ML20072J673

From kanterella
Jump to navigation Jump to search
Fourth Interim Rept on Significant Const Deficiency 68 Re Spurious ESF Actuation Sys Operation.Required Mods Completed.Testing Still Underway.Final Rept Will Be Submitted by 830826
ML20072J673
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/22/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0226, W3I83-226, NUDOCS 8306300188
Download: ML20072J673 (1)


Text

7 LOUISIANA 442 octAnoNot Sincer P O W E F1 & L 1 G H T! P O BOX 6000

'#$0$ 5vsYE u

June 22, 1983 W3183-0226 Q-3-A35.07.68 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

[h [g]%

SUBJECT:

Waterford SES Unit No. 3 M 2 41983  !

Docket No. 50-382

  • - I Significant Construction Deficiency No. 68

" Spurious ESFAS Actuation" Fourth Interim Report

REFERENCE:

LP&L letter W3183-0195 dated May 30, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC no later than June 24, 1983.

All required modifications have now been completed, however testing is still underway. A Final Report will therefore be submitted to the USNRC by August 26, 1983.

Very truly yours, Y/

F. J. Drummond Project Support Manager - Nuclear l cc: 1) Director 3) Mr. E. L. Blake Office of Inspection 6 Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director 4) Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l 8306300188 830622

} /

l PDR ADOCK 05000302

, S PM L