A list of all pages that have property "Title" with value "Fourth Interval Inservice Inspection Examination Plan. Revision 3". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20040F081  + (Fourth Interim Rept of Significant Const Deficiency 27 Re Switchgear Breaker Position Switch Operator.Addl Time Needed to Verify Adequacy of Rework & Documentation & Receive Replacement Part.Next Rept by 820315)
  • ML20097C649  + (Fourth Interim Rept of Significant Const Deficiency 105 Re Electrical Separation Deficiencies (Reg Guide 1.75). Initially Reported on 840817.Next Rept to Be Provided on 840921)
  • W3P84-2697, Fourth Interim Rept of Significant Const Deficiency 114 Re Damaged safety-related Sys Due to Water Hammers.Initially Reported on 840914.Corrective Action Verification Ongoing. Finalization Anticipated by 841019  + (Fourth Interim Rept of Significant Const Deficiency 114 Re Damaged safety-related Sys Due to Water Hammers.Initially Reported on 840914.Corrective Action Verification Ongoing. Finalization Anticipated by 841019)
  • ML20078A432  + (Fourth Interim Rept on Significant Const Deficiency 70 Re GE 480-volt Trip Coils Failing to Drop Out After Tripping. Corrective Action Completed & Supporting Documentation Under Review.Final Rept Will Be Submitted by 831011)
  • ML20072J673  + (Fourth Interim Rept on Significant Const Deficiency 68 Re Spurious ESF Actuation Sys Operation.Required Mods Completed.Testing Still Underway.Final Rept Will Be Submitted by 830826)
  • ML19254D333  + (Fourth Interim Rept on TMI-2 Accident)
  • ML20095H318  + (Fourth Interim Significant Const Deficiency Rept 90 Re Overstressed Electrical Conduit.Initially Reported on 840716.Corrective Action Incomplete.Final Rept Will Be Submitted by 840830)
  • ML20054H975  + (Fourth Interim Significant Const Deficiency Rept 40 Re ITE-Gould Starter Coil Failure in Containment Cooling Fans, Initially Reported on 820616.Final Review in Progress.Final Rept Expected by 820712)
  • ML20039G623  + (Fourth Interim Significant Const Deficiency Rept Re Base Metal Defect in Main Steam & Feedwater Containment Penetration Anchors.Extent of Necessary Repairs Requires Postponement of Final Rept Until 820317)
  • ML20081H738  + (Fourth Interim Significant Const Deficiency Rept 78 Re American Bridge Structural Steel Defects.Addl Welds & Bolted Connections Requiring Rework Identified W/Scheduled Completion by 831118.Final Rept Expected by 831222)
  • ML20091A135  + (Fourth Interim Significant Const Deficiency Rept 102 Re Failure to Install Dowels & Shear Blocks.Initially Reported on 840427.Addl Corrective Action Required.Completion Scheduled for Late May 1984.Final Rept Expected on 840525)
  • ML20082P550  + (Fourth Interim Significant Const Deficiency Rept 81 Re Shelf Life Exceeded on Cable Splice & Termination Tape.Review of Test Results Scheduled to Be Completed in Early Dec 1983. Final Rept Will Be Submitted by 831215)
  • ML20071M511  + (Fourth Interim Significant Const Deficiency Rept 34 Re HVAC Fan Shrouds.Corrective Action Not Completed Due to Delay in Delivery of Three Clips.Final Rept Expected by 830111)
  • ML20087L130  + (Fourth Interim Significant Const Deficiency Rept 80 Re Unsatisfactory Stroking of Emergency Feedwater Turbine Steam Shutoff Valves.Further Testing During post-core Hot Functional Testing Required.Next Rept by 840713)
  • ML20071L869  + (Fourth Interim Significant Const Deficiency Rept 41 Re Unapproved Welding.Final Rept Cannot Be Submitted Until 830113,due to Delay in Contractor Review of Heat Treatment)
  • ML20027C175  + (Fourth Interim Significant Const Deficiency Rept 33 Re Chilled Water Pipe Supports.Corrective Action Not Yet Complete.Final Rept Expected by 830311)
  • ML20080L881  + (Fourth Interim Significant Const Deficiency Rept 79 Re Unqualified Components in Hydrogen Analyzers.Completion of Corrective Action Delayed Until 831014 Due to Design Changes.Final Rept Will Be Submitted by 831110)
  • ML20084M325  + (Fourth Interim Significant Const Deficiency Rept 99 Re Isolation Valves on Safety Injection Tanks.Investigation Incomplete.Final Rept Will Be Submitted on 840525)
  • ML20039G596  + (Fourth Interim Significant Deficiency Rept 23 Re Defective Valve Actuators.Replacement Matl Received & Work Orders Issued to Replace 10 Valve Actuators.Completion Expected by 811224.Final Rept Will Be Submitted by 820108)
  • ML091250484  + (Fourth Interval ISI Program Response to Request for Information for NDE-004)
  • ML091250357  + (Fourth Interval ISI Program, Response to Request for Information Regarding NDE-005)
  • ML092090789  + (Fourth Interval Inservice Inspection (ISI) Program, Rev. 7)
  • ML110890748  + (Fourth Interval Inservice Inspection (ISI) Program Relief Request ISI-04 - R. E. Ginna Nuclear Power Plant)
  • ML14142A089  + (Fourth Interval Inservice Inspection (ISI) Program, System Pressure Testing (Spt), SPT-003 and SPT-002)
  • L-MT-04-050, Fourth Interval Inservice Inspection Examination Plan, Revision 2  + (Fourth Interval Inservice Inspection Examination Plan, Revision 2)