-"1 POWE R & L1G H T /Waterford 3 SES/P. O. Box B/Killona, LA 70066 UTluSINkY November 22, 1983 W3K83-1831 Q-3-A35.07.81 Pg j e r;f ~
l i
h tE_ili s t; l
Regional Administrator, Region IV
- O ; g _. l c '
Mr. John T. Collins U. S. Nuclear Regulatory Commission U L _ _ _
611 Ryan Plaza Drive, Suite 1000 l
Arlington, Texas 76012
REFERENCE:
LP&L Letter W3I83-0292 dated August 30, 1983
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 81
" Shelf Life Exceeded on Cable Splice and Termination Tape" Fourth Interim Report The above referenced letter indicated submittal of a Final Report to the USNRC no later than November 25, 1983.
At the present time, a review of the test results submitted by the Okonite Company is scheduled to bc complet0a in early December 1983.
A Final Report will be submitted to the USNRC on December 15, 1983.
Very truly yours, U1 9 C. F. Gerrets T
Quality Assurance Manager TFG:CNH:SSTG cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 h
AD 0
S J6Y 4
~
f Mr. John T. Collins November 22, 1983 W3K83-1831 Page 2 cc: Director f
Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W..
Washington,-D.C.
20036 Mr. W. M. Stevensen Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130