Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17139B206 + (Forwards Updated Draft SER Suppl 4.Emergency Svc Water Sys Resolution Provided in Sections 6.3.4 & 9.2.1 Per 821105 Memo.W/O Encl)
- U-600079, Forwards Updated Draft Tech Specs for Review.Changes Constitute plant-specific Changes to Setpoints Resulting from Review of Design Documents & as-built Info,Per 850525 Meeting + (Forwards Updated Draft Tech Specs for Review.Changes Constitute plant-specific Changes to Setpoints Resulting from Review of Design Documents & as-built Info,Per 850525 Meeting)
- ML20054D388 + (Forwards Updated Draft of Basic Technique & Models for Determining Exposure Rates Over U-Bearing Soils. Concurrence W/Revisions Requested)
- ML20127L334 + (Forwards Updated Draft of Proposed Environ TS for Monticello Nuclear Generating Plant)
- ML20127J358 + (Forwards Updated Draft of Proposed Environ TS for Plant)
- ML19210B747 + (Forwards Updated Drawings Re Certificate of Compliance 5980.Amend to Certificate Is Requested.Amend Fee & Oversize Drawings Encl)
- ML20096B271 + (Forwards Updated ECT Data from Vendor D Using Gimballed Plus Point 300 Khz Conventional Analysis Not Using Axial View Technique)
- ML20035F103 + (Forwards Updated ERDS Data Point Libraries,Per NUREG-1394, Rev 1,App C.Changes Reflect Corrections Made During ERDS Testing)
- ML19351D000 + (Forwards Updated Economic Costs Used in Crac Model.Comments Requested)
- ML20090A681 + (Forwards Updated Eg&G Rept to Replace Encl to 791114 Safety Evaluation for facility.N-1 Loop Operating Changes Are Editorial & Emphasize That ECCS Analysis Requires Addl Review)
- ML19208D188 + (Forwards Updated Electrical Instrumentation & Control Drawings Noted in FSAR Table 1.7-1.Drawings Available in Central Files)
- ML19260C436 + (Forwards Updated Electrical,Instrumentation & Control Drawings Listed in FSAR Section 1.7.List of Drawings & Revision Status Encl.Drawings Available in Central Files Only)
- ML17296B227 + (Forwards Updated Electrical,Instrumentation & Control Drawings Listed in FSAR Table 1.7.1,in Response to NRC 810122 Request.W/O Encl)
- ML20246D439 + (Forwards Updated Emergency Operating Procedure Rev Schedule, Per Insp Repts 50-277/89-81 & 50-278/89-81 & NUREG-1358. Plant-specific Technical Guidelines Not Controlled Document)
- ML20155A489 + (Forwards Updated Emergency Phone Number List from Emergency Implementing Procedures Manual)
- LIC-93-0178, Forwards Updated Emergency Plan Forms Index,Including Rev 0 to Emergency Procedure Form FC-EPF-34 & Updated EPIPs Index, Including Rev 0 to EPIP-RR-23, Chemistry Liaison Actions + (Forwards Updated Emergency Plan Forms Index,Including Rev 0 to Emergency Procedure Form FC-EPF-34 & Updated EPIPs Index, Including Rev 0 to EPIP-RR-23, Chemistry Liaison Actions)
- ML20117G143 + (Forwards Updated Emergency Plan Implementing Procedures EPIP-04,20 & 22.Procedures Withheld (Ref 10CFR2.790 & 9.5))
- ML17299A306 + (Forwards Updated Emergency Plan Implementing Procedures, (EPIP) Including 7N409.03.00,7N409.04.00 & 7N409.07.00 Which Generally Replace EPIP 35.W/o Encls)
- ML17300B034 + (Forwards Updated Emergency Plan Implementing Procedures, Including Rev 11 to EPIP 03,Rev 0 to EPIP 14 & Rev 5 to EPIP 33.Procedures Withheld,Per Generic Ltr 81-27 & 10CFR2.790(a) & 9.5(a))
- ML093441279 + (Forwards Updated Emergency Plan, Vol II, Emergency Response Activation & Emergency Plan,Vol III, Implementing Procedures)
- ML18081B004 + (Forwards Updated Emergency Plan,Submittal 2)
- ML20126J356 + (Forwards Updated Emergency Preparedness Evaluation Rept Reflecting Findings by FEMA & Addl Info Provided by Licensee)
- ML20099B210 + (Forwards Updated Emergency Response Data Sys Data Point Library,Per NRC Request)
- TXX-4399, Forwards Updated Engineering & Const Status Rept.Pages Deleted for Items Whose Deferral Beyond Fuel Load Has Been Accepted by NRC + (Forwards Updated Engineering & Const Status Rept.Pages Deleted for Items Whose Deferral Beyond Fuel Load Has Been Accepted by NRC)
- ML20003F627 + (Forwards Updated Entries for NUREG-0030, Const Status Rept)
- ML20005E327 + (Forwards Updated Environ Evaluation Pages Submitted W/ Licensee)
- ML20214V904 + (Forwards Updated Environ Qualification Program for Safety- Related Mechanical Equipment in Response to FSAR Questions 270.2 & 270.3 Identified in FSAR Amend 4.Qualification Methodology & Results Discussed)
- RBG-22090, Forwards Updated Environ Qualification Summary Listing of Justifications for Interim Operation.Environ Qualification for Listed Equipment Completed + (Forwards Updated Environ Qualification Summary Listing of Justifications for Interim Operation.Environ Qualification for Listed Equipment Completed)
- L-82-152, Forwards Updated Equipment List Providing Status of Equipment Availability for Insp in Field.List Updated During Wk of 820322 by Field Walkdown + (Forwards Updated Equipment List Providing Status of Equipment Availability for Insp in Field.List Updated During Wk of 820322 by Field Walkdown)
- ML20076E920 + (Forwards Updated Equipment Lists Reflecting Plant Mods, Current NRC Views & Licensee Continuing Review,In Response to 10CFR50.49, Environ Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants)
- ML20100M521 + (Forwards Updated Equipment Qualification Items Summary, Including Description of Methods of Environ Qualification for Each Equipment Item Discussed at 840405 Meeting,In Response to SER Re Environ Qualification)
- ML17298B429 + (Forwards Updated Equipment Qualification Summary Sheets & Revised Responses to NRC Comments on Util . Qualification Status of All TMI Action Plan Equipment Noted in Previous Submittals Confirmed Per Sser 5 (NUREG-0857))
- ML20086P327 + (Forwards Updated Escrow Agreement of Mit & First Natl Bank of Boston.Copy of Agreement Being Forwarded to Mendonca)
- HNP-93-855, Forwards Updated Estimate & Schedule in Format Requested in NRC Administrative Ltr 93-03, Operator Licensing Natl Exam Schedule + (Forwards Updated Estimate & Schedule in Format Requested in NRC Administrative Ltr 93-03, Operator Licensing Natl Exam Schedule)
- ML20092K451 + (Forwards Updated Estimate of RT PTS & Beltline Matls Data, Per NRC 910515 Issuance of Rev to 10CFR50.61(b)(1) Requirements.Updated Estimate Demonstrates Adequate Margins of Safety to Screening Criterion for Circumferential Welds)
- ML20141E970 + (Forwards Updated Evaluation of Ability of San Onofre,Unit 2 SG Tube Eggcrate Supports to Perform Design Function,Per 970509 Meeting)
- ML20059A989 + (Forwards Updated Exam Schedule & Note for Operator Licensing Exams,Requalificiation Exams & Generic Fundamental Exams)
- ML20065D495 + (Forwards Updated Exam Schedule for Facility,In Response to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule)
- ML20116G706 + (Forwards Updated Exam Schedules & Notes Re Operator Licensing Natl Exams,Requalification Exams for FY93-96 & Generic Fundamental Exams for Oct 1992 & Feb & Jun 1993,per Generic Ltr 92-06)
- ML20054L514 + (Forwards Updated Executive Summary,Section 1.2 of IE Bulletin 79-01B Rept.List Updated to Reflect Replacement Equipment Installed During Refueling Outage as Well as Info Re Equipment Testing & Procurement/Delivery Schedules)
- RBG-18-167, Forwards Updated FSAR & Environ Rept - OL Stage,Per 840622 Request.W/O Encls.Related Correspondence + (Forwards Updated FSAR & Environ Rept - OL Stage,Per 840622 Request.W/O Encls.Related Correspondence)
- B12475, Forwards Updated FSAR Chapters 3,5,6,9,12,13 & 14 for Millstone Unit 1.Revs to Updated FSAR Chapters Submitted on 861217 Also Encl + (Forwards Updated FSAR Chapters 3,5,6,9,12,13 & 14 for Millstone Unit 1.Revs to Updated FSAR Chapters Submitted on 861217 Also Encl)
- ML20205M410 + (Forwards Updated FSAR Chapters 3,5,6,9,12,13 & 14 for Millstone Unit 1.Revs to Updated FSAR Chapters Submitted on 861217 Also Encl)
- ML20207T665 + (Forwards Updated FSAR Containing All Necessary Changes Since Mar 1985 Submittal of post-OL Rev 1.Update Considered Accurate to 860920.App 9A, Fire Protection Analysis..., Assumes Approval of 870306 Proposed Tech Spec Change)
- ML20207L533 + (Forwards Updated FSAR Fire Protection Matl in Preparation for Upcoming NRC Fire Protection Audit.Submittal Contains Info for Resolution of SER Open Item 5 & Confirmatory Item 48c.Matl Will Be Incorporated Into Amend 14 to FSAR)
- ML17298B695 + (Forwards Updated FSAR Listings of Correspondence Affecting Existing Licensing Documents,For Which Amends Will Not Be Issued Prior to Issuance of OL for Unit 1.Listings Supersede 841207 Submittal)
- ML19272A712 + (Forwards Updated FSAR Pages 12.1-72,13.1-17,13.1-18,13.1-19 & 13.1-20.FSAR Updated as of 840301,to Include Facility or Procedure Changes,Licensee Performed Safety Evaluations & Analyses of New Safety Issues)
- ML19320D537 + (Forwards Updated FSAR Pages 3.8-24 Through 3.8-26a,Pages 17.1-11 Through 17.1-14b & Question & Response Pages 17.1-1 Through 17.1-4 in Response to NRC .W/O Encl)
- ML20127P787 + (Forwards Updated FSAR Per .Initial Final Hazards Summary Rept Submitted in 1959 & Last Updated in mid-1960s. Updated FSAR Includes All Incorporated Design Changes as of 850112.Safety Evaluations Will Be Included in 860712 Rev)
- ML20134B044 + (Forwards Updated FSAR Ref Drawing Print Book)
- ML20024C297 + (Forwards Updated FSAR Section 1.7,describing Quality Program for Operational Phase,Per 10CFR50.54(a)(2).Info Will Be Incorporated Into Next Updated FSAR Annual Rev.Justification Encl)