This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000327/FIN-2009006-02 + (Inadequate Scopng of SSCs Used in EOPs into the Maintenance Rule Program)
- 05000286/FIN-2016001-03 + (Inadequate Screening of Reactor Protection System Test Method Change)
- 05000352/FIN-2008004-01 + (Inadequate Secondary Containment Control Procedure)
- 05000261/FIN-2011003-02 + (Inadequate Seismic Analysis for Installation of Safety Related Cable Trays and Conduit)
- 05000266/FIN-2009003-01 + (Inadequate Seismic Assessment of Temporary Cable Installations Above Motor-Driven Auxiliary Feedwater Pumps)
- 05000247/FIN-2008003-04 + (Inadequate Seismic Design Control Associated with a Temporary Modification to Emergency Diesel Generator Service Water Return Piping)
- 05000272/FIN-2015002-03 + (Inadequate Seismic EAL Scheme)
- Information Notice 1987-02, Inadequate Seismic Qualification of Diaphragm Valves by Mathematical Modeling and Analysis + (Inadequate Seismic Qualification of Diaphragm Valves by Mathematical Modeling and Analysis)
- 05000244/FIN-2009005-03 + (Inadequate Selection of Alternating Current-Powered Relays in Control Room Emergency Air Treatment System Fan Control Logic)
- 05000391/FIN-2018003-04 + (Inadequate Sensitive Equipment Control Results in Unit 2 Reactor Trip on April 12, 2018)
- 05000261/FIN-2007007-01 + (Inadequate Separation and Protection of CST Level Instrument Cables and Equipment Required for SSD in Fire Area G1, FZ 25A)
- 05000313/FIN-2009002-02 + (Inadequate Service Air Compressor Torquie Value Led to Loss of Control Rod Drive Cooling and Manual Reactor Trip)
- 05000298/FIN-2010002-02 + (Inadequate Service Water Pump Room Loss of Heat Calculation)
- 05000338/FIN-2010004-05 + (Inadequate Set Point for Balance-of-Plant Bus Undervoltage Relay)
- 05000259/LER-2013-005, Inadequate Shift Staffing to Support Implementation of the Safe Shutdown Instructions + (Inadequate Shift Staffing to Support Implementation of the Safe Shutdown Instructions)
- ENS 49406 + (Inadequate Shift Staffing to Support Implementation of Safe Shutdown Instructions)
- 05000483/FIN-2008005-01 + (Inadequate Shutdown risk Assessment for Maintenance Activities in the Reactor Building)
- 05000482/FIN-2010005-11 + (Inadequate Simulation Facility Fidelity)
- 05000341/FIN-2015003-01 + (Inadequate Simulator Fidelity Regarding the Ability to Model Thermal-Hydraulic Instabilities)
- 05000458/FIN-2011008-09 + (Inadequate Simulator Fidelity for Emergency Diesel Generator Loading)
- 05000311/FIN-2014003-01 + (Inadequate Solid Pressurizer Control Resulted in Low Temperature Overpressure Relief Lifting)
- 05000220/FIN-2012003-03 + (Inadequate Special Operating Procedure for Loss of Spent Fuel Pool Cooling)
- 05000286/FIN-2017001-01 + (Inadequate Standard Operation Procedure for the Backup Spent Fuel Pool Cooling System)
- 05000458/FIN-2011004-01 + (Inadequate Standby Gas Treatment Electric Heater Power Output Calculation)
- 05000263/FIN-2014003-01 + (Inadequate Standby Liquid Control Quarterly Pump and Valve Test Due to Proceduralized Unacceptable Preconditioning)
- Information Notice 2001-13, Inadequate Standby Liquid Control System Relief Valve Margin + (Inadequate Standby Liquid Control System Relief Valve Margin)
- 05000263/FIN-2012007-01 + (Inadequate Station Battery Capacity Test Procedure)
- 05000382/FIN-2014007-02 + (Inadequate Station Procedures for Temporary Emergency Diesel Generator)
- 05000395/FIN-2010003-01 + (Inadequate Station Tagout Procedure for Controlling Safety and Non-safety Related Grounding Equipment Results in Loss of All Balance of Plant Power and Switchgear Fires)
- 05000317/FIN-2013003-02 + (Inadequate Steam Generator Tube Rupture Emergency Operating Procedure)
- 05000445/FIN-2011004-03 + (Inadequate Supervision Causes Inadvertent Engineered Safety Features Actuation)
- 05000259/FIN-2009002-02 + (Inadequate Surveillance Procedure Causes Loss of Unit 1 RHR System Safety Function (Section 1R22))
- 05000293/FIN-2009005-03 + (Inadequate Surveillance Procedure Resulting in Failed Standby Liquid Control Train)
- 05000387/FIN-2011004-05 + (Inadequate Surveillance Procedure Results in Missed Technical Specification Surveillance Requirements for Secondary Containment)
- 05000483/FIN-2008003-02 + (Inadequate Surveillance Procedure Resulted in an Inoperable ECCS)
- 05000259/FIN-2010002-04 + (Inadequate Surveillance Procedure To Ensure All Relevant RPV Metal Temperatures Were Monitored During RPV Hydrostatic/In-service Leak Testing)
- 05000483/FIN-2010003-01 + (Inadequate Surveillance Procedure to Verify and Maintain Emergency Core Cooling System Operable)
- 05000321/FIN-2012003-03 + (Inadequate Surveillance Procedures for Evaluating Accumulated Gas in the HPCI and RCIC System)
- 05000424/FIN-2009005-02 + (Inadequate Surveillance Procedures for TS SR 3.7.8.2)
- 05000528/LER-2007-005, Inadequate Surveillance Test Procedure Resulted in Failure to Meet Surveillance Requirement + (Inadequate Surveillance Test Procedure Resulted in Failure to Meet Surveillance Requirement)
- 05000528/LER-2007-004, Inadequate Surveillance Test Procedure Resulted in Failure to Meet Surveillance Requirement + (Inadequate Surveillance Test Procedure Resulted in Failure to Meet Surveillance Requirement)
- 05000311/FIN-2016004-02 + (Inadequate Surveillance Test Procedure Results in Water Hammer and Reactor Trip)
- 05000331/FIN-2009003-02 + (Inadequate Surveillance Test Procedure Revision Results in a Plant Scram)
- 05000498/FIN-2009002-03 + (Inadequate Surveillance Test for Component Cooling Water)
- ENS 47306 + (Inadequate Surveillance Testing of Emergency Diesel Generators)
- 05000410/FIN-2014003-01 + (Inadequate Surveillance Testing of Reactor Core Isolation Cooling during 165 psig Reactor Pressure Test for Surveillance Requirement 3.5.3.4)
- Information Notice 1985-23, Inadequate Surveillance and Postmaintenance and Postmodification System Testing + (Inadequate Surveillance and Postmaintenance and Postmodification System Testing)
- 05000369/FIN-2017002-01 + (Inadequate Survey Results in Unposted HRA)
- 05000482/FIN-2008003-05 + (Inadequate Switchyard Work Proceudre Resulted in a Loss of Offsite Power)
- 05000263/FIN-2011002-01 + (Inadequate System Isolation during Check Valve Maintenance)
- 05000289/FIN-2012002-03 + (Inadequate System Monitoring Results in Multiple IA-P-4 Trips)