Text
~s
- b Louisiama P O W E R & LIG H T/Waterford 3 SES/P. O. Box B/Killona, LA 70066 Eui$5IsN!U August 30, 1984 W3K84-2035 Q-3-A35.07.105 Mr. John T. Collins Regional Administrator, Region IV p Q ] ] g ] [t U. S. Nuclear Regulatory Commission i l a r-I i
llf'
${p _ *{ g 611 Ryan Plaza Drive, Suite 1000 j]a j'
Arlington, Texas 76012 i
n
REFERENCE:
LP&L letter W3K84-1904 dated August 17, 1984 LW
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 105
" Electrical Separation Deficiencies (Regulatory Guide 1.75)"
Fourth Interim Report The above referenced letter indicated submittal of an Interim and/or Final Report to the USNRC on August 31, 1984.
At the present time, corrective actions discovered in the walk down effort are scheduled to be completed in mid September 1984. An Interim and/or Final Report is scheduled to be submitted to the USNRC on September 21, 1984.
Very truly yours.
T. F. Cerrets Corporate Quality Assurance Manager TFC:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8409170185 840830
[h PDR ADOCK 05000382 S
pyg Q
A..
l}/
Mr. John T. Collins August' 30, 1984 W3K84-2035
-Page 2 cc: Director
' Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 t
Mr. W. A. Cross i
7910 Woodmont Avenue Suite 1200 Bethesda, Maryland 20814 l
- _ _ _ _ _ _ _ _ _ _ - _ - _ _.