Fourth Interim Significant Const Deficiency Rept Re Base Metal Defect in Main Steam & Feedwater Containment Penetration Anchors.Extent of Necessary Repairs Requires Postponement of Final Rept Until 820317
ML20039G623
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/05/1981
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K81-0481, W3K81-481, NUDOCS 8201180523
Download: ML20039G623 (1)


Text

O LoulSIANA OWER & LIGHT

,42 OctAnONOc stater P O BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366 2345 b'$20$ SOY 2u g ggQ$yED January 5, 1982

- gp. jg G. D. McLENDON C- g[b ~ Senior Vice President gE:st8h W3K81-0481 g Tut Q-3-A35.07.17 s

Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Fourth Interim Report Significant Construction Deficiency No. 17

" Base Metal Defect in Main Steam and Feedwater Containment Penetration Anchors"

REFERENCE:

Interim Report W3K81-0386 dated 10/20/81

Dear Mr. Collins:

In the referenced interim report, LP&L committed to submit a final report on Significant Construction Deficiency No. 17 by January 29, 1982.

Again the extent of repairs necessary to completa the corrective action on this deficiency has made it impossible to meet this deadline.

A final report on this item will be submitted by March 17, 1982.

If there are any questions, please let us know.

Very truly yours, l

. A JR '

GDMcL:WMM:ncd l

! 1) Director Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission \

Washington, D. C. 20555

2) Director Of fice of Management Information and Program Control S3 &

U. S. Nuclear Regulato y Commission ,

Washington, D. C. 20555 8201180523 820105 PDR ADOCK 05000382 S PDR