05000266/FIN-2009003-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Inadequate Seismic Assessment of Temporary Cable Installations Above Motor-Driven Auxiliary Feedwater Pumps |
Description | The inspectors identified a finding of very low safety significance (Green) and associated Non-Cited Violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure of the licensees modification process to ensure that new 4160-volt cables installed for proposed auxiliary feedwater (AFW) pump motor replacements were installed in accordance with applicable regulatory requirements. Specifically, no seismic design evaluation was completed prior to the installation of the cable coils suspended above the existing motor-driven AFW pumps for over 6 months. In response to the issue, the licensee installed a new restraint designed to meet seismic criteria and completed calculations that showed the as-left condition of the modification did not challenge operability. This performance deficiency was more than minor because it was associated with the Mitigating System Cornerstone attribute of design control and adversely affected the cornerstone objectives of ensuring the availability, reliability, and capability of systems to respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, once identified, the modification required rework to comply with applicable design requirements. The inspectors determined the finding was of very low safety significance (Green) because the issue did not result in the actual loss of a safety function. The inspectors also determined the finding has a cross-cutting aspect in the area of human performance, work control, because the licensee failed to incorporate risk insights and planned contingencies into work plans (H.3(a)) |
Site: | Point Beach |
---|---|
Report | IR 05000266/2009003 Section 1R04 |
Date counted | Jun 30, 2009 (2009Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.04 |
Inspectors (proximate) | R Ruiz J Jandovitz J Jacobson M Kunowski N Feliz-Adomo |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |
Finding - Point Beach - IR 05000266/2009003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Point Beach) @ 2009Q2
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||