Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20040F081 + (Fourth Interim Rept of Significant Const Deficiency 27 Re Switchgear Breaker Position Switch Operator.Addl Time Needed to Verify Adequacy of Rework & Documentation & Receive Replacement Part.Next Rept by 820315)
- ML20097C649 + (Fourth Interim Rept of Significant Const Deficiency 105 Re Electrical Separation Deficiencies (Reg Guide 1.75). Initially Reported on 840817.Next Rept to Be Provided on 840921)
- W3P84-2697, Fourth Interim Rept of Significant Const Deficiency 114 Re Damaged safety-related Sys Due to Water Hammers.Initially Reported on 840914.Corrective Action Verification Ongoing. Finalization Anticipated by 841019 + (Fourth Interim Rept of Significant Const Deficiency 114 Re Damaged safety-related Sys Due to Water Hammers.Initially Reported on 840914.Corrective Action Verification Ongoing. Finalization Anticipated by 841019)
- ML20078A432 + (Fourth Interim Rept on Significant Const Deficiency 70 Re GE 480-volt Trip Coils Failing to Drop Out After Tripping. Corrective Action Completed & Supporting Documentation Under Review.Final Rept Will Be Submitted by 831011)
- ML20072J673 + (Fourth Interim Rept on Significant Const Deficiency 68 Re Spurious ESF Actuation Sys Operation.Required Mods Completed.Testing Still Underway.Final Rept Will Be Submitted by 830826)
- ML19254D333 + (Fourth Interim Rept on TMI-2 Accident)
- ML20095H318 + (Fourth Interim Significant Const Deficiency Rept 90 Re Overstressed Electrical Conduit.Initially Reported on 840716.Corrective Action Incomplete.Final Rept Will Be Submitted by 840830)
- ML20054H975 + (Fourth Interim Significant Const Deficiency Rept 40 Re ITE-Gould Starter Coil Failure in Containment Cooling Fans, Initially Reported on 820616.Final Review in Progress.Final Rept Expected by 820712)
- ML20039G623 + (Fourth Interim Significant Const Deficiency Rept Re Base Metal Defect in Main Steam & Feedwater Containment Penetration Anchors.Extent of Necessary Repairs Requires Postponement of Final Rept Until 820317)
- ML20081H738 + (Fourth Interim Significant Const Deficiency Rept 78 Re American Bridge Structural Steel Defects.Addl Welds & Bolted Connections Requiring Rework Identified W/Scheduled Completion by 831118.Final Rept Expected by 831222)
- ML20091A135 + (Fourth Interim Significant Const Deficiency Rept 102 Re Failure to Install Dowels & Shear Blocks.Initially Reported on 840427.Addl Corrective Action Required.Completion Scheduled for Late May 1984.Final Rept Expected on 840525)
- ML20082P550 + (Fourth Interim Significant Const Deficiency Rept 81 Re Shelf Life Exceeded on Cable Splice & Termination Tape.Review of Test Results Scheduled to Be Completed in Early Dec 1983. Final Rept Will Be Submitted by 831215)
- ML20071M511 + (Fourth Interim Significant Const Deficiency Rept 34 Re HVAC Fan Shrouds.Corrective Action Not Completed Due to Delay in Delivery of Three Clips.Final Rept Expected by 830111)
- ML20087L130 + (Fourth Interim Significant Const Deficiency Rept 80 Re Unsatisfactory Stroking of Emergency Feedwater Turbine Steam Shutoff Valves.Further Testing During post-core Hot Functional Testing Required.Next Rept by 840713)
- ML20071L869 + (Fourth Interim Significant Const Deficiency Rept 41 Re Unapproved Welding.Final Rept Cannot Be Submitted Until 830113,due to Delay in Contractor Review of Heat Treatment)
- ML20027C175 + (Fourth Interim Significant Const Deficiency Rept 33 Re Chilled Water Pipe Supports.Corrective Action Not Yet Complete.Final Rept Expected by 830311)
- ML20080L881 + (Fourth Interim Significant Const Deficiency Rept 79 Re Unqualified Components in Hydrogen Analyzers.Completion of Corrective Action Delayed Until 831014 Due to Design Changes.Final Rept Will Be Submitted by 831110)
- ML20084M325 + (Fourth Interim Significant Const Deficiency Rept 99 Re Isolation Valves on Safety Injection Tanks.Investigation Incomplete.Final Rept Will Be Submitted on 840525)
- ML20039G596 + (Fourth Interim Significant Deficiency Rept 23 Re Defective Valve Actuators.Replacement Matl Received & Work Orders Issued to Replace 10 Valve Actuators.Completion Expected by 811224.Final Rept Will Be Submitted by 820108)
- ML091250484 + (Fourth Interval ISI Program Response to Request for Information for NDE-004)
- ML091250357 + (Fourth Interval ISI Program, Response to Request for Information Regarding NDE-005)
- ML092090789 + (Fourth Interval Inservice Inspection (ISI) Program, Rev. 7)
- ML110890748 + (Fourth Interval Inservice Inspection (ISI) Program Relief Request ISI-04 - R. E. Ginna Nuclear Power Plant)
- ML14142A089 + (Fourth Interval Inservice Inspection (ISI) Program, System Pressure Testing (Spt), SPT-003 and SPT-002)
- L-MT-04-050, Fourth Interval Inservice Inspection Examination Plan, Revision 2 + (Fourth Interval Inservice Inspection Examination Plan, Revision 2)
- L-MT-05-039, Fourth Interval Inservice Inspection Examination Plan. Revision 3 + (Fourth Interval Inservice Inspection Examination Plan. Revision 3)
- ML100330125 + (Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Requests)
- ML082880160 + (Fourth Interval Inservice Inspection Plan and Associated Proposed Alternatives and Relief Requests)
- HNP-17-025, Fourth Interval Inservice Inspection Plan, Third Interval Containment Inservice Inspection Plan, and Fourth Interval Inservice Inspection Pressure Test Plan + (Fourth Interval Inservice Inspection Plan, Third Interval Containment Inservice Inspection Plan, and Fourth Interval Inservice Inspection Pressure Test Plan)
- ML033500241 + (Fourth Interval Inservice Inspection Program, Response to Request for Additional Information)
- NRC 2002-0067, Fourth Interval Inservice Inspection Program Relief Request No. 10 Drawings + (Fourth Interval Inservice Inspection Program Relief Request No. 10 Drawings)
- ML041130371 + (Fourth Interval Inservice Inspection Program Request for Additional Information Response)
- ML042730527 + (Fourth Interval Inservice Inspection Program Withdrawal of Relief Request SPT-001)
- ML032471647 + (Fourth Interval Inservice Inspection Program)
- ML023510289 + (Fourth Interval Inservice Inspection Program)
- RS-03-194, Fourth Interval Inservice Inspection Program Plan + (Fourth Interval Inservice Inspection Program Plan)
- SVP-03-019, Fourth Interval Inservice Inspection Program Plan + (Fourth Interval Inservice Inspection Program Plan)
- ML022610709 + (Fourth Interval Inservice Inspection Program Plan, Attachment C)
- ML022610153 + (Fourth Interval Inservice Inspection Program Plan, Attachments a and B)
- NRC 2002-0024, Fourth Interval Inservice Inspection Program, Plan & Schedule + (Fourth Interval Inservice Inspection Program, Plan & Schedule)
- SBK-L-20132, Fourth Interval Inservice Testing (IST) Program + (Fourth Interval Inservice Testing (IST) Program)
- ML090580295 + (Fourth Interval Inservice Testing Program Relief Request No. VR-14 R. E. Ginna Nuclear Power Plant)
- ML102360041 + (Fourth Interval Inservice Testing Program Plan, Pump Relief Request P-6, Response to Request for Additional Information)
- ML090540063 + (Fourth Interval Inservice Testing Program. Submittal of 10 CFR 50.55a Request Number VR-14)
- ML093350600 + (Fourth Interval Inservice Testing Program Plan and Proposed Alternatives and Relief Requests)
- RS-03-221, Fourth Interval Inservice Testing Program Plan + (Fourth Interval Inservice Testing Program Plan)
- ML050600277 + (Fourth Interval Inservice Testing Program Revised Relief Request P-8)
- ML042460632 + (Fourth Interval Inservice Testing Program Revised Relief Requests P-2)
- JAFP-07-0116, Fourth Interval Inservice Testing Program for Pumps and Valves + (Fourth Interval Inservice Testing Program for Pumps and Valves)
- NL-07-0987, Fourth Interval Inspection (ISI) Plan Correction + (Fourth Interval Inspection (ISI) Plan Correction)
- EPID:L-2018-LLR-0081 + (Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan)