Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Informs of Postponement of Emergency Preparedness Program Audit for 1991". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19220A844  + (Informs of Plant Name Change from Oyster Creek 2 to Metropolitan Edison Tmi,Unit 2.Public Announcement to Be Made in One Week)
  • ML20043E821  + (Informs of Plant Radiological Emergency Preparedness Exercise for 1990 Scheduled for 900829.Schedule Discussed W/Personnel from Region IV Emergency Preparedness,Fema,State of Ks & Coffey County)
  • ML18038B560  + (Informs of Plant Restart Panel Recommendation That Plant Be Approved for Restart,After Oversight of Plant Restart Insp & Licensing Activities.Restart Panel Task & Issues Checklists & Insp Summarization by Subj Matter & Insp Rept Number Encl)
  • ML20213G402  + (Informs of Points Discussed W/Aeod Personnel Re Use of Contractor to Evaluate NPRDS Participation.Furnishing Copies of NPRDS Data Base Tapes for Contractors Discontinued)
  • ML20126C184  + (Informs of Porter County,In 800317 Public Hearing Re Encl Petition Concerning Improvement Location Permit 74-290. Intends to Show That Permit Is Invalid)
  • ML17263B237  + (Informs of Position Taken by Nuclear Industry Through NUMARC Approval of Issues Re Severe Accident Mgt Concerning Util Assessment of Response Capabilities & Implementation of Improvements Identified in Assessment)
  • ML20202C170  + (Informs of Possession of Nuclear Measuring Device,Model 103, Manufactured by NDC Sys in Duarte,Ca,Under State of CA General License GL-1933-70)
  • ML20199H200  + (Informs of Possession of Nuclear Measuring Device,Model 103, Manufactured by NDC Sys in Duarte,California,Under State of California General License GL-1933-70)
  • ML20202C198  + (Informs of Possession of Nuclear Measuring Device,Model 103, Manufactured by NDC Sys in Duarte,Ca Under State of CA General License GL-1933-70)
  • ML20199H147  + (Informs of Possession of One Nuclear Measuring Device,Model 103,manufactured by NDC Sys in Monrovia,California Under California General License GL-1933-70)
  • ML20199H213  + (Informs of Possession of One Nuclear Measuring Device,Model 102,manufactured by NDC Sys in Monrovia,California,Under State of California General License GL-1933-70.Device Used as Part of Extruder Gauging Sys)
  • ML20202C185  + (Informs of Possession of Two Nuclear Measuring Devices, Model 105,manufactured by NDC Sys in Duarte,Ca,Under State of CA General License GL-1933-70)
  • ML19290A405  + (Informs of Possible Conflict in Temp Limitations Imposed by EPA & Nrc.Requests Info Re NRC Rationale Used in Developing Tech Specs Thermal Limitations)
  • ML20066E792  + (Informs of Possible Error in Util Re Design of Containment Purge & Vent Sys.Debris Screen Probably Installed on Torus Vacuum Breaker Pipe Rather than Torus Exhaust Pipe.Insp Scheduled for Next Outage)
  • ML18019A486  + (Informs of Possible Generic Safety Problems Re Nighttime Emergency Notification of Residents in Emergency Planning Zones.Most Residents Would Not Be Aroused from Sleep by Emergency Sirens If Bedroom Windows Closed.Served on 851120)
  • ML20033A686  + (Informs of Possible Interest in Purchasing Spring Creek Mesa Site in Montrose County,Co for Use as U Mill Tailings & Effluent Disposal Site)
  • ML20052B126  + (Informs of Possible Leaks in furnace-sensitive Stainless Steel Safe Ends on Reactor Nozzles at Nine Mile Point.Util May Be Required to Replace Safe Ends Prior to Return to Power)
  • ML20003G518  + (Informs of Possible Nonconformance Re Installation of Rated Fire Penetration Seals at Facility.Chemtrol CT-800/GE RTV 6428 Silicone Does Not Meet ASTM E-119 Stds)
  • ML20244D392  + (Informs of Possible Problems for Data Transmission During ERDS Test Using Digital Pointers Listed in . Computer Digital Points Submitted in Ltr Will Be Transmitted After Analog Values.W/Related Encls)
  • ML18031A177  + (Informs of Possible Six Month Delay in OL Review Schedule from Util)
  • ML20112E109  + (Informs of Possible Unsafe Incident in Operation of Reactor. on 701010,reactor Scram (Doors Open) Received.Shim Blade 4 Failed to Drop Into Core.Licensee Believe That Failure of Shim Blade Caused by Malfunction in ball-nut Mechanism)
  • ML19253B408  + (Informs of Postponement Until 791130 for Filing Updated Safety Rept.Personnel Engaged in full-time Effort in Restoring Reactor to Normal Operation)
  • IR 05000275/1996022  + (Informs of Postponement of 961009 Meeting Re NRC Insp Rept 50-275/96-22 to Discuss Employee Concerns Program)
  • ML20093F180  + (Informs of Postponement of Dates for Procedure Rev Training for Matl Control from 840831 & 0915 to 841002 & 15, Respectively,Per Insp Rept 50-528/84-18)
  • IR 05000341/1988021  + (Informs of Postponement of Decision Re Whether or Not to Withdraw Violation Noted in Insp Repts 50-341/88-21 & 50-341/86-39.Listed Values for LPCI & Core Spray Sys Requested within 60 Days of Receipt of Ltr)
  • ML20101L348  + (Informs of Postponement of Loss of Offsite Power Surveillance Until Prior to Startup.Necessary Test Equipment Out of Svc During Current Shutdown)
  • ML20150D215  + (Informs of Postponement of Meeting Sched for 781027 to Discuss Possible Review of Offshore Pwr Sys Proceeding in Order to Enable Entire Commission to Attend.Also Forwards Rev Draft Order)
  • ML20063F907  + (Informs of Potential Changes to B&W Topical Rept BAW-10082, Qualification of Safety-Related Instrument & Control Sys, as Result of Impact of 10CFR50.49)
  • NUREG-0843, Informs of Potential Deficiency Re 860702 Application for Amend to License NPF-16.Applicability of GDC 5 Discussed in SER (NUREG-0843) Section 9.1.2 May Need Evaluation & Analysis.Served on 861212  + (Informs of Potential Deficiency Re 860702 Application for Amend to License NPF-16.Applicability of GDC 5 Discussed in SER (NUREG-0843) Section 9.1.2 May Need Evaluation & Analysis.Served on 861212)
  • L-81-476, Informs of Potential Failure of GE Hea Relays to Operate When Trip Solenoid Was Energized,Initially Reported on 811013.Probably Due to Malformed Torsion Springs. Evaluation Being Conducted.Final Rept by 811213  + (Informs of Potential Failure of GE Hea Relays to Operate When Trip Solenoid Was Energized,Initially Reported on 811013.Probably Due to Malformed Torsion Springs. Evaluation Being Conducted.Final Rept by 811213)
  • ML20054B659  + (Informs of Potential Reportable Condition in Hydrodynamic Loads in Piping & Supports of Control Rod Driveline Sys Causing Calculated Hydrodynamic Loads to Be Inaccurate. Requests Proposed Plan for Reinforcing Affected Components)
  • ML17276B400  + (Informs of Potential Reportable Condition in Hydrodynamic Loads in Piping & Supports of Control Rod Driveline Sys Causing Calculated Hydrodynamic Loads to Be Inaccurate. Requests Proposed Plan for Reinforcing Affected Components)
  • ML17053D105  + (Informs of Potential Reportable Condition in Hydrodynamic Loads in Piping & Supports of Control Rod Driveline Sys Causing Calculated Hydrodynamic Loads to Be Insufficiently Accurate.Requests Plan for Reinforcing Affected Component)
  • ML20052A261  + (Informs of Potential Reportable Condition in Hydrodynamic Loads in Piping & Supports of Control Rod Driveline Sys. Proposed Plan for Reinforcing Affected Components Requested)
  • ML20137D553  + (Informs of Potential Safety Problem That May Require Action by Dot.Safety Assessment Should Be Performed for Model 6M Container to Ensure That Adequate Safety Being Provided for All Authorized Contents)
  • ML20236A065  + (Informs of Potential Safety Question Re Design of Reactor Pressure Vessel Support Sys for Pwrs.Util Requested to Review Design Bases to Determine If Transient Loads Taken Into Account & Provide Results to NRC within 30 Days)
  • ML19329B031  + (Informs of Potential Safety Question Re Reactor Vessel Support Member Transient Load Capacities After Postulated Reactor Coolant Pipe Rupture Adjacent to Reactor Vessel. Requests Review of Support Sys Design Bases in 30 Days)
  • ML20035D931  + (Informs of Potential Scheduling Conflict Re Hearing.Nrc Learned That Principal Staff Witnesses in Proceeding Had Planned to Attend wk-long Meetings During Wk of 930620 in Ca.Hearing Scheduled for 930622-24 May Be Rescheduled)
  • ML20106D470  + (Informs of Potential Scheduling Conflict Re Upcoming Hearings on Offsite Emergency Planning Matters.Forwards Notice of Withdrawal of Offsite Emergency Planning Issue 1. W/O Encl)
  • ML20236A950  + (Informs of Potential Slip in Schedule for Reviewing Request for Interim OL Application for Facility.Slip in Schedule Due to Late Submittal of Info.If Evaluation Not Issued by 771101 Decision Date Would Slip to 780515 Rather than 780415)
  • ML20197H237  + (Informs of Potential Slippage in Dates Provided in 860324 long-term Plan & Rescheduling of Refueling Outage 7 Due to Unscheduled Maint Outages)
  • ML20235G464  + (Informs of Potentially Significant Info in OL & CP Proceedings for Facilities.Applicant Should Have Already Informed ASLB Re Some of Info from 870622 & 23 Proceedings. Related Correspondence)
  • ML20058C344  + (Informs of Pr for Protection Aganist Malevolent Use of Vehicles at Nuclear Power Plants)
  • ML20202J767  + (Informs of Predecisional EC Scheduled for 971219 in Atlanta, Ga to Discuss Apparent Violation Re Timeliness of Corrective Action)
  • ML17229A989  + (Informs of Predecisional Ec,Scheduled for 990107,to Discuss Fire Protection Functional Insp Apparent Violations Discussed in Insp Rept 50-335/98-14 & 50-389/98-14,in Atlanta,Ga.This Ltr Supercedes)
  • ML20134C277  + (Informs of Predecisional Enforcement Conference Scheduled for 960917.Purpose of Meeting to Discuss Apparent Violation Involving Discrimination Against Wf Jocher)
  • ML17328A433  + (Informs of Preliminary Assessment of 900713 Electrical Contact Accident at Facility.Investigation Concludes That No Safety Rules Violated)
  • ML19345F127  + (Informs of Preliminary Physical Inventory Verification Ideas Put Into Operation During 800603-04 Trip to Wilmington,Nc. Schedule of Events for Physical Inventory Submitted)
  • ML20147H660  + (Informs of Preliminary Results of Review of BWROG Emergency Procedure & Severe Accident Guidelines & to Identify Areas Where Addl Info & Discussion W/Bwrog Necessary)
  • ML17156A273  + (Informs of Preliminary Review of Licensee Response to Generic Ltr 83-28,Item 1.2 Re post-trip Review.Response Incomplete in Two Areas Evaluated.Draft Technical Evaluation Rept SAIC-85/1523-11 Encl)