Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136B393 + (Forwards Revised TMI-1 Draft Order W/Indicated Additions & Deletions.Final Copy Encl)
- ML20217J813 + (Forwards Revised TMI-1 License Page 7 & TS Page 6-1, Reflecting Change in Trade Name of Owners & Operators of Plant.Editorial Changes Do Not Affect Signficant Hazards Consideration Analysis Contained in Licensee)
- ML20211F371 + (Forwards Revised TMI-1 TS Page Re Steam Line Break Accident Dose Consequence Which Was Inadvertently Ommited from Suppl to LAR 269)
- ML17329A516 + (Forwards Revised TS & List of Commitments,Per 920513 Telcon Agreement to Submit Results of Steam Line Break Analysis Prior to Cycle 13.Commitments Incorporate Criteria from WCAP-13187,App a Into Plant Procedures)
- ML17329A517 + (Forwards Revised TS & List of Commitments,Per 920513 Telcon Agreement to Submit Results of Steam Line Break Analysis Prior to Cycle 13.Commitments Incorporate Criteria from WCAP-13187,App a Into Plant Procedures)
- ML20210L324 + (Forwards Revised TS 2.1-1,incorporating Note Which Indicates That Proposed Change to SL MCPR Applicable for Current Operating Cycle (Cycle 16) Only)
- ML20035H366 + (Forwards Revised TS 3.1.5, Control Rod Scram Accumulators, Reflecting Results of NRC Discussion W/R Ose)
- ML20137N023 + (Forwards Revised TS 3.1.6 Bases Pages Deleting Detection Time of Reactor Bldg Air Particulate Monitor for RCS Leak of 1 Gpm)
- ML20125B164 + (Forwards Revised TS 3.3.2 & 3/4.8.1 to Require solid-state Load Shedder Emergency Load Sequencers & 4 Kv Bus Undervoltage Devices Be Operable in Plant Modes 5 & 6)
- ML18100A490 + (Forwards Revised TS 3.3.3.7, Post-Accident Monitoring Sys, Table 3.3-11 & 4.3-11 from 930223 Application for Amends to Licenses DPR-70 & DPR-75)
- ML18100A491 + (Forwards Revised TS 3.3.3.7, Post-Accident Monitoring Sys, Table 3.3-11 & 4.3-11 from 930223 Application for Amends to Licenses DPR-70 & DPR-75)
- ML20046C704 + (Forwards Revised TS 3.5.1,ECCS-operating.TS Is LCO 3.5.1 for Previously Transmitted Bases for TS 3.5.1)
- ML20134H223 + (Forwards Revised TS 3.7 Bases,Indicating Info Deleted)
- JSP-110-94, Forwards Revised TS 3/4.4.3.1, RCS Leakage - Leakage Detection Sys, Changing Specific Wording & Location of Footnote + (Forwards Revised TS 3/4.4.3.1, RCS Leakage - Leakage Detection Sys, Changing Specific Wording & Location of Footnote)
- RBG-34-790, Forwards Revised TS 4.0.5,3.4.3.1 & 3.4.3.2 Re Unidentified Drywell Leakage Sump Flow Monitoring,Per Generic Ltr 88-01 & Discussions W/Nrc.Util Accepts Original Generic Ltr Guidance + (Forwards Revised TS 4.0.5,3.4.3.1 & 3.4.3.2 Re Unidentified Drywell Leakage Sump Flow Monitoring,Per Generic Ltr 88-01 & Discussions W/Nrc.Util Accepts Original Generic Ltr Guidance)
- ML20072A179 + (Forwards Revised TS 5.3, Reactor Core Design Features from 940216 Application,Per Discussions W/Nrc)
- ML18011A225 + (Forwards Revised TS 6.5.2, Plant Nuclear Safety Committee, Changing Member Composition,Per Discussion W/Nrc)
- ML18011A226 + (Forwards Revised TS 6.5.2, Plant Nuclear Safety Committee, Changing Member Composition,Per Discussion W/Nrc)
- ML20211C802 + (Forwards Revised TS Amend Re Reactor Bldg Structural Integrity.Previously Submitted TSs Contained Editorial Error)
- NOC-AE-000404, Forwards Revised TS Bases 3/4.2.5,clarifying That Averaging of Only Three Channels Is Min Expected When Verifying DNB Parameter Compliance.Bases Have Been Changed Per 10CFR50.59 + (Forwards Revised TS Bases 3/4.2.5,clarifying That Averaging of Only Three Channels Is Min Expected When Verifying DNB Parameter Compliance.Bases Have Been Changed Per 10CFR50.59)
- ML20057E213 + (Forwards Revised TS Bases 3/4.7.1.2 Re Emergency Feedwater Sys)
- ML20154L381 + (Forwards Revised TS Bases 3/4.8.4,in Order to Clarify Thermal Overload Operation for Motor Operated Valves with Maintained Contact Control Switches.Attached Pages Are Provided to Update NRC Records as Appropriate)
- ML20128B583 + (Forwards Revised TS Bases Changes to Licenses DPR-77 & DPR-79,in Response to 920526 Application.Changes Clarify Terms Hourly & Continuous When Applied to Requirements for Performing Fire Watch Patrols)
- ML18101B118 + (Forwards Revised TS Bases Concerning Containment Penetration Conductor Overcurrent Protective Device Info)
- ML18101B119 + (Forwards Revised TS Bases Concerning Containment Penetration Conductor Overcurrent Protective Device Info)
- NPL-99-0064, Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement + (Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement)
- ML20134N899 + (Forwards Revised TS Bases Page B 3/4 2-5 for Plant)
- ML20134N903 + (Forwards Revised TS Bases Page B 3/4 2-5 for Plant)
- ML20151L744 + (Forwards Revised TS Bases Page B 3/4.9-8.Words and Buses Energized by Normal Power Were Deleted)
- ML20035H653 + (Forwards Revised TS Bases Page B3/4 7-1 to Be Included in Unit 2 TS Bases Section.Due to Administrative Error,Page Not Included)
- ML20045D804 + (Forwards Revised TS Bases Page,As Followup to 920507 Application for Amends to Licenses DPR-42 & DPR-60, Relocating Containment Penetration List from TS Section 4.4 Into Plant Procedures,Per GL 91-08 & NRC Comments)
- NOC-AE-000023, Forwards Revised TS Bases Page,Per 10CFR50.59 as Described in Util + (Forwards Revised TS Bases Page,Per 10CFR50.59 as Described in Util)
- ML20205S303 + (Forwards Revised TS Bases Pages 90,227,164 & 221a,accounting for Change in Reload Analysis from Yaec to GE Methodology, Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation)
- ML20217Q413 + (Forwards Revised TS Bases Pages B 3/4 6-6,B 3/4 7-16, B 3/4 7-23 & B 3/4 9-8 for Changes Originally Submitted on 980316.Changes to TS Bases Sections Address Application of Correction Factor to Be Used in Surveillance Procedures)
- LR-N990132, Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 1997 + (Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 1997)
- NOC-AE-000348, Forwards Revised TS Bases Pages Changed Per 10CFR50.59.Ref Was Added to Bases Section 2.1.1 Because Figure Provides DNBR Curves Appropriate to Alternate DNB Operating Criteria + (Forwards Revised TS Bases Pages Changed Per 10CFR50.59.Ref Was Added to Bases Section 2.1.1 Because Figure Provides DNBR Curves Appropriate to Alternate DNB Operating Criteria)
- ML20217N467 + (Forwards Revised TS Bases Pages Re Safety Limits,Reactivity Control Systems & Afs.Changes Were Made Per 10CFR50.59 & Have Been Approved by Plant Operation Review Committee)
- ML20198B946 + (Forwards Revised TS Bases Pages Which Were Implemented by McGuire IAW 10CFR50.59,including ITS 3.7.11 LCO Bases Re Auxiliary Bldg Ventilation Exhauset Sys)
- ML18106A662 + (Forwards Revised TS Bases Pages for Sections 3/4.1.3, 3/4.1.2,3/4.5.5 & 3/4.9.1.Revised Bases Pages Were Reviewed Through 10CFR50.59 Process by Station Operations Review Committee & Approved by General Manager-Station Operations)
- LR-N980227, Forwards Revised TS Bases Pages for Sections 3/4.1.3, 3/4.1.2,3/4.5.5 & 3/4.9.1.Revised Bases Pages Were Reviewed Through 10CFR50.59 Process by Station Operations Review Committee & Approved by General Manager-Station Operations + (Forwards Revised TS Bases Pages for Sections 3/4.1.3, 3/4.1.2,3/4.5.5 & 3/4.9.1.Revised Bases Pages Were Reviewed Through 10CFR50.59 Process by Station Operations Review Committee & Approved by General Manager-Station Operations)
- ML20202B609 + (Forwards Revised TS Bases Pages for Specification 3/4.6.1.1. TS Bases Have Been Revised to Clarify When Verification of Primary Containment Integrity May Be Performed by Administrative Means)
- ML18102A151 + (Forwards Revised TS Bases Pages for Specs 3.4.9.3 & 3.4.10.3)
- ML18102A152 + (Forwards Revised TS Bases Pages for Specs 3.4.9.3 & 3.4.10.3)
- ML20210R003 + (Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves)
- ML20207C685 + (Forwards Revised TS Bases Pages,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4)
- ML17180B098 + (Forwards Revised TS Bases Pp 3.3/4.3-9,3.3/4.3-7,3.3/4.3-7a & B 3/4.3-14 Reflecting Alternate Method of Reactivity SDM Demonstration Testing for Plants)
- ML20216D891 + (Forwards Revised TS Bases Section 3/4.4.9.Changes Consisted of Removing One Example Used on Bases as Means of Providing Cold Overpressure Protection)
- ML18106B077 + (Forwards Revised TS Bases Sections 3/4.1.2,boration Sys, 3/4.1.3,moveable Control Assemblies for Unit 1 only,3/4.5.5, Refueling Water Storage Tank & 3/4.9.1,boron Concentration. NRC Has No Objection to Changes)
- ML20083C898 + (Forwards Revised TS Bases for Reactor Coolant Pump Bus Undervoltage & Underfrequency.Changes Result of Safety Evaluation Which Reclassified Undervoltage & Underfrequency Reactor Coolant Pump Bus Trips)
- ML18152B385 + (Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis)
- ML18152B360 + (Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis)
- ML20044H535 + (Forwards Revised TS Basis for Llo 3.10.11 Re Low Power Physics Test)