ML20207T665

From kanterella
Jump to navigation Jump to search
Forwards Updated FSAR Containing All Necessary Changes Since Mar 1985 Submittal of post-OL Rev 1.Update Considered Accurate to 860920.App 9A, Fire Protection Analysis..., Assumes Approval of 870306 Proposed Tech Spec Change
ML20207T665
Person / Time
Site: Fermi 
Issue date: 03/18/1987
From: Agosti F
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20207T666 List:
References
VP-NO-87-0053, VP-NO-87-53, NUDOCS 8703240228
Download: ML20207T665 (3)


Text

^

[5cN[8't Nuclear Operations 9

O<

March 18,1987 VP-NO-87-9953 U. S. Ntaclear Regulatory Camission Attn: Document Control Desk Washington, D. C. 20555

Reference:

1)- Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Submittal of Fermi 2 Updated Final-Rafety Arudvain Ramort Pursuant to 18CFR59.71(e), Detroit Edison hereby submits the Updated Final Safety Analysis Report (UFSAR) for Fermi 2 S e signed original and ten additional copies of the UFSAR are enclosed; one copy will be s@mitted to Region III and one copy to the site inspector.

He UFSAR contains all necessary changes since s2mittal of Post % Revision 1 in March 1985 and is considered accurate to Septenber 29, 1986, six months prior to this submittal. Otanges made under the provisions of 19CFR59.59 are r @orted pursuant to 18CFR59.59(b).

%e UFSAR has been prelared according to the format of Regulatory Guide 1.79, Revision 1, and is an update of the original FSAR. Where applicable, Appendices to the original FSAR have been incorporated in the body of the text. This initial UFSAR is a " clean" document without change bars or revision riunbers.

Appendix 9A, " Fire Protection Analysis and Review of.

Appendix A to BTP APGB 9.5-1" assunes NRC approval of Proposed Technical Specification Change -(License Amendment) - Fire Suppression Systems (3/4.7.7),

VP-NO-87-9919, duted March 6, 1987. It is understood that such approval will be forthmming and this change has been included in Appendix 9A so that the UFSAR will be accurate at the time the Technical Specification is approved. %is information is being submitted under separate cover. Detroit Edison will cuttinue to follow the Technical Specifications until such time as the change is approved.-

i 0

'Y 0703240228 870318 PDR ADOCK 05000341::

a M

PDR t

J USNRC

  • * ~

March 18, 1987 VP-NO-87-9953 Page 2 Chapter 13 has been updated to include the organization presently in effect under the Vice President - Nticlear.

Operations and Plant Manager.

Future revisions of the UFSAR will be subnitted at least annually and will reflect all changes up to six months prior to the date of stixnission.

Sincerely, 4--0[

k

~

Enclosure cc: Mr. A. B. Davis Mr. E. G. Greenman (one copy of UFSAR)

Mr. W. G. Rogers (one copy of UFSAR)

Mr. J. J. Stefano a

~

e c

w

,w r

e.-,-

-g w

en

--w--

r

---w-w,

l l

I, FRANK E. AGOSTI, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and beltef.

E h

FRANK E. AdOSTI Vice President Nuclear Operations a

// #

M day of

, 1987, On this before me personally appeared Frank E. Agosti, being first duly sworn and says that he executed the foregoing as his free act and deed.

M Notary Public twe uo.ic, vuosr.tenaw Lounty, Mi r

My Commission Expires Dec.28,1987 6-&

t