ML17300B034
| ML17300B034 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/27/1987 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 161-00467-JGH-J, 161-467-JGH-J, GL-81-27, NUDOCS 8709100137 | |
| Download: ML17300B034 (6) | |
Text
r REGULAT INFORM*TION DISTRI HUT ION YSTEM
( R IDS )
ACCESSION NBR: 8709100137 DOC. DATE: 87/08/27 NOTARIZED:
NO DOCKET 5 FACIL:STN-50-528 Palo Verde Nuclear Stationi Unit ii Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Stations Unit 2i *rizona Pub 1 i 05000529 STN-50-530 Palo Verde Nuclear Stations Unit 3i Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION HAYNES> J. G.
Arizona Nuclear Power Prospect (formerly Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION
SUBJECT:
Emergency plan implementing procedure updatei consisting of revised index. Withholding of bracketed info on indicated pages requestediper Generic Ltr 81-27 5 10CFR2. 790(a) 5 10CFR9. 5(a). N/870827 ltr.
DISTRIBUTION CODE:
A045D COPIEB RECEIVED: LTR /
ENCL J SIZE:
TITLE:
OR Submittal:
Emergency Preparedness Plans'mplement'g Proceduresi C
NOTES: Standardi zed p lant.
05000528 Standardi zed p lant.
05000529 Standardized plant.
05000530 RECIPIENT ID CODE/NAME PD5 PD DAVIS' INTERNAL: AEOD/DOA/IRB
~I 01 EXTERNAL:
LPDR NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME LICITRAzE NRR/DREP/EPB NRC PDR COPIES LTTR ENCL 1
1 NOTES' 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
,0
Arizona Nuclear Power Project P.O. SOX 52034 O
PHOENIX. ARIZONA85072-2034 August 27, 1987 161-00467-JGH/JBK U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
Docket Nos.
STN 50-528 (License NPF-41)
STN 50-529 (License NPF-51)
STN 50-530 (License NPP-65)
Emergency Plan Implementing Procedure Update Pile:
87-002-493; 87-056-026
Dear Sir:
In accordance with 10 CPR 50, Appendix E, ANPP is submitting updated Emergency Plan Implementing Procedures (EPIPs) which are marked with an "X" in the Attachment.
If you have any questions or require additional information, do not hesitate to call.
Very truly yours, J.
G.
Haynes Vice President Nuclear Production JGH/JBK/dim Attachments cc:
0.
M. De Michele E.
E.
Van Brunt, Jr.
J.
B. Martin E. A. Licitra A. C. Gehr J. Ball G. A. Brown Document Control Desk (w/a)
(w/a)
(w/a)
(w/a)
(w/a)
(w/a)
(w/Copy 6 and Copy 9)
(w/Copy 7 and Copy 8) 8709lOOi37 870827 PDR ADO'. ~50DOg28 F
PDR goes
~ 4 xt
+C P+
I f
ATTACHMENT A EMERGENCY PLAN IMPLEMENTING PROCEDURE UPDATE Updated "X"
X Cancel Cancel Cancel EPIP No.
02 03 04ll 12 13 14 14A 14B 14C 15 16 17 18 19 20 21 22 23 24 25 26 27 30 31 33 38 56 57 Revision No.
05 11 12 06 05 06 00 06 04 02 05 04 04 04 05 06 04 05 04 04 04 04 05 02 05 05 08 03 02 PCN No.
03 03 02 03 03 00 00 08 00 00 00 01 01 00 00 Ol 02 00 00 00 01 01 00 00 00 00 00 01 00 I
Marked Pa es*
p ~l l5>
7p 8p 10>
19~ 28~
,Q I
INone 5, 6, 7
- In accordance with Generic Letter No.
81-27, certain EPIPs contain information considered private or proprietary (including
- names, home telephone
- numbers, and internal and external telephone numbers which must remain available during an emergency).
The specific information has been bracketed on the indicated pages. 'e request this information be considered confidential and withheld from public disclosure pursuant to 10 CFR 2.790(a) and 10 CFR 9.5(a).
h P'