eru Telephone (412) 456 6000 Nuclear Division P O. Don 4 Shippingport, PA 15017&J04 June 30, 1982 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn:
Mr. Steven A. Varga, Chief Ope ra t ing Reactors liranch No. 1 Division of Licensing Washington, DC 20555
Reference:
licave r Valley Pcue r Sta t ion, Unit No. 1 Docket No. 50-334, License No. DPk-66 1E bulletin 79-01B Gen t len.en :
On June 24, 1982, the Commission approved an immediately effective interim rule that suspends the June 30, 1982 deadline for environmental qualification of electrical equipment originally imposed by the Commission's Memorandum and Order (CL1-80-21) dated May 27, 1980. This requirement is also currently contained in our Technical Specifications as a result of the Commission's Order for Modification of License dated October 24, 1980.
We unders tand that no additional submittals or actions are required of us at this time rega rding this interim rule.
Ilowever, our qualification ef forts are still centinuing, and we ate providing an updated status for your infor-nation.
Attached is an updated Executive Summary (Section 1.2 of our IE Bulletin 79-01B Report). The list was updated to reflect replacement equipment installed during our refueling outage as well as current information regarding equipment testing and procurement / delivery schedules.
If you have any questions concerning this subject, please contact my office.
/
Very ruly yours, hloY8
/
J. J. Carey Vice President, Nuclear Attachment G207080200 020630 PDR ADOCK 05000334 O
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 License. No. DPR-66 0
IE Bulletin 79-01B s
Page 2 cc:
Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission s
Beaver Valley Power Station Shippingport, FA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 United States Nuclear Regulatory Commission Of fice of Inspection and Enforcement Division of Reactor Inspections Operation Washington, DC 20555 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Attn:
R. C. Ilaynes, Regional Director Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 i
s
\\
5 1
1
s s
s j
79-01B EXECUTIVE
SUMMARY
UP-DATE 6/28/82 INDEX ITEM QUAL DEFICIENCY PLANNED ACTION STATUS 5-Inst. Cables Cables tested to' Acidic e Test to be performed e Awaiting test Cont. Wire &
rather than caustic pH e Incorporated as part results Cable Co.
levels.
of DCP #351 7-Terminal Not tested per test pro-
,eTesttobe[ performed e Awai. ting test Blocks gram for instrument &
for" Inst;& Co.st. Tern.
results Buchanon control term. blocks blocks f i
s e Power Term' Blocks will e Replacement of be replaced as part of Power Terminal l
D'CP #351 Blocks awaiting
\\~
approval of qualificatio\\t iI I
i.
s s
i
~ ^
tests I
i i',
10-Solencid,
4 Solenoid Conduit con-e
- into sealing e Awaiting test valve ASCO nection installed
.erial as part of results from NP-8320 & 8316' unse n,l,ed
\\ DCP #351 splice afg.
" i for their Env acceptability
,i-e-
e Test seal-s
)i
': ~
Crouse-Hinds s
y 2
S
"\\
EYS 316 Fitt-
.g N T-ing with
+
s g
s' s.
N
~,,
CHICO "A" Compound
'[
-g'
.c e
(
~
Jg
. failed the s
s l
i w
test l
J'
\\
e Looking'into sealing e Test seal 11-Limit Conduit connection '
s.
l switch,NAMCO installed unsealed material'as part of fitting EA-180 N'
DCP #351
% ~
's e Awaiting test "x
results from
\\
splice mfg.
s fair their Env
'~
x...,"
~
acceptablility 13-Limit Switch Conduit connection
- e,Looking into sealing e Test seal NAMCO EA-740 installed unsealed
, material as put of fitting
'N.-
DCP J351-4 s
s
\\,
t
^
i N,
i Is
(*
+
i.
g 4,,
N.
e
~ [ ;., ~
~,
i
. p.
V 1
J s
Page 2 INDEX ITEM QUAL DEFICIENCY PLANNED ACTION STATUS Awaiting test 14-Steam Flow Qual. may not meet time e Replace it with e
- Trans, margin qualified transm'itter results Fischer & Porter in DCP #35i Model #1032496 15-Flow Caustic Spray, post-e Replace it with quali-Awaiting test e
transmittter accident time require-fied transmitter in results Barton 386 ment and submergence DCP #351 not met i
16-D/P Qual Testing did not e Obtain information from e Awaiting test transmitter address thermal aging test results Barton 764 prior to DBE & caustic Lot 2 spray test did noc address high pH i ei 17-Level Improper test sequeice e Review Test results of e Qualified for transmiteter
& scaling method new series of GEMS Level short term CEMS-XM-59342
/
Transmitters which are operation
' c'urrently under-going qualification test 18-Level Trans-No qual. fnformation-e Replace it with qualif-e Awaiting test mitter Mason-available' '
ied transmitter in results 4 e Neilan #12522 DCP #351 19-Pressure No qual. information e Replace with qualified e Awaiting test Transmitter available tran3mitter in DCP #351 resules Fischer & Porter
/
, y y
- 50EP1 f,
i 20-Pressure Qualification testing o Obtain information e Awaiting test j
Barton 763 did not, address thermal on aging results l
aging prior to DBE 21-Level Trans-Caustic cpray & post-e Replace with qualified e Awaiting test mitter Barton accident time requita-transmitter in DCP #351 results
- 386 Steam Gen, ment not met' /.
Wide-range (LT FW.477,487 &
498) 22-RTD wide &
Not qualified e Replace with Qual RTD in e Awaiting test narrow range for radiation DCP #351 results 23-Temperature No qual, information e Replaced in 2nd Refuel-e Conditionally resistence bulb available (originally) ing Outage with Conax Qualified by Trinity RTD in (DCP #351)
Page 3 INDEX ITEM QUAL DEFICIENCY PLANNED ACTION STATUS 25-Valve motor MOV contains Class B in-e Re-design & retest by e Delivery 40 wks'
' operator-sulation. They failed mid-summer of 1982 after passes test Limitorque during testing e Replace with qualified e Awaiting MOV-SI-842 motor operator test results i,MOV-CH-310 Motor Operator is not e Modify MCC in DCP e MCC was l
qualified for submergence
- 351 (Control circuits)
/
Modified in DCP #351 27-Acoustic Fo qualification informa-e Obtain test data e Already in-l Monitpr ENDEVC0 tion stalled before 2273AM20 2nd Refueling Outage in DCP #292 e Test in pro-gress, final test report will be issued by Aug. 1982.
29-Terminal Test deficiency e Conduct additional e conditionally Blocks-Marathon testing Qualified 1500-series
+
31-Splicas No qualification informa-e Replaced splices in e Qualified 4
Kerite tion available 2nd Refuleing Outage (originally) with qualified Kerite splice in DCP #351 32-SIS-Wire Qualification information e Replace in areas where e Currently being GE Vulkene not available harsh environment occurs being invest-57275 gated 36-Solenoid No qualification informa-e Replaced by e Qualified Valve CO-liPX-tion available ASCO/NP8320A189E in DCP #351 i
37-Solenoid Radiation Test deficiency e Replaced by ASCO/
e Qualified valve per ASCO NP831655E in DCP #351 Model LB-831654 38-Limit Switch No qualification inforna-e Replaced by NAMCO/
e Qualified NAMCO-D2400X tion available EA 180-11302 in DCP #351
Page 4 INDEX ITEM QUAL DEFICIENCY PLANNED ACTION STATUS 39-Limit Switch No seals e Looking into sealing e Awaiting test NAMCO-EA-740 material as part of test results DCP #351 from splice mfg. for their Env. accept-ability (RAYCHEM) 40-Flow Trans-No qualification informa-e Replace with qualified e Awaiting test mitter tion transmitter in DCP #351 results Fischer & Porter
- 10B24969BBAABDB 41-Pressure No qualification informa-e Replace with qualified e Awaiting test Transmitter tion transmitter in DCP #351 results Fischer &
Porter #
10B24969BBAABDB 42-Pressure No qualification informa-e Replace with qualified e Awaiting test Transmitter tion transmitter in DCP #351 results Fischer &
Porter #
50EP1041BCXB 46-4160-V
- 1) No radiation inform-e Replaced in 2nd Refuel-e Conditionally pump motor-ation onRS-P-2A & 2B ing Outage in DCP #351 Qualified Louis-Allis
- 11) No temp information e Qualify by analysis e Currently in-on FW-P-3A & 3B or replace vestigating