ML20071M511
| ML20071M511 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 09/14/1982 |
| From: | Maurin L LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, W3182-0033, NUDOCS 8209270155 | |
| Download: ML20071M511 (2) | |
Text
--
1 LOUISIANA 142 ORAHONDE STRHT POWE R & L1G H T P O BOX 6008
- NEW ORLEANS. LOUISIANA 70174 * (504) 366-2345
' ifi'0U$?NU L. V. MAURIN September 14, 1982 vite President Nuclear Operations W3I82-0033 Q A35. 07. 34
- Ir Q
Mr. John T. Collins, Regional Administrator, Region IV
- W 4 ; 1..
U. S. Nuclear Regulatory Commission s
611 Ryan Plaza Drive, Suite 1000 g l g pq7 Arlington, Texas 76012
~ '
i.
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency Report No. 34
" Buffalo Forge HVAC Fan Shrouds" Fourth Interim Report
REFERENCES:
(1) LP&L Letter W3K-81-0285 dated August 10, 1981 (2) LP&L Letter W3K-82-0367 dated June 24, 1982
Dear Mr. Collins:
Due to a delay in the delivery of three (3) clips needed to correct the problem, the corrective action has not yet been completed. A final report will therefore be submitted by January 11, 1983.
Very truly yours,
&M4-r1 L. V. Maurin LVM/ MAL:keh cc:
- 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission h]
Washington, D. C.
20555 f
/ p E'209270155 820914 PDR ADOCK 05000302 S
I O
s'
'd Mr. John T. Collins 2
Page 2 bec: Ebasco (2), J. M. Brooks, R. J. Milhiser (2), F. J. Drummond, T. F. Gerrets, C. J. Decateaux, T. K. Armington, P. V. Prasankumar,-
J. R. McGaha, J. F. Fager, Richard Hymes', L. L. Bass, M. I. Meyer, R. W. - Prados, K. R. Iyengar, J. J. Lewis, L. V. Maurin, W. M. Morgan, G. D. McLendon, G. B. Rogers, Les Constable, Licensing Library, Central Records
.