Informs of Postponement of Emergency Preparedness Program Audit for 1991
ML20076D050
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/19/1991
From: Jump W
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ST-HL-AE-3815, NUDOCS 9107260030
Download: ML20076D050 (3)


Text

-

The Light company h

llouston Lighting & Power pat agn>jnt yntp &nnadnptadon E O. Bn m Wadn.onh. Te mai p_m July 19, 1991 ST HL AE 3815 File No.: C09.08 10CFR50.54(t)

U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 South Texas Project Electric Cencrating Station Units 1 and 2 Docket Nos. STN 50 498, STN 50 499 Postponement offmercency Preparedness Procram Audit flouston Lighting 6 Power Company (HIAP) intends to postpone the 1991 audit of the South Texas Project Electric Cenerating Station (STPEGS)

Emergency Preparedness Prograrn (EPP).

The audit is to be postponed approximately three months beyond the current schedule of September 1991.

Annual reviews of the EPP are required by 10CFR50.54(t) which states that H14P *shall provide for a review of its emergency preparedness program at least every 12 months by persons who have no direct responsibility for implementation of the emergency preparedness program".

The audit period will be extended to fifteen months only for the 1991 audit - future audits are expected to occur at nominal twelve month intervals.

This postponement is justified for the following reasons:

STPEGS is concluding a major enhancement of the EPP which is to become effective in August, 1991. Accordingly, annual retraining of all but certain key Emergency Response Organization personnel has been delayed so that training will be in accordance with the enhanced EPP.

Performance of an audit in September will not allow sufficient time for implementation of the enhanced EPP to acconunodate an effective evaluation.

Postponement until December will enable an evaluation of four months' implementation of enhanced EPP activity in addition to the eleven months governed by the current EPP since the 1990 audit.

Independent review of ongoing EPP activities has been perforrned since the 1990 EPP audit.

9107260030 910719 PDR ADOCK 050004ci ph I

PDR

' 'k msem-m a a sid>smary or nouuon inauunes hicorPorma

I llouston 1.ighting & Powcr Company SduthTexas Project Elettric Gencrating $ tat,on i

ST IIL.AE 3815 File No.:

009.08 Page 2 i

i Postponement of this audit will not result in a decrease in the overall effectiveness of Emergency Preparedness at STPEcs, nor will it result in a decrease in the effectiveness of Quality Assurance / independent review of EPP l

activities to verify corspliance with 10CFR50.47(b) and 10CFR50, Appendix E.

Independent review of EPP activities will continue to meet tha standards of 10CFR50.54(t).

{

If you have any questions on this matter, plesso contact Mr R. J. Rehkugler at (512) 972 7226 or me at (512) 972 7205.

l C L

~[

William J. Jump

Manager, Nuclear 1.icensing PLW/sgs MISC)91-17$.t01

ST ilt. AE. 3815 llouston 1.jghting k Power Coinpany Pile No.: (;09.08 Soi.th Tnli Projut I lutrit Gene rating Station Page 3 cc:

Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associate Cer.eral Counsel 611 Ilyan Plaza Drive, Suite 1000 llouston Lighting 6 Power Cortpany Arlington, TX 76011 P. O. Box 61867 llouston, TX 77208 Ceorge Dick, Project Manager U.S. Nucicar Regulatory Commission INPO Washington, DC 20$$$

Records Center 1100 circle 75 Parkway J. 1. Te}.'m Atlanta, CA 30339 3064 Sen.or R.s'd ot inspector c/o b, d. Suelear Regulatory Dr. Joseph M. llendric Commission 50 Bellport Lane P. O. Box 910 Ite11 port, NY 11713 Bay City, TX 77414 D. K. Lacker J. R. Newman, Esquire Bureau of Radiation Control Newman 6 lloltzinger, P.C.

Texas Department of Ilealth 1615 1. St ree t, N.W.

1100 West 49th Street Was.hington, DC 20036 Austin, TX 78756 3189 D. E. Ward /T H. Puckett Central Power and Light Company P. O. Box 2121 Corpus Christi, TX 78403 J. C lenier/M. B. leo City of Austin Electric Utility Department P.O. Box 1088 Austin, TX 78767 K. R. Fiedler/M. T. liardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 07/09/91 L4/NRC/