COLUMN 2 79-57 i

TWO 32 32 BASE OF COLUMN 1 80A-ll3 l THRU 4 THREE 16 16 BASE OF COLUMN 82-108 3 AND 4 l

rosehe 0 7 as se stre LCD010583RLA21

Form 9-0034,Rav.0 (H&SP 5.2) .

NORTHERN STATES POWER C .

TABLE - ,

PRAIRIE ISLAND UNIT ___

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

b g *2. . ..'""OF '

. so.

O gg = g ga,g,=g a .. .Eo a A.T. m. .. Ecuo.

GOHY STEM 10 SE EXAM 8NED . AML A IDENTmm REMT M.

N/A N/A (S.C. NO. 12 CONT'D)

TOP COLUMN ONE 4 4 TOP 0F COLUMN 1 77-3 CONNECTING BOLTS TWO 4 4 TOP OF COLUMN 2 ,79-110 TWO 16 16 TOP 0F COLUMN 1 80A-124 THRU 4 '

TilR'EE 8 8 TOP OF COLUMN.3&4 83C-126 SUPPORT PAD ONE 6 6- '3) COL.383) COL.4 ~ 77-128 HELI-C0ll SCREWS TWO 6 12 COLUMNS 1 AND 2 79-119, 120 TWO 24 24 ALL HELIC 0ll SCREl S 80A-141 TilREE 24 24 ALL HELICOIL SCREl S81-246 12 COLUMN 3&4 83C-127 LOWER LATERAL ONE 14 14 PAD 1 77-3 SUPPORT ANCHOR TWO 14 14 PAD 2 79-112 BOLTS TO WALL TWO 44 44 PAD 1 THRU S 80A-106 THREE 16 16 PAD 3, 4, & 5 83C-081 LATERAL SUPPORT ONE 4 4 FIXTURE 1 77-3 WALL BOLTS TWO 4 4 FIXTURE 2 79-11 TWO 12 12 FIXTURE 1 THRU 3 80A-106 THREE 4 4 FIXTURE 3 83C-080 CONNECTING BOLTS ONE 5 16 16 EXAMINED 77-3 IN LATERAL BEAM TWO 5 16 16 EXAMINED 79-60 TWO 16 16 ALL BOLTS 80A-123 THREE 6 16 (REPEATINSPECTI0i l)

ALL BOLTS 83C-087, 121 PRESSURIZER I

BASE ANCHOR ONE 8 8 1-8 BOLTS 77-6

! TWO 8 8 9-16 BOLTS 79-66 TWO 24 24 1-24 BOLTS 80A-107

THREE 8 8 17-24 BOLTS82-111

' ~ " ~ " " " "

LC0010583RLA21

Ferin 9-0034,Rav.O (H&SP 5.2)

NORTHERN STATES POWER CO. b0 PRAIRIE ISLAND UNIT l TABt.E - ,

panc - '

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: SEISNftliotTitlG OF sus "E M S M

" $^M g p INSP. REQ *DL AMT. TEM 6NSPECTION GORY ITEM TO SE EXAM 4NED PER. AMT. EXAM 80ENTIFICATION REPORT NO.

1 N/A N/A ACCUMULATOR A BASE ANCHOR BOLTS ONE 8 8 1-8 BOLTS 77-5 TWO 8 8 9-16 BOLTS 79-67

TWO 24- 24 1-24 BOLTS 80A-96

) THREE 8 8 17-24 BOLTS 83C-057 ACCUMULATOR S BASE ANCHOR BOLTS ONE 8 8 1-8 BOLTS 77-5 TWO 8 8 9-16 BOLTS 79-68 TWO 24 24 1-24 BOLTS 80A-96 THREE 8 8 17-24 BOLTS82-112 REACTOR COOLANT PUMPS PUMP NO. 11 COLUMN PINS ONE 2 2 COLUMN 1 77-131 TWO 2 2 COLUMN 2 79-134, 135 TWO 6 6 COLUMN 1 THRU 3 80A-84, 93 TOP & BOTTOM THREE 2 2 COLUMN 3 83C-133, 134 f BASE ANC110R BOLTS ONE 8 8 BASE OF COLUMN 1 77-1

TWO 8 8 BASE OF COLUMN 2 79-58 TWO 24 24 BASE OF COLUMN 1 80A-112 THRU 3 THREE 8 24 BASE OF COLUMN 1 82-106 THRU 3 FOMM 3 F-24 76 4/70 LC0010583RLA21

, . =

Forni 9-0034,Rev.0.(M&SP 5.2)

NORTHERN STATES POWER CO.

PRAlHIE ISLAND UNIT __ J TABLE. ,

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

SE g __ _...- OF out. i n nu _

o ge;g GORY

=rgoa,gga . Eo a -1. m. . Ec1.o STEM TO BE EXAMINED R.. MT. EXM 80ENWMM REMT M.

N/A N/A (PUMP NO. 11 CONT'D) l COLUMN CONNECTING ONE 6 6 TOP 0F COLUMN 1 77-146 BOLTS TWO 6 6 TOP 0F COLUMN 2 79-109 TWO 18- 18 TOP 0F COLUMN 1 80A-101 l THRU 3 THREE 6 6 TOP OF COLUMN 3 83C-141

! TIC BACK BOLTS ONE 1 1 COLUMN 1 77-148 TWO 1 1 COLUMN 2 79-115 TWO 3 3 COLUMN 1 THRU 3 80A-97, 102 THREE 1 1 COLUMN 1 81-249, 249R TIE BACK PINS ONE 1 1 PAD 1 77-131 TWO 1 1 PAD 2 79-131 TWO 3 3 PAD 1 THRU 3 80A-94 TilREE 1 1 PAD 3 83C-132 Tl! ROUGH ANCHOR ONE 2 2~ PAD 1, SOUTH 2 77-1 BOLTS TWO 2 2 PAD 1, CENTER 2 79-105 i

TWO 6 6 PAD 1 ALL BOLTS 80A-103, 103R TilREE 6 6 PAD 1, ALL BOLTS81-250 LATERAL SUPPORT & ONE 4 4 PAD 2 77-1

.; WALL BOLTS

TWO 10 10 PAD 2 & 3, 80A-100 ALL BOLTS TilREE 3 3 PAD 3 .83C-056 PUMP NO. 12 COLUMN PINS ONE 2 2 COLUMN 1 77-131 TWO 2 2 COLUMN 2 79-138, 139 TWO 6 6 COLUMN 1 THRU 3 80A-84, 93 TOP & BOTTOM THREE 2 2 COLUMN 3 83C-138 vones e n sess one LCD010583RLA21

Form 9-0034,Rav.0 (H&SP 5.2)

NORTHERN STATES POWER CO. TAILE SB PRAIRIE ISLAND UNIT _ l / /

INSERVICE INSPECTION-EXAM! NATION

SUMMARY

MAJOR ITEM: SE E C BULi Imi OF SOS ITEM E N H IN INSP. REQ'O. AMT. BTEM INSPECTION GORY ITEM TO SE EXAMINED PER. AMT. EXAM IDENTIFICATION HEPORT NO.

N/A N/A (PUMP NO. 12 CONT'D)

BASE ANCHOR BOLTS ONE 8 8 BASE OF COLUMN 1 77-2 TWO 8 8 BASE OF COLUMN 2 79-59 TWO 24- 24 BASE OF COLUMN 1 80A-112 THko 3 TilREE 8 24 BASE OF COLUMNS 1 82-107 THRU 3 COLUMN CONNECTING ONE 6 6 TOP 0F COLUMN 1 77-147 BOLTS TWO 6 6 TOP 0F COLUMN 2 79-108 TWO 18 18 TOP 0F COLUMN 1 80A-101 THRU 3 THREE 6 6 TOP 0F COLUMN 3 83C-140

! TIE BACK BOLTS ONE 1 1 COLUMN 1 77-149 TWO 1 1 COLUMN 2 79-118 TWO 3 3 COLUMN 1 THRU 3 80A-98 TilREE 1 1 COLUMN 3 83C-137 TIE BACK PINS ONE 1 1 PAD 1 77-131 TWO 1 1 PAD 2 79-130 TWO 3 3. PAD 1 THRU 3 80A-85 i TilREE 1 1 PAD 1 83C-145 i

TilR00Gil ANCl10R ONE 2 1 PAD 3 77-2 l

BOLTS TWO 2 2 PAD 3, CENTER 2 79-61 TWO 6 6 PAD 3, ALL BOLTS 80A-103 l TilREE 2 2 PAD 1 83C-054 I

LATERAL SUPPORT ONE 4 4 PAD 1 77-2 AND WALL BOLTS TWO 3 3 PAD 2, TOP R0W 79-61 i TWO 10 10 PAD 1 & 2, 80A-100 ALL BOLTS TilREE 3 3 PAD 3 83C-053 l .

Foreas a r-aars ef te LCD010583RLA21

' ! I 1 G N

I T

L NS 1

F 0 BO ON 1 IO C TI I AT 1

M NA E S IT LE I MI BG E AM E E AA S XI N N TP EL O O

. N N S

N _

IO SI IT A

C I

D E E N N N _

I O O .

N N S _

N EO NI IT E E LA EC N N SI O O AD N N BN I

T . 9 9 R 0 0 OO 0 0 PN - -

E 5 5 R 8 8 A A E

N I .

LT 1 2 EN - -

SE H H AD G G BI S S D T T O V V EH DT NE M

PO 0 0 T SS 7 7 N NI A

L P

YG R

) NN E

. AI .

2.P T 5MA D

RS OR IR PCE N GE S M G 6RE E GN T NA (MEG T

W N ORO S

Y S

R I H R

L S O G 5

0. P AEI S / T A

1 RN 0 vSLR T R 1 EI PR A

eECA N E E PP L

R,ATUPN M N G US R

N E 5

5T O O / 8 3 SOC P G S 5 0 L M 0 0NLE O M 3

- REN C A 0 9 ECI E D HIL T C mTTE S L rRNS oOOA FNMR

TABLE III NOR11RilW STATES POWER CO. -

l' AGE 1 OF 1 l'RAIRIE ISIAND INIT 1 IfalinHIC Sts.14ARY - SEISHic BOLTING AUCHENTEI) te;p Iso I.INE I.INE Iff - cal..

i REVISICN OOFE'ONINr OR SYS11N IDOP STANIIAkil g,gg SIZE NL50ti!R ISI-59 0 Steam Cenerator Support Base A&R -

4/Cenerator ISt-60 0 Steam Generator Support Top A&R -

4/Cenerator ISt-61 0 Reactor Coolant Pump Support Base A&R - 3/ Pump 1S1-62 0 Reactor Coolant Pump Support Top A&R - 3/ Pump IS I-6 3 0 Steam Generator #11 Lower Support Ring A - -

ISI-64 0 Reactor Coolant Pump #11 Lower Lateral A - -

Support ISI-65 0 Steam Cenerator #12 I.ower Lateral Support B - - <

ISI-66 0 Reactor Coolant Pump #12 Lower Lateral 5 - -

Support l

1S1-67 0 Steam Cencrator Support Pad A&R -

4/Cenerator

-l i ISI-70 0 Steam Cenerator Upper Support A&B - -

ISt-72 0 Steam Cenerator Upper Support Snubbers A&R - -

l 1S1-73 0 Pressurizer Base - - -

ISI-74 0 Accumulator Base A&R - -

a e

h i

l o

D APPENDIX D TABLE I -

PERSONNEL LISTING TABLE II -

ULTRASONIC CALIBRATION BLOCKS i

( TABLE III - PROCEDURE LISTING TABLE IV -

EQUIPMENT AND MATERIALS t

i O

e

~ -

C -" =7*w-'- w ..%,. . _ , , ,__ . _ . . _ . , _ ,,, ___ _ __

NORTHERN STATES POWER COMPANY APPENDIX D PRAIRIE ISLAND TABLE I PERSONNEL LISTING PAGE 1 0F 2 ASNT t_EVEL ,

EXAMINER TITLE ORGANIZATION UT PT MT VT ET RT Cappel, R M Technician LMT (2) I II gy gg(la,b), ,

Carraher, T G Technician LMT I II II II(Ia) , ,

Hall .D A Technician LMT II - - - - -

Kellerhall, R A Superviser LMT III III III III(lab) , ,

Kimball , ' T Technician LMT II II II II(la) , ,

MacGill, D B' '

Data Mgmt LMT III III III III(la) gy ,

Voss, A W t Technician LMT I - - - - -

. Conrad, G E Technician W (3) , , , 7; , ,

Enfield, 8 A Coordinator W III - - - - -

Farrell, G Supervisor W - - .

Graw, J H  ! Technician W II - - - - -

i Haines, R A Technician W III - - - - -

Hughes, R W Technician W - - -

II - -

Kurek, D Supervisor W III III III II - -

Markle, L E Technician W II - - - - -

Pushnik, G gTechnician W II - - - - -

Scroeder, T Suoervisor W - - - - - -

Walsh, T J Technician W II - - - - -

Anderson, M T M&SP Engr NSP III III III III(la) , ggy Dahlman, L C M&SP Spec NSP II III III III(la,b), gy; I

LCD041285RLA01-LT

NORTHERN STATES POWER COMPANY APPENDIX D PRAIRIE ISLAND TABLE I PERSONNEL LISTING PAGE 2 0F 2 ASNT LEVEL EXAMINER TITLE ORGANIZATION UT PT MT VT ET l RT Hughes, R ANII Hartford Steam

. Boiler Brusseau, F ANII Hartford Steam Boiler FOOTNOTES:

(la) Certified by NSP to per' form visual determination of structural integrity for hanger assemblies in accordance with NSP-VT-2.

(1b) Inspection experience and NDE Qualification were judged to be adequate to perform visual examination in accordance with NSP-VT-1.

(2) Organization: Lambert, MacGill, Thomas, Inc. (LMT) 515 Aldo Avenue Santa Clara, CA 95050 (3) Organization: Westinghouse Electric Corporation (W)

Nuclear Services Division P.O. Box 2728 Pittsburgh, PA 15230

~

e LCD041285RLA01-LT

1 NORTHERN STATES POWER COMPANY APPENDIX D TABLE II PRAIRIE ISLAND UNIT I ULTRASONIC CALIBRATION BLOCKS PAGE 1 of 1 l

PIPE SCilEDULE SERIAL OR CALIBRATION NSP No. SIZE & DIA. & THICKNESS MATERIAL HEAT NUMBER REPORTS DATE 4

37 W=6" L=12" T=1.5" SA 516 8733967 DAH-1-1 1-18-85

+ Clad GR 70 DAH-1-2 1-19-85 TK-1-1 1-18-85 39 4" .598" SA182 F304 M7853 TK-1-2 2-1-85

]

4 i

I l

I 4

LCD031685RLA01-LT

,l

NORTilERN STATES POWER COMPANY APPENDIX D PRAIRIE ISLAND - UNIT I TABLE III PROCEDURE LISTING PAGE 1 of 2 PROCEDURE NUMBER FIELD PLANT APPROVAL FIELD CilANGE PROCEDURE TITLE CllANGE DESCRIPTION

.AND REVISION CilANGE DATE REMARKS NSP-PT-1, Rev 2 NONE Liquid Penetrant 6-23-83 NONE Examination i

NSP-UT-1, Rev 1 NONE Ultrasonic Examination 6-23-83 NONE Of Piping Welds NSP-UT-2, Rev 1 NONE Automatic Data Recording 6-23-83 NONE NSP-UT-3, Rev 1 1 Ultrasonic Examination of 1-29-85 NONE Change thickness Ferritic Vessels from 2.5" to 1.0" for examination of accumulator NSP-VT-1, Rev 2 NONE Visual Examination 6-23-83 NONE 4

l NSP-VT-2, Rev 2 NONE Visual Examination of 6-23-83 NONE Hanger Assemblies

! NSP-VT-3, Rev 2 NONE Visual Examination of 6-23-83 NONE

Pump and Valve Internal Pressure Boundary Surfaces

! ISI-88, Rev 1 NONE Remove Visual Examination 1-15-85 NONE of Reactor Vessel Internals ISI-154, Rev 3 NONE Preservice and Inservice 1-15-85 NONE Inspection of Reactor Vessels OPS-NSD-101, Rev 5 NONE Preservice and Inservice 1-15-85 NONE Inspection Documentation LCD030585RLA03-LT

NORTHERN STATES POWER COMPANY APPENDIX D PRAIRIE ISLAND - UNIT I TABLE III PROCEDURE LISTING PAGE 2 of 2 PROCEDURE NUMBER FIELD PLANT APPROVAL FIELD CHANGE PROCEDURE TITLE CHANGE DESCRIPTION

.AND REVISION CHANGE DATE REMARKS NSD-ISI-10, Rev 6 NONE Qualification.of 1-15-85 NON'E Ultrasonic Manual

'g Equipment -

ISI-55, Rev 0 NONE Manual Ultrasonic l-15-85 NONE Examination of Ligament Areas I .

l 1

9 LCD030585RLA03-LT

NORTHERN STATES POWER COMPANY APPENDIX D TABLE _ Y EQUIPMENT AND MATERIALS PAGE DF 3 MATERIAL OR TYPE OR CALIBRATION EQUIPMENT SERIAL NUMBER A R BATCH REMARKS ULTRASONIC:

,, NORTEC 131D s/n 273 cal: 12-05-84 NORTEC 1310 s/n 111 cal: 12-11-84 NORTEC 1310 s/n 417 cal: 12-19-84 RECORDERS:

G0ULD 220 s/n 18940 cal: 12-20-84 GOULD 220 s/n 19023 cal: 09-06-84 GOULD 220 s/n 19016 cal : ' 08-30-84 TEMP. GAUGES:

PTC SURFACE s/n 676 cal: 11-26-84 Certified by THERMOMETERS s/n 657 cal: 11-26-84 Manufacturer s/n 660 cal: 11-26-84 ROMPAS BLOCKS:

4140 CS s/n 011 cert: 09-08-77 Orla's Machine Shop 304~SS s/n 043 cert: 03-20-84 Earle H Jorgenson Co.

MATERIALS:

PENETRANT MAGNAFLUX Penetrant batch #83M051 type: SKL-HF/S SPOTCHECK Remover / Cleaner batch #82G049 type: SKC-NF/ZC-7B Developer batch #84C057 type: SKO-NF/ZP-98 ULTRASONIC COUPLANT LMT-GEL batch #61384 ULTRASONIC j TRAN5DUCERS: S/N: jlZE: FREQUENCY:

l HARIS0NIC -'n V6271 3/4" dia 2.25 MHZ l HARIS0NIC  :,ia R3162 1/2" x 1". 2.25 MHZ HARIS0NIC 1/2" x 1"

  • s/n A52 2.25 MHZ l KB AER0 TECH s/n 30122 .375" dia 2.25 MHZ

, WESTINGHOUSE VESSEL EQUIPMENT:

i ULTRASONIC INTERFACE s/n 00834 cal: 10-03-84 MARK IV s/n 00835 cal: 12-26-84

. RECEIVER s/n 00849 cal: 11-04-84 MONITOR GATE s/n 0243 cal: 11-03-84 DATA DISPLAY s/n 02434 cal: 11-06-84 j LCD030585RLA04-LT l

NORTHERN STATES POWER COMPANY APPENDIX D TABLE _ iT"~

EQUIPMENT AND MATERIALS PAGE '0F 3 MATERIAL OR TYPE OR CALIBRATION EQUIPMENT SERIAL NUMBER R BATCH REMARKS SERIAL DATA LINK s/n 00860 cal: 11-05-84 PULSER / PRE AMP s/n 05781E cal: 11-05-84

, EBS s/n 00855 cal: 10-03-84 TRANSDUCERS S/N Size Frequency HARIS0NIC Y6058 1-1/2" dia 2.25 MHZ HARIS0NIC Y6063 1-1/2" dia 2.25 MHZ HARIS0NIC Y6059 1-1/2" dia 2.25 MHZ HARIS0NIC Y6050 1-1/2" dia 2.25 MHZ HARIS0NIC Y6057 1-1/2" dia 2.25 MHZ HARIS0NIC Y6054 1-1/2" dia 2.25 MHZ

-TECHNICS 0NIC T2228 1-1/2" dia 2.25 MHZ HARIS0NIC W4273 1-1/2" dia 2.25 MHZ HARIS0NIC Y6060 1-1/2" dia 2.25 MHZ HARIS0NIC Y6061 1-1/2" dia 2.25 MHZ HARIS0NIC W4271 1-1/2" dia 2.25 MHZ HARIS0NIC Y6064 1-1/2" dia 2.25 MHZ HARIS0NIC Y7424 1-1/2" dia 2.25 MHZ HARIS0NIC W4253 1-1/2" dia 2.25 MHZ HARIS0NIC V6456 1-1/2" dia 2.25 MHZ HARIS0NIC 3/4" dia W4378 1.0 MHZ TECHNIS0NIC T2234 3/4" dia 1.0 MHZ TECHNIS0NIC T2233 3/4" dia 1.0 MHZ HARIS0NIC Y6078 3/4" dia 1.0 MHZ HARIS0NIC Y7425 1-1/2" dia 2.25 MHZ HARIS0NIC Y6066 1-1/2" dia 2.25 MHZ TECHNIS0NIC Y2227 1-1/2" dia 2.25 MHZ HARIS0NIC Y6056 1-1/2" dia 2.25 MHZ HARIS0NIC Y6065 1-1/2" dia 2.'25 MHZ HARIS0NIC Y7427 1-1/2" dia 2.25 MHZ HARIS0NIC Y7420 1-1/2" dia 2.25 MHZ HARIS0NIC Y7421 1-1/2" dia 2.25 MHZ HARIS0NIC Y7422 1-1/2" dia 2.25 MHZ HARIS0NIC V6488 3/4" dia 2.25 MHZ AER0 TECH E21204 1" x .5" 5.0 MHZ ULTRAN 32704 1" dual 2.25 MHZ ULTRAN 32701 1" dual 2.25 MHZ ULTRAN 32702 1" dual 2.25 MHZ

  • - ----- ULTRAN 33101 1" dual 2.25 MHZ HARIS0NIC Y12171 .5" x .5" 2.25 MHZ HARIS0NIC Y12174 .5" x .5" 2.25 MHZ HARIS0NIC Y11564 .5" x .5" 2.25 MHZ HARIS0NIC Y11565 .5" x .5" 2.25 MHZ LCD030585RLA04-LT

1 l

l NORTHERN STATES POWER COMPANY APPENDLX 0 TABLE _ W EQUIPMENT AND MATERIALS PAGE tF 3 MATERIAL OR TYPE OR CALIBRATION EQUIPMENT SERIAL NUMBER DATE OR BATCH REMARKS NUMBER WESTINGHOUSE MANUAL EXAMINATIONS MARK I s/n 00869E cal: 2-2-85 ULTRASONIC COUPLANT SONATRAK 40 batch #8440 TRANSDUCERS:  ;

l AER0 TECH D17921 1" dia 2.25 MHZ l AER0 TECH S783924 1/2" dia 5.0 MHZ l

l LCD030585RLA04-LT

APPENDIX E FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTION s

l O

l l

l l

-FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) 1.) Owner: Northern States Power Comoany

, Address: ___414 Nicollet Mall, Minneapolis, Minnesota 55401 2.) Plant: PRAIRIE ISLAND GENERATING PLANT Address: WELCH MINNESOTA 3.) Plant Unit: I. 4.) Owner (Certificate of Authorization): --

5.) Commercial Service Date: 12-16-73 6.) National Board No. for Unit: --

7.) Components Inspected:

Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

81.0 REACTOR VESSEL CREUSOT-LOIRE 686 MINN 200-51 ---

Bl.1 LONGITUDINAL AND CIRCUMFERENTIAL SHELL WELDS IN CORE REGION CIRCUMFERENTIAL WELD N0. 3 81.2 LONGITUDINAL AND CIRCUMFERENTIAL WELDS IN SHELL AND MERIDINAL AND CIRCUMFERENTIAL SEAM WELDS IN BOTTOM HEAD CIRCUMFERENTIAL CREUS0T-LOIRE --- --- ---

WELD NO. 2 WELD N0. 4 WELD NO. 5 B1.3 VESSEL-TO-FLANGE CIRCUMFERENTIAL WELD VESSEL-TO- CREUSOT-LOIRE --- --- ---

FLANGE, W-1 STUD H0LES 15, 18-22, 30-31, and 44-3

~

Bl.4 PRIMARY N0ZZLE-TO-VESSEL WELDS AND N0ZZLE INSIDE RADIUS SECTION

, REACTOR CORE CREUSOT-LOIRE --- --- ---

COOLANT INLET N0ZZLES WELD 6, 9 SAFETY CREUS0T-LOIRE --- --- ---

INJECTION

. N0ZZLES WELD 8, 11 L:30:07 : LT.01-LT -

i FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS l

(As Required by the Provisions of the ASME Code Rules) I l

1.) Owner: Northern States Power Company

. Address: 414 Nicollet Mall, Minneapolis, Minnesota 55401 2.) Plant: PRAIRIE ISLAND GENERATING PLANT

=

Address: WELCH MINNES0TA 3.) Plant Unit: 1 4.) Owner (Certificate of Authorization): --

5.) ' Commercial Service Date: 12-16-73 6.) National Board No. for Unit: -,

7.) Components Inspected:

Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

Bl.6 N0ZZLE-TO-SAFE END WELDS REACTOR CORE CREUSOT-LOIRE --- --- ---

COOLANT INLET N0ZZLES RCC-A-14 S.E.

RCC-B-14 S.E.

Bl.9 LIGAMENTS BETWEEN THREADED STUD H0LES

. STUD HOLES CREUSOT-LOIRE --- --- ---

15, 18-22, 30-36, and 44-3 Bl.12 INTERNALLY WELDED VESSEL SUPPORTS SUPPORTS CREUSOT-LOIRE --- --- ---

A AND B Bl.4 VESSEL CLADDING CLAD PATCHES CREUS0T-LOIRE --- --- ---

VCP-5, VCP-6

, Bl.5 VESSEL INTERIOR UPPER AND CREUSOT-LOIRE --- --- ---

LOWER INTERNALS 81.7 REMOVABLE CORE SUPPORT STRUCTURES CORE SUPPORT CREUSOT-LOIRE --- --- ---

AND ASSOCIATED ITEMS 6w w6 s -6 m_-.. r ---- - * - - - -wy'- * * - - - --w

FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) 1.) Owner: Northern States Power Company

, Address: 414 Nicollet Mall, Minneapolis, Minnesota 55401 2.) Plant: PRAIRIE ISLAND GENERATING PLANT Address: WELCH MINNESOTA 3.) Plant Unit: I 4.) Owner (Certificate of Authorization): --

5.) Commercial Service Date: 12-16-73 6.) National Board No. for Unit: --

7.) Components Inspected:

Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

Bl.8 CONTROL R0D DRIVE HOUSINGS PERIPHERAL CRD CREUSOT-LOIRE --- --- ---

HOUSINGS CR - 17, 33 l B5.0 REACTOR COOLANT PUMPS .

B5.6 REACTOR CORE COOLANT PUMP CASING WELDS REACTOR CORE WESTINGHOUSE W562 --- ---

COOLANT PUMP NO. 12 B6.7 VALVE BODIES RESIDUAL HEAT NAVC0 --- --- ---

REMOVAL, TAKE OFF A 8701 RESIDUAL HEAT NAVC0 --- --- ---

REMOVAL RETURN B 8703

. PRESSURIZER NAVC0 --- --- ---

SAFETY LINE A 1-8010A e

s b W W 't me

FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) 1.) Owner: Northern States Power Comoany

- Address: 414 Nicollet Mall, Minneapolis, Minnesota 55401 2.) Plant: PRAIRIE ISLAND GENERATING PLANT Address: WELCH MINNESOTA 3.) Plant Unit: I 4.) Owner (Certificate of Authorization): --

5.) Commercial Service Date: 12-16-73 6.) National Board No. for Unit: -.

7.) Components Inspected:

Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

C1.1 CIRCUMFERENTIAL BUTT WELDS ACCUMULATOR DELTA 41038-70-1 ---

2554 No. 11 W-6 SOUTHERN 9

i 6 W = 66 64 -w

FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) 1.) Owner: Northern States Power Comoany Address: 414 Nicollet Mall, Minneapolis, Minnesota 55401 2.) Plant: PRAIRIE ISLAND GENERATING PLANT Address: WELCH MINNESOTA 3.) Plant Unit: I. .4.) Owner (Certificate of Authorization): --

5.) Commercial Service Date: 12-16-73 6.) National Board No. for Unit: -,

7.) Components Inspected:

Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

SEISMIC BOLTING STEAM GENERATOR WESTINGHOUSE 1101 ---

68-24 NO. 11 UPPER RING GIRDER SPRING HANGERS SGH-1, SGH-2 s

h r

1 b6 V O ObMVA"b

i i

FORM NIS-1 (back) I 8.) Examination Dates 1-14-85 to 2-22-85 9.) Inspection Interval 12-16-73 to 12-16-83 10.) Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.

=

This was the last inservice inspection conducted for inspection period three of the first ten year , interval. The examinations

  • completed all items required for the first interval.

11.) Abstract of Conditions Noted.

The only anomalies detected were two linear PT indications on the 0.D. surface of reactor coolant pump no. 12.

12.) Abstract of Corrective Measures Recommended and Taken.

The anomalies were accepted based on the acceptance standard of the 1980 edition of ASME Section XI and found to be within the allowable limitations of table IWB-3518-2.

We certify that the statements made in this report are correct and the exami-nations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Date b / 19 d Signedh b 31 s V Owner e b(.B-

/ () / 'l Certificate of Authorization No. (if applicable) -

Expiration Date -

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of W4hw and employed by#Mrsau crer ,dskr< of

  1. 44-r #4 s e c.-r have in-spected the components described in this Owner's Data Report during the period /-/ O rr to 4 - 4 2 - 7.r . and state that to the best of my knowledge and belief, the Owner has per-formed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME

, Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Data report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Date Ats v / 19 8"J"

/WA W Comissions avdF9.= v M re-3 9 Ingpector'y41gnature National Board, State, Province & No n a Lim . m