Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000440/FIN-2014002-01 + (Inadequate Procedure for Extreme Cold Weather)
- 05000482/FIN-2010008-02 + (Inadequate Procedure for Fill and Vent of the Component Cooling Water System)
- 05000331/FIN-2014008-05 + (Inadequate Procedure for Flow Balancing ESW System)
- 05000244/FIN-2011003-02 + (Inadequate Procedure for Fuel Transfer Flange Installation)
- 05000263/FIN-2016007-01 + (Inadequate Procedure for Identification of Significant Conditions Adverse to Quality)
- 05000400/FIN-2011003-02 + (Inadequate Procedure for Identifying Accumulated Gas in ECCS Systems)
- 05000335/FIN-2010004-02 + (Inadequate Procedure for Installation of PZ Safety Valves)
- 05000269/FIN-2011010-05 + (Inadequate Procedure for Installation of SSF Submersible Pump)
- 05000269/FIN-2012002-03 + (Inadequate Procedure for Installation of Safetyrelated Control Cables)
- 05000333/FIN-2012003-02 + (Inadequate Procedure for Installation of Reactor Water Recirculation Motor- Generator Scoop Tube Positioners)
- 05000285/FIN-2013013-18 + (Inadequate Procedure for Intake Cell Level Control During a Flooding Event)
- 05000335/FIN-2010002-02 + (Inadequate Procedure for Main Steam Isolation Valve Testing)
- 05000220/FIN-2009002-02 + (Inadequate Procedure for Main Steam Isolation Valve Troubleshooting)
- 05000338/FIN-2014004-01 + (Inadequate Procedure for Maintaining MCR/ESGR Air Handler)
- 05000324/FIN-2008003-01 + (Inadequate Procedure for Performing Maintenance on the Control Room AC Subsystem)
- 05000440/FIN-2014005-02 + (Inadequate Procedure for Performing an Acceptable Technical Specification Required Channel Check)
- 05000286/FIN-2018001-02 + (Inadequate Procedure for Placing Chemical and Volume Control System Demineralizer In Service)
- 05000338/FIN-2009008-03 + (Inadequate Procedure for Powering Credited Components for Fire in Cable Vault & Tunnel)
- 05000255/FIN-2014004-01 + (Inadequate Procedure for Protection against High Winds)
- 05000316/FIN-2012008-08 + (Inadequate Procedure for RCS Vacuum Fill During Reduced Inventory Operations)
- 05000369/FIN-2009006-01 + (Inadequate Procedure for RN System Flow Balancing)
- 05000353/FIN-2015003-01 + (Inadequate Procedure for RWCU Backwashing Operations)
- 05000361/FIN-2009002-04 + (Inadequate Procedure for Reactivity Manipulations)
- 05000313/FIN-2009002-01 + (Inadequate Procedure for Reactor Protection System Maintenance)
- 05000313/FIN-2008005-02 + (Inadequate Procedure for Reactor Vessel Head Lift)
- 05000327/FIN-2007006-03 + (Inadequate Procedure for Reduced INVENTORY/MID-LOOP Operation)
- 05000416/FIN-2013002-06 + (Inadequate Procedure for Removal of a Foreign Material Exclusion Plug)
- 05000316/FIN-2012008-05 + (Inadequate Procedure for Responding to a MODE 4 LOCA)
- 05000335/FIN-2010004-03 + (Inadequate Procedure for Restoration of Non-Essential CCW Flow Following SIAS)
- 05000335/FIN-2009006-04 + (Inadequate Procedure for Restoration of Non-Essential CCW Flow Following a SIAS)
- 05000335/FIN-2012008-01 + (Inadequate Procedure for Severe Weather Mitigation)
- 05000313/FIN-2015002-01 + (Inadequate Procedure for Severe Weather Preparation)
- 05000458/FIN-2018301-01 + (Inadequate Procedure for Shutdown Operations Protection Plan)
- 05000458/FIN-2008004-01 + (Inadequate Procedure for Staging the Station Blackout Diesel Generator during Severe Weather)
- 05000271/FIN-2008008-03 + (Inadequate Procedure for Station Blackout Load Shedding (Section 1R21.2.2.1))
- 05000482/FIN-2010005-10 + (Inadequate Procedure for Steam Generator Hi-Hi Turbine Trip)
- 05000445/FIN-2015008-03 + (Inadequate Procedure for Surveillance on Safety-Related Service Water Systems)
- 05000390/FIN-2017004-02 + (Inadequate Procedure for Temporary Configuration Changes)
- 05000482/FIN-2012009-03 + (Inadequate Procedure for Temporary Fire Pump)
- 05000244/FIN-2008010-02 + (Inadequate Procedure for Testing Reactor Trip Breakers)
- 05000305/FIN-2013003-01 + (Inadequate Procedure for Testing of the Diesel Room Ventilation Damper Actuator Back Up Air System)
- 05000445/FIN-2013003-01 + (Inadequate Procedure for Testing the Main Steam Safety Valves)
- 05000382/FIN-2015001-04 + (Inadequate Procedure for Tightening Thermal Overload Connections for Safety-Related Components)
- 05000247/FIN-2018003-04 + (Inadequate Procedure for Turbine Startup Caused a Reactor Trip)
- 05000305/FIN-2009006-05 + (Inadequate Procedure for a Battery Room Flooding Event)
- 05000346/FIN-2009007-05 + (Inadequate Procedure for a Loss of Coolant Accident Outside Containment)
- 05000325/FIN-2015002-02 + (Inadequate Procedure for the 1B Conventional Service Water Pump Strainer Repair)
- 05000324/FIN-2016003-03 + (Inadequate Procedure for the 2B RHRSW Subsystem Operability Test)
- 05000324/FIN-2015004-01 + (Inadequate Procedure for the 2C RHRSW Booster Pump Motor Bearings)
- 05000348/FIN-2009007-01 + (Inadequate Procedure for the B train SSPS System Testing)
- 05000387/FIN-2013003-03 + (Inadequate Procedure to Control and Monitor RCS Heatup Rate)